Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹20.4 L+₹46,337.51 (2.32%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹20.8 L+₹86,694.04 (4.34%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹20.0 L
EMD Value
₹25,000
Closing Date
14 Jul 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
installation and commissioning of 1200 mm wide x 175 mtr length belt conveyor at 2D 24L to 2D 29L belt of Shyamsundarpur Colliery under Bankola Area .
2023_ECL_282913_1
ECL/GM/BA/E TENDER/23-24/EnM/14 Dt. 04.07.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Shyamsundarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹25,000
20 Sept 2023
4 Jul 2023
15 Jul 2023
4 Jul 2023
14 Jul 2023
4 Jul 2023
4 Jul 2023 - 8 Jul 2023
Amount
Item Description/ Heading
Transporting & installation of complete 1200 mm drive with gear motor & base frame 14MT + discharge unit 2.75MT+ loop take up tensioning trolley drum 3.6MT + fixed unit with drum 1MT + load table 01 nos =1MT + tailend 1MT +1200 mm wide conveyor structure with top bootm roller & foot stool 175 mtr 80KG/Mtr =14MT + stater 1.5 MT +tail end shifting 2 time s +2 times 2MT +load table shifting 2 times 2MT total weight =42.85 MT
Making load table 02 nos
fitting of tail end discharge skapper
Belt laying including transportation of belt jointing tensioning trail run etc
providing bolts and nut for fitting of above structure 175 mtr 1.5KG/mtr =262.5KG load table dischaarge & bend pulley loop take up 25KG= 287.5KG
Foundation bolting for drive unit 38 nos +discharge unit 24 nos +loop with fixed unit 36+tail end (8X 2) nos tatal =114 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumables .
Cost of fastner
Cleaning coal and unused materials & lavelling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame discharge base & loop take up cement concrete .
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .