| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 CrAccepted-AOC NO 32 BAJANAI KOIL STREET PUDUPADI POST KILAMBADI VILLAGE ARCOT | ARCOT | RANIPET | TAMIL NADU | ₹1.0 Cr | L-1 | Accepted-AOC Lowest Rate |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Technical Scsrutinized |
Tender Value
₹1.0 Cr
EMD Value
₹1.1 L
Closing Date
12 May 2023, 3:00 pmClosed
Project Director
Project Director DRDA-Ranipet 632403
Strenthening of Road from Arcot Villupuram road to Arani Kannamangalam Road (via Krishnavaram) Arcot Block of Ranipet District Pacakage no.39 in Ranipet District
2023_RDTN_308697_1
A11/1031/2023
Open Tender
Civil Works
Works
90 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
19 Jun 2023
29 Apr 2023
12 May 2023
29 Apr 2023
12 May 2023
29 Apr 2023
Amount
1.Package No.38/2022-23 1- Road work in Arcot Block MGSMT 2022-23
Strengthening the Road From Arcot Villupuram Road to Arani Kannamangalam Road via (krishnapuram)KM 0/-1/994
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied Thermoplasic compound with Reflectorising Glass Beads on Bituminous Surface
Supply and fixing of HM Stone
Supply and fixing of KM Stone
Road Furniture
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification and fixed over 2mm thick Aluminium sheet fixed over a black supporting frame of25MMx25mmx3mm Mild steel angle and supported on a mild steel angle post 75x75x6 mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundadation with M15 grade cement concrete 45cmx45cmx60cm size including cost and conveyance of all materials , equipment, Machinary and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. Higj intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro - reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67 - 2012 ( as per MORTH Specification No 801)
Stop sign board
Major Road ahed
Rumble strip ahed
Rumble strip
Road marker road Stud with lens Reflector
Provision For Sign board 60 cm Equlateteriangle
Provision For Name board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
1st Year
2nd Year
3rd Year
4th Year
5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .