Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance PLOT NO DSS 170 HUDA SHOPPING COMPLEX SECTOR 31 FARIDABAD FARIDABAD HARYANA FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | ₹1.5 Cr | L1 | Accepted-Finance Being L- 1 |
| 2 | L2₹1.6 Cr+₹8.2 L (5.49%)Rejected-Finance 379 B FIRST FLOOR CHIRAG DELHI NEW DELHI 110017 | NEW DELHI | SOUTH DELHI | DELHI | 110017 | ₹1.6 Cr+₹8.2 L (5.49%) | L2 | Rejected-Finance Not Being L- 1 |
| 3 | L3₹1.7 Cr+₹18.3 L (12.3%)Rejected-Finance 306 BAKSHI HOUSE 40 41 NEHRU PLACE NEW DELHI 110019 DELHI | SOUTH EAST | DELHI | 110019 | ₹1.7 Cr+₹18.3 L (12.3%) | L3 | Rejected-Finance Not Being L- 1 |
| 4 | L4₹1.8 Cr+₹28.4 L (19.1%)Rejected-Finance 301 VARDHAMAN CHAMBER II VIKASPURI NEW DELHI 110018 | WEST | DELHI | 110018 | ₹1.8 Cr+₹28.4 L (19.1%) | L4 | Rejected-Finance Not Being L- 1 |
| 5 | L5₹1.8 Cr+₹34.7 L (23.3%)Rejected-Finance PLOT NO 1235 JLPL SECTOR 82 SAS NAGAR MOHALI MOHALI PUNJAB 160055 | S A S NAGAR | PUNJAB | 160055 | ₹1.8 Cr+₹34.7 L (23.3%) | L5 | Rejected-Finance Not Being L- 1 |
| Sl No | Description | Qty | Unit | Arctic Engineering Services L4 | VOLKS ENERGIE PVT LTD L3 | Ace Cooling Solutions L7 | AIR DESIGN SOLUTIONS L2 | Blue Star Ltd L5 | S G TECHNOFAB PVT LTD L1 | INSOL Inc L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SH-I: VRV/ VRF Work (BOQ Item No:- 01 to 10) Supplying, Installation, Testing & Commissioning of Modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling/heating having 100% hermetically sealed inverter type twin Rotary/Scroll Compressor(s), minimum two compressors (with individual separate PCB) for above 6 HP modules, microprocessor based Controller, top discharge type condensing unit(s), with R-410-A Refrigerant or equivalent, vibration Isolators with suitable foundation etc. complete as required. To have better efficiency condensor fan shall be capable to operate at different speed with respect to load.The unit shall deliver the rated capacity and in confirmation as per IS 18728:2024 and CPWD Specifications and work even at 50°C ambient temperature without tripping. The system shall be able to deliver 100% of the rated capacity upto 39 °C. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply and BMS compatible. The unit shall be filled with first charge of the refrigerant and ready for use as required. The condenser should be coated with a hydrophilic film to prevent water accumulation on the surface of the heat exchanger, enhance water dispersion, and reduce the risk of degradation, thereby improving overall performance and durability. The Indian Seasonal Energy Efficiency Ratio (ISEER) of the unit shall be as per Energy Conservation and Sustainable Building Code (ECSBC) 2024 as below and complete as per CPWD specification, connections, inter connections etc. as required. (For capacity <40 kWr ISEER 7.4, Capacity > 40 and <70 ISEER 7.5, Capacity > 70 ISEER 7.6 for super ECSBC Building) For Cooling or Heating or Both. The VRV/VRF unit should be an higher energy-efficient model compliant with BEE regulations. The unit should have free phase technology / Phase loss / Missing phase so that unit can work in case of phase reversal and PCB protection low and high voltage support. compressor operate together as one logical unit, sharing refrigerant load, control signals, Allows continued operation (If one compressor fails continuosly running remaining compressor, like as master and slave configuration). Including all the dip switches and/or control wiring as per OEM recommendation. Refrigerant suction/Liquid line tapping including Pressure testing, vaccummissing of the VRV/VRF system complete as per specifications etc. as required. The outdoor unit shall be installed on Soft Soil at Gronnd Level i/c providing anti-vibration mounting. The PCC base is excluded from this scope. | ||||||||||
| 1.01 | Outdoor Unit:- 6 HP | 1 | Job | 1,15,500 ₹1,15,500 | 2,00,000 ₹2,00,000 | 1,15,628 ₹1,15,628 | 1,83,500 ₹1,83,500 | 1,01,485 ₹1,01,485 Lowest | 1,74,000 ₹1,74,000 | 1,20,000 ₹1,20,000 |
| 1.02 | Outdoor Unit:- 60 HP ( In combination of 03 Units with all units having double compressor) | 5 | Job | 11,70,500 ₹58,52,500 | 10,00,000 ₹50,00,000 | 13,35,491 ₹66,77,455 | 9,88,932 ₹49,44,660 | 12,99,690 ₹64,98,450 | 9,35,000 ₹46,75,000 Lowest | 13,04,000 ₹65,20,000 |
| 2.00 | Indoor Unit
Supplying, Installation, Testing and Commissioning of following minimum capacity 4 way Cassette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration Isolation etc., suitable for operation on single phase 230 V ± 10%, 50Hz AC supply, complete, as required. The Indoor units must shut down upon receiving a singal from the BMS System/Fire Singnals. The system shall be capable to adjust air flow as per room requirement in auto mode. The cooling capacity of indoor unit will be at air inlet conditions of 27 °C DB and 19 °C WB temperature. (Make will be same as of Outdoor)
Indoor Unit:- 4.0 TR to 4.2 TR
Note:- The cutting / fixing of existing false ceiling for fixing of cassette IDUs and making good the same, all labour, packing materials, tools, scaffolding, and disposal of debris is included in the scope. | 51 | Each | 49,850 ₹25,42,350 | 40,000 ₹20,40,000 | 33,154 ₹16,90,854 | 29,090 ₹14,83,590 Lowest | 47,010 ₹23,97,510 | 38,329 ₹19,54,779 | 50,000 ₹25,50,000 |
| 3.00 | Indoor Unit
Supplying, Installation, Testing and Commissioning of following minimum capacity and external static pressure VRF/VRV ceiling mounted mid high static ductable type Indoor unit equipped with washable synthetic media prefilter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, Cordless Remote, outer cabinet, vibration Isolators, drain pan, drain pump, other necessary supports etc., suitable for operation on single phase AC supply 230 V ± 10%, 50 Hz complete as required. The Indoor units must shut down upon receiving a singal from the BMS System/Fire Singnals. The system shall be capable to adjust air flow as per room requirement automatically. The cooling capacity of indoor unit will be at air inlet conditions of 27 0C DB and 19 0C WB temperature. (Make will be same as of Outdoor)
High Static Ductable units (minimum 49 to 77 pascal external static pressure) - 4.0 TR to 4.2 TR
Note:- The High Static Ductable units needs to be hanged from the existing false ceiling through MS rods / hanger alongwith MS frames as per stie requirement complete in all aspect. Minor cutting / modification in existing false ceiling required for fixing of suspended ductable units and making good the same, all labour, packing materials, tools, scaffolding, and disposal of debris is included in the scope. | 5 | Each | 57,500 ₹2,87,500 | 60,000 ₹3,00,000 | 31,405 ₹1,57,025 Lowest | 45,847 ₹2,29,235 | 39,755 ₹1,98,775 | 46,610 ₹2,33,050 | 60,000 ₹3,00,000 |
| 4.00Supply, Installation, Testing and Commissioning of Y/T/Refnet/Multi Joints for Indoor and Outdoor units as applicable to the system design and OEM recommendation. | ||||||||||
| 4.01 | Indoor Units | 50 | No | 3,600 ₹1,80,000 | 3,000 ₹1,50,000 | 3,405 ₹1,70,250 | 3,600 ₹1,80,000 | 3,185 ₹1,59,250 | 2,718 ₹1,35,900 Lowest | 4,000 ₹2,00,000 |
| 4.02 | Outdoor Multi Joint | 10 | No | 8,500 ₹85,000 | 6,000 ₹60,000 | 14,211 ₹1,42,110 | 6,750 ₹67,500 | 3,620 ₹36,200 Lowest | 5,175 ₹51,750 | 4,000 ₹40,000 |
| 5.00 | Supply installation testing and commissioning of Gas Tight Joints for ODU connection at suction and discharge pipelines.No brazing to be done at outdoors (01 Set consist of- 1 Joint for suction valve and 1 for discharge service valve). | 10 | Set | - | 200 ₹2,000 | 52 ₹520 Lowest | 100 ₹1,000 | 145 ₹1,450 | 1,955 ₹19,550 | 20,000 ₹2,00,000 |
| 6.00COPPER REFRIGERANT PIPING Supplying, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for VRV/VRF system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastometric nitrile rubber tubular sleeves sections of 19 mm thick insulation as given below for Suction and Liquid lines, all accessories as per specifications etc. as required : Copper Pipe laying each indoor unit to outdoor unit should be properly and covered arrangements from outdoor to indoor unit to be made in open area as per site requirement. Additionally, the copper pipes must be wrapped with fiberglass insulation tape and coated with UV-resistant paint. The size of refrigerant pipes shown below are tentative. The required size of pipe shall be designed by the vendor as per the manufacturers recommendations. | ||||||||||
Tender Value
₹1.9 Cr
EMD Value
₹5.6 L
Closing Date
15 May 2026, 6:55 pmClosed
AGM (Engg. Elect.), CHIAL
AGM (Engg. Elect.), Shaheed Bhagat Singh International Airport, Chandigarh Project engineering office, Mohali PB- 140306
Provision of VRV / VRF type AC system in Fixed Finger at Shaheed Bhagat Singh International Airport, Chandigarh along with AICMC for 08 Years (After 02 Years of DLP)
2026_AAI_275564_1
CHIAL-Chandigarh/Engg. (E)/Fixed Finger/VRV/NIT-02/2026-27
Open Tender
Electrical Works
Item Rate
120 days
Shaheed Bhagat Singh International Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Chandigarh International Airport Limited
₹5.6 L
7 Aug 2026
23 Apr 2026
18 May 2026
23 Apr 2026
15 May 2026
23 Apr 2026
23 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH-I: VRV/ VRF Work (BOQ Item No:- 01 to 10) Supplying, Installation, Testing & Commissioning of Modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling/heating having 100% hermetically sealed inverter type twin Rotary/Scroll Compressor(s), minimum two compressors (with individual separate PCB) for above 6 HP modules, microprocessor based Controller, top discharge type condensing unit(s), with R-410-A Refrigerant or equivalent, vibration Isolators with suitable foundation etc. complete as required. To have better efficiency condensor fan shall be capable to operate at different speed with respect to load.The unit shall deliver the rated capacity and in confirmation as per IS 18728:2024 and CPWD Specifications and work even at 50°C ambient temperature without tripping. The system shall be able to deliver 100% of the rated capacity upto 39 °C. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply and BMS compatible. The unit shall be filled with first charge of the refrigerant and ready for use as required. The condenser should be coated with a hydrophilic film to prevent water accumulation on the surface of the heat exchanger, enhance water dispersion, and reduce the risk of degradation, thereby improving overall performance and durability. The Indian Seasonal Energy Efficiency Ratio (ISEER) of the unit shall be as per Energy Conservation and Sustainable Building Code (ECSBC) 2024 as below and complete as per CPWD specification, connections, inter connections etc. as required. (For capacity <40 kWr ISEER 7.4, Capacity > 40 and <70 ISEER 7.5, Capacity > 70 ISEER 7.6 for super ECSBC Building) For Cooling or Heating or Both. The VRV/VRF unit should be an higher energy-efficient model compliant with BEE regulations. The unit should have free phase technology / Phase loss / Missing phase so that unit can work in case of phase reversal and PCB protection low and high voltage support. compressor operate together as one logical unit, sharing refrigerant load, control signals, Allows continued operation (If one compressor fails continuosly running remaining compressor, like as master and slave configuration). Including all the dip switches and/or control wiring as per OEM recommendation. Refrigerant suction/Liquid line tapping including Pressure testing, vaccummissing of the VRV/VRF system complete as per specifications etc. as required. The outdoor unit shall be installed on Soft Soil at Gronnd Level i/c providing anti-vibration mounting. The PCC base is excluded from this scope. | |||||
| 1.01 | Outdoor Unit:- 6 HP | - | Job | - | - |
| 1.02 | Outdoor Unit:- 60 HP ( In combination of 03 Units with all units having double compressor) | - | Job | - | - |
| 2Indoor Unit Supplying, Installation, Testing and Commissioning of following minimum capacity 4 way Cassette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration Isolation etc., suitable for operation on single phase 230 V ± 10%, 50Hz AC supply, complete, as required. The Indoor units must shut down upon receiving a singal from the BMS System/Fire Singnals. The system shall be capable to adjust air flow as per room requirement in auto mode. The cooling capacity of indoor unit will be at air inlet conditions of 27 °C DB and 19 °C WB temperature. (Make will be same as of Outdoor) Indoor Unit:- 4.0 TR to 4.2 TR Note:- The cutting / fixing of existing false ceiling for fixing of cassette IDUs and making good the same, all labour, packing materials, tools, scaffolding, and disposal of debris is included in the scope. | |||||
| 3Indoor Unit Supplying, Installation, Testing and Commissioning of following minimum capacity and external static pressure VRF/VRV ceiling mounted mid high static ductable type Indoor unit equipped with washable synthetic media prefilter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, Cordless Remote, outer cabinet, vibration Isolators, drain pan, drain pump, other necessary supports etc., suitable for operation on single phase AC supply 230 V ± 10%, 50 Hz complete as required. The Indoor units must shut down upon receiving a singal from the BMS System/Fire Singnals. The system shall be capable to adjust air flow as per room requirement automatically. The cooling capacity of indoor unit will be at air inlet conditions of 27 0C DB and 19 0C WB temperature. (Make will be same as of Outdoor) High Static Ductable units (minimum 49 to 77 pascal external static pressure) - 4.0 TR to 4.2 TR Note:- The High Static Ductable units needs to be hanged from the existing false ceiling through MS rods / hanger alongwith MS frames as per stie requirement complete in all aspect. Minor cutting / modification in existing false ceiling required for fixing of suspended ductable units and making good the same, all labour, packing materials, tools, scaffolding, and disposal of debris is included in the scope. | |||||
| 4Supply, Installation, Testing and Commissioning of Y/T/Refnet/Multi Joints for Indoor and Outdoor units as applicable to the system design and OEM recommendation. | |||||
| 4.01 | Indoor Units | - | No | - | - |
| 4.02 | Outdoor Multi Joint | - | No | - | - |
| 5Supply installation testing and commissioning of Gas Tight Joints for ODU connection at suction and discharge pipelines.No brazing to be done at outdoors (01 Set consist of- 1 Joint for suction valve and 1 for discharge service valve). | |||||
| 6COPPER REFRIGERANT PIPING Supplying, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for VRV/VRF system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastometric nitrile rubber tubular sleeves sections of 19 mm thick insulation as given below for Suction and Liquid lines, all accessories as per specifications etc. as required : Copper Pipe laying each indoor unit to outdoor unit should be properly and covered arrangements from outdoor to indoor unit to be made in open area as per site requirement. Additionally, the copper pipes must be wrapped with fiberglass insulation tape and coated with UV-resistant paint. The size of refrigerant pipes shown below are tentative. The required size of pipe shall be designed by the vendor as per the manufacturers recommendations. | |||||
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
DNIT.pdf
Tender Documents • 11.38 MB
BOQ_321931.xls
BOQ • 0.36 MB
CORRIFIXEDFINGER.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .