Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹36.5 L
Closing Date
30 Apr 2026, 3:00 pmClosed
Office of Executive Engineer, C.D. Prayagraj-01
Office of Executive Engineer, C.D. Prayagraj-01, UPAEVP Teliyarganj, Prayagraj
Construction of CM Model Composite School Devrikala, Tahsil-Madihan District-Mirzapur.
2026_UPHDB_1133709_1
387/Lekha-2/49 Date 25.03.2026
Open Tender
Civil Works - Buildings
Percentage
540 days
Devrikala Madihan Mirzapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Office of Executive Engineer, C.D. Prayagraj-01
₹36.5 L
Yes
30 Apr 2026
6 Apr 2026
30 Apr 2026
6 Apr 2026
30 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Hard rock (requiring blasting) | - | CUM | - | - |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | - | CUM | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | - | CUM | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | - | - |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floorWith Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | SQM | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR LINTEL] M-20. | - | CUM | - | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR SUNSHADE] M-20. | - | CUM | - | - |
| 8 | Same as above item but for the lighter beams i.e. having spans upto 6 m. (Using 1:1.5:3 Mix concrete) | - | CUM | - | - |
| 9 | Same as above item but for slabs (Using 1:1.5:3 Mix concrete) | - | CUM | - | - |
| 10 | Same as above item but for R.C.C. Raft foundation and footing with approved stone ballast. (Using 1:1.5:3 Mix concrete) | - | CUM | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
F.pdf
Tender Documents • 0.24 MB
BOQ_2116258.xls
BOQ • 2.16 MB
T.pdf
Tender Documents • 9.09 MB
IMG_0001.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .