Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.8 Laccepted-aoc | accepted-aoc |
Tender Value
₹24.8 L
EMD Value
₹50,000
Closing Date
26 Dec 2025, 9:30 pmClosed
Directorate of Municipal Administration
VIJAYAKUMAR R
Construction of Nala bridge in Sorabadamath galli opposite to Niyaz cement Adde at ward no 65.
DMA/2025-26/BR/WORK_INDENT48980
DMA/2025-26/BR/WORK_INDENT48980
Open
Bridges/Culverts
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
8 documents required · 8 mandatory
₹630
₹50,000
26 Dec 2025
12 Dec 2025
22 Dec 2025
Construction of Nala bridge in Sorabadamath galli opposite to Niyaz cement Adde at ward no 65.
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
Earth work excavation by manual means for drains, canals, waste weir, draft,
approach channels, key trenches, foundation of Buildings & bridges and such
simillar works in all kinds of soils, as per dr...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Supplying, filling, spreading & leveling stone boulders of size range 5 cm
to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all
complete as per direction of Engineer-in-cha...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Additionalities for Formwork, Centering & Scaffolding for earth retaining Structures finished rate of Concrete per m3 10% Earth Retaining Structure
Dewatering the sewage / storm water by using reqired HP submersible
pump for the diversion of storm / sewage during the execution of work.
Considering for one Pump. 20 hp pump
Providing weep holes in Brick masonry/Plain/ Reinforced
concrete abutment, wing wall/ return wall with 100 mm dia
AC pipe, extending through the full width of the structure with
slope of 1V :20H towar...
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/
Kankar/Moorum. (Tipper 5.5 m3)
Hydraulic Excavator of 1.1 m3 bucket
Tractor-Trolley
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
government notification bc loc letter to be issue_221012_101522.pdf
Instructions to Tenderers • 1.75 MB
kw2- 48980.doc
Tender Document • 1.01 MB
format of bankers certifiate.pdf
Instructions to Tenderers • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .