| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC | ₹31.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹31.5 L+₹2,826.40 (0.09%)Rejected-AOC JAWAHAR ROAD BHARTHANA DISTRICT ETAWAH UTTAR PRADESH | BHARTHANA | ETAWAH | UTTAR PRADESH | 206242 | ₹31.5 L+₹2,826.40 (0.09%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents incomplete |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents incomplete |
| 5 | Rejected-Technical | - | - | Rejected-Technical Documents incomplete |
Tender Value
₹31.5 L
EMD Value
₹62,940
Closing Date
12 Feb 2019, 5:00 pmClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
Construction of Fall at km. 9.900 of Kabrai Main Canal.(LOT-9)
2019_UPIDC_302649_9
08/SE/2018-19
Open Tender
Civil Works
Item Rate
90 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹62,940
Yes
21 Oct 2021
6 Feb 2019
14 Feb 2019
6 Feb 2019
12 Feb 2019
6 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. GST will be paid after the deduction of 4% VAT.
Excavation of foundation in all type of strata excluding hard rock including disposal with all leads, lifts & T&P etc for proper completion of job as per direction of Engineer-in-Charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supplying and laying sand in inverted filter including cost of material, labour and T&P etc with all leads & lifts for proper completion of job, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A40 M10 Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 4.30 bags per cum including cost of all material, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M15 Reinforced Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 6.10 bags per cum including cost of all material but excluding cost of steel, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing and laying steel for reinforcement including cost of Steel, Cutting, bending, placing in position, binding with G.I. wire, & welding etc. including cost of all material, labour, T&P and all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing and fixing Centering and shuttering for R.C.C. work including cost of all material, labour, T&P and all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Random course rubble stone masonry in 1:3 cement, sand mortar including all cost of material, labour T&P and all lead & lifts for proper complition of job as per derection of Engineer-in-Charge including all tax like Income tax, Labour cess etc but excluding G.S.T.
Raised of struck pointing on stone masonry 1:2 cement sand mortar including all cost of material, labour T&P and all lead & lifts for proper complition of job as per derection of Engineer-in-Charge including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A40 M20 Reinforced Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 7.90 bags per cum including cost of all material, but excluding cost of steel, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply and Laying sotne grit 40 mm size in inverted filter including cost of material, labour and T&P etc with all leads & lifts for proper completion of job, as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Excavation in making canal section in all type of starta excluding hard granite rock including compaction dressng watering and disposal of excavated material as directed of Engineer-in-charge, including all lifts and T&P etc. for proper compaction of Job including all tax like Income tax, Labour cess etc but excluding G.S.T.
M/S KEDAR SINGH YADAV AND SONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .