Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
18 Mar 2021, 5:00 pmClosed
Ex.Engineer PHE Division Shopian
PHE Division Shopian
Same as above
2021_PHE_120174_1
Fresh NIT57/PHS OF 2020-21
Open Tender
Civil Works - Water Works
Item Rate
15 days
District Shopian
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Xen PHE Shopian (Account -0215)
Exempted
24 Mar 2021
11 Mar 2021
18 Mar 2021
11 Mar 2021
18 Mar 2021
11 Mar 2021
Amount
Providing & laying of stone soling hand packed in trenches.(Nallah)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-incharge.Made of G.I. wire of dia 4 mm
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for:
Spiral staircases (including landings)
Extra for shuttering in circular work (20% of respective centering and Shuttering items)
12mm Cement plaster finished with a floating coat of neat cement of mix:1 : 3 ( 1 cement : 3 fine sand)
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing & fixing of M.S Flanges 12mm thick including cost of flanges, nuts, bolts, washers and all sorts of carriages involved up to the site of work. Complete job.50 mm dia.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Carriage of material from source upto site of work by mechanical means incl. loading, unloading and stacking complete.
Sand & Stone aggregates for an avg. lead of 25 kms.
Stone soling for an avg. lead of 20 km
Extra Carriage of material from dumping site to actual site of work by manual means (Head load) for an avg lead of 400 mtrs.
Sand & Stone aggregates
Stone soling
KHURSHID AHMAD KOKA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .