| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹33.8 L+₹1.9 L (5.91%)Rejected-Finance HOUSE NO 40 CHOTTI BARADARI PART I GARHA ROAD NEAR MEDICAL COLLEGE JALANDHAR PB 144022 | JALANDHAR | JALANDHAR | PUNJAB | 144022 | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | L3₹34.1 L+₹2.2 L (6.94%)Rejected-Finance NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | L4₹34.5 L+₹2.6 L (8.15%)Rejected-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | L4 | Rejected-Finance BEING NOT LOWEST | |
| 5 | L5₹37.0 L+₹5.1 L (15.9%)Rejected-Finance | L5 | Rejected-Finance BEING NOT LOWEST |
Tender Value
₹38.5 L
EMD Value
₹77,000
Closing Date
1 Nov 2022, 6:00 pmClosed
ARJUN PATRO,IDSE
GE U ELECTRIC SUPPLY,DELHI CANTT
PROVN OF LED STREET LIGHT FITTINGS ALONGWITH POLE INCLUDING CONNECTED ITEMS FOR CARRIAPA PARADE GROUND AREA UNDER GE(UTILITY) ELECTRIC SUPPLY DELHI CANTT 10
2022_MES_542141_1
GE ELECT/D-60/2022-2023
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE U ELECTRIC SUPPLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE U ELECTRIC SUPPLY
₹77,000
Yes
12 Dec 2022
3 Oct 2022
3 Nov 2022
3 Oct 2022
1 Nov 2022
20 Oct 2022
Amount
Supply, laying, testing and commissioning of UG cable XLPE insulated, armoured heavy duty electric cable, 1100 volts grade with stranded aluminium conductor of 16 sqmm 4 core complete all as specified and directed.
Supply, laying, testing and commissioning of UG cable XLPE insulated, armoured heavy duty electric cable, 1100 volts grade with stranded aluminium conductor of 35 sqmm 4 core complete all as specified and directed.
Supply, laying, testing and commissioning of UG cable XLPE insulated, armoured heavy duty electric cable, 1100 volts grade with stranded aluminium conductor of 50 sqmm 3.5 core complete all as specified and directed.
Supply, laying, testing and commissioning of UG cable XLPE insulated, armoured heavy duty electric cable, 1100 volts grade with stranded aluminium conductor of 120 sqmm 3.5 core in replacement complete all as specified and directed.
Excavation in trenches not exceeding 1.5m wide & not exceeding 1.5m in depth and n.exc 10 sqm on plan for foundations , laying of LT under ground cables/ GI pipes and steel tubular poles etc. and getting out as in soft / loose soil complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc. 25 cm deep as in soil complete all as specified and directed.
Removal of excavated material n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above in starting point.
S & F Common burnt bricks as mechanical protection of UG cables using old size sub class ‘B’ bricks laid dry flat over the cable width equal to the length complete all as specified and directed.
Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables and in substation ducts for cushioning of cables etc, complete all as specified. (Measurement should be after punning down)
M/L for GI Tubes,of size 40 mm dia light grade, galvanised, with all fitting , laid in trenches for protection of cable in road /drain crossing complete all as specified and as directed.
M/L for GI Tubes,of size 80 mm dia light grade, galvanised, with all fitting , laid in trenches for protection of cable in road /drain crossing complete all as specified and as directed.
M/L for GI Tubes,of size 80 mm dia light grade, galvanised, with all fitting , laid in trenches for protection of cable in road /drain crossing complete all as specified and as directed.
Supplying and installation of hot dipped galvanized iron octagonal pole having 8 mtr height , wall thickness 3mm , top dia 70mm , bottom dia 130mm , size of base plate 225x225mm , 16mm thick , approx 300 mm long weather proof door opening should have an integral inbuilt looping box duly mounted with one No. MCB, SP, 10 Amp, 4 way heavy duty connector and earth stud including S&F of 3 core, 1.5 Sqmm PVC insulated and PVC round sheathed, copper conductor cable, 1100 Volts grade from MCB to street light bimetallic connection to be used wherever Alumunium & Copper wire/busbar encountered at joints, factory made standard single /double arm bracket 1.2m long made of 40mm dia GI pipe medium grade , 04 Nos foundation bolt ,M20 threaded made to J shape 700mm long steel grade EN8 with nuts templates .Foundation of pole shall be of size 600x600mm and depth 1400mm by using RCC 1:1:5:3 ,8 Nos 16mm dia tor bar as main bars and 8mm dia Tor bars stirrups @ 150mm c/c confirming to IS: 1786 latest edition. The foundation shall extend above surroundings ground/drive way level for 200mm and casted with 02 Nos 63 mm dia HDPE pipe for cable in and out as per site requirement complete all as directed. Note:- The cost of construction of foundation for pole including earth work, RCC , steel bars , stirrups , Fdn bolts , HDPE pipes etc are required at site is deemed to be included in the quoted rate. Make Havells/Bajaj/Surya/CG.
Supply & fixing 90 Watt LED street light fittings made up of pressure die cast housing with toughned glass and individual high power LEDs with secondary optics, IP66 protection complete all as specified and directed. Make Havells 90W Endura Cityliner Neo LED street light LHETAXU7IN6J090 or equivalent model of given make(s) in the "LIST OF MAKES" here in after
Supply, installing, testing and commissioning in replacement of factory made and tested Bus bar chamber outdoor type with canopy made out of 3.15 mm CRCA MS sheet, and 40x40x5mm thick MS angle iron frame work, powder coated finish over one coat of red oxide primer on outside surface and painted inside with two coats of red oxide primer, front opening type, with apron for cable entry closing locking arrangement of size not less than 450mm x 450mm x 300mm with 4 Nos 500 Amps aluminium bus bar and with 250 Amp MCCB, 4 pole, 36 KA, 415 Volt 50 Hz including excavation, earth work and platform for the Bus bar chamber with PCC 1:4:8 type D-2 with 40 mm graded stone aggregate, 15 cm thick in foundation, brick work in CM 1:6 with sub class 'B', old size bricks, rendering 15 mm thick in CM 1:6 on exposed surfaces and 100 mm thick PCC padding 1:3:6, type C-1 using 20 mm graded stone aggregate on top and grouting bolts etc for Bus bar chamber. The platform shall be such that it is of a height 45 cm above the nearest road level.
Boring of hole under road/pavement/hard standing or any other situation by manual means and suitable for passing of GI pipe 100 to 150 mm bore and making good both ends all specified and directed
Supply & fixing of 16 M high mast shaft (in two section) having minium 410 mm bottom, 150 mm top, 4/3 mm section thickness, PCD 490 mm with base plate of 560x25mm with two wire rop system and accessories. Accessorie include Head frame, Lantern ring with 08 Nos, of lim arms (symmetrically arrangement), wire ropes, power tool, AOL bracket and 01 set of foundation acccessories, each set consistists of minimum 08 Nos of M30x850mm bolts with anchor plate and 10% templates, suitable for 47 m/sec wind speed including RCC foundation as per drawing atteched.
(a) MAST STRUCTURE:- The high Mast shall be of continuously tapered, polygonal cross section polygon type (Minimum 16- Sides) of 15/16 Mtrs. in height presenting good visual appearance and shall be based on proven design to given assured performance, reliability and service. The Mast shall have an approximate top diameter of say 150 mm to 200 mm and bottom diameter of 410 mm to 450 mm, The weight of the Mast shall not exceed more than 1600 kgs, excluding weight of Luminaire, to maintain good elasticity of slender structure. (b) MAST CONSTRUCTION :- The Mast shall be fabricated from special steel plates of BS EN 10025 grade, cut and folded to form polygonal section and shall be telescopically jointed and fillet welded. The welding shall be in accordance with BS: 5135. The procedural weld geometry and the workmanship shall be exhaustively tested by the radiography on the completed welded and certificates submitted. The Mast shall be delivered in only 2 sections without any circumferential welding at site, which shall be joined together by slip-stressed-fit method. The joining shall be with stressing equipment, thus forming the sleeve joint. No site welding or bolted the joint will be accepted. The overlap distance shall have full penetration of longitudinal welds. The base plate of the mast shall be at least 25 mm. thick. An adequate door opening min 1400mm x 300mm shall be provided at base of each mast such as to permit clear access to equipment like winches, cable pug and socket, etc. The opening shall be complete with a close fitting vandal resistant, weather-proof door provided with a heavy duty lock. For metal protection of the Mast, the entire fabricated Mast shall be hot dip galvanised internally and externally, having minimum average thickness of 65 microns.
(c) DYNAMIC LOADING:- The Mast structure shall be designed for an assumed maximum reaction arising from the maximum wind speed at Mendhar and measured at a height of 10 Mtrs. above ground level . The design life of the Mast shall be min. 25 years. Wind excited oscillation shall be damped by the method of construction and adequate allowance made for the related stresses. The offered High Mast shall be a tested design. (d) FOUNDATION:- The tenderer shall see the site closely and minutely with regard to the nature of the soil, average depth of decomposed garbage and debris at proposed Mast locations and the other site conditions before working out the type of foundation and specifications for the proposed High Mast. The tenderer shall be responsible for the design of the foundation and safe erection and installation of the High Mast in mechanically and structurally safe working condition for the design life of the Mast as per manufacture design The load bearing (safe) capacity of the soil shall be indicted by purchaser to decide the type of foundation and its specifications. The holding down bolts shall be at least 8 Nos of high tensile strength and shall be supplied complete with anchor plate of 6 mm thick for casting into the foundation. The ensure correct vertically and horizontality of bolt alignment. (Note : Cost of foundation as per specification of manufacturer shall be deemed to be included in the rate quoted by the contractor)
(e) LANTERN CARRIAGE:- The fabricated lantern carriages shall be provided for holding fittings and control gear provided on each High Mast. The lantern carriage shall be of special design and of durable steel tube construction designed to act as electric conduit with cable holes fully protected by grummets. The diameter of the lantern carriage shall be suitable so as to hold designed number of LED floodlight fittings, as specified in the tender design along with the control gear boxes and lantern. The lantern carriage shall be fabricated in three parts joined by bolted flanges with SS bolts with nuts to enable easy removal from the erected mast for replacement/ maintenance purpose. The carriage shall be supported/ suspended by three wire ropes for better stability. The lantern carriage Assembly shall not touch the lower surface of the Mast. The carriage design and fabrication shall be such that the lantern carriage will suit the lanterns and their control gear boxes to be used in the work. The Lantern Carriage shall be so installed that it does not cause any damage to the surface of the Mast and is provided with protective buffer arrangement. The complete Lantern carriage shall be hot dip galvanised after fabrication. The weather - proof cast aluminum junction boxes (IP-66) shall be provided on the Lantern carriage assembly from which the inter- connections will be made to the designed number of floodlight fittings and lanterns on the carriage.
(f) MECHANICAL ARRANGEMENT:- For installation and maintenance purpose, it will become necessary to raise or lower the lantern carriage assembly. To enable this, a suitable winch arrangement shall be provided in the base of the Mast, complete with top pulley, winch stainless steel wire ropes and winch driving power tool. (i) WINCH:- The winch shall be of completely self-sustaining type. the winches shall be of self- sustaining type by means of an oil bath and the lubrication shall be of recommended quality. Termination of the ropes of the winch shall be in such a way, that it does not involve distortion or twisting of the rope configuration. At least 6 turns of rope shall remain in tension on the drum even when the lantern carriage is fully lowered. the winch shall be designed to be installed or removed form the door opening at the base of the mast. The winch drums shall be grooved to ensure mechanically strong, stable and tidy rope lay with no chances of rope slippage or skippage. The winch shall be capable of operation by hand or by means of external power tool. Integrated power tool with worm is not acceptable. A test certificate shall be supplied along with each winch in support of the maximum load operated by the winch and for the safety of operation at the full load rotation. A handle shall also be provided for hand operation of the winches.
(ii) TOP PULLEY ASSEMBLY:- The top pulleys shall be of a diameter, appropriately large enough to accommodate the steel wire ropes and the multicore electric cable. The material of construction of the pulley blocks shall be non- corrosive and made of dia cast (LM-6) aluminum alloy. The pulley assembly shall be complete with self lubricating bearing and stainless steel spindle. (iii) STAINLESS STEEL WIRE ROPES:- Stainless steel wire shall be AISC 316 grade 7/ 19 construction 2 Nos ropes for winch and 3 Nos for lantern carriage, 6 mm dia having a breaking load capacity of 2350 kg complete with stainless steel thimbles. The end for connection to the winch drum shall be fitted with thimbles and the thimbles shall be secured by copper compression splices.
(g) CABLE AND CABLE CONNECTIONS :- The connections shall be made with flat core flexible round sheath power cables of appropriate rating as per the schedule. The base compartment of the High Mast shall have one terminal box for terminating the incomer cable. The maintenance cables equal to that within the Mast and fitted with travelling cable 5 core 4 sqmm flexible having plug socket shall be provided to energize lanterns while in lowering position by hooking up at the base compartment socket supply. Similarly, the provision shall be made for electric supply at the base compartment to enable operation of the external power tool for lowering or rising of the lantern carriage assembly. The trailing cables of the lantern carriage rings shall be terminated by means of metal cased plug and socket provided in the base compartment to enable flexibility.
(h) WINCH DRIVING POWER TOOL :- The electric driven tool shall be single speed, (1.2 Mt/min) reversible three phase & hand operated motor. The power tool shall be complete with very robust remote control switch such that the tool can be operated from safe distance of 5 Mtrs. There shall be and arrangement for self alignment off power tool which can be self supported during operation. Manual handle shall be provided for hand operation of the winches. The capacity rating and speed of the electric motor used in the power tool shall be specified by the tenderers. (j) LIGHTNING FINIAL & AVIATION OBSTRUCTION LIGHTS:- One number heavy duty hot dip galvanised lighting finial shall be provided for each mast. Suitable aviation obstruction lights of reliable design and reputed manufacturer shall be provided on top of each mast.
Supply and fix LED Flood light 200W including all fixing accessories completed all as per specified and directed. Make:- Surya Cat No. SLF FL 200W IP 65 Lumos or equivalent make as mentioned in List Of Make.
Supply and fixing of twin dome aviation obstruction lights including all fixing accessories completed all as per specified and directed. Make:- Surya Cat No SLF AL 108 LDR SEN IP 65 or equivelent in Philips/GE
BLANK
S&F 4 mm dia MS wire 150 mm x 100 mm mesh, made upto into mattress or cages appx 1.5 mtr height and fixed with flate iron/angle by welding in position and directed including complete all as specified and directed.Note:- MS angle /MS flate will be measured and paid seperately.
M & L for two coats of synthetic enamel paint of silver colour on steel surfaces over a coat of red oxide primer including preparation of surfaces complete all as specified.
Material and labour for cement concrete type D-2, 1:4:8 (using 40 mm graded crushed stone aggregate) for sub floors, sub-bases, floors, foundation and paving etc complete all as specified and directed .
M&L for MS work of angles for post and struts of fencing around transformer plinth etc drilling holes, flate iron fillet for securing wire mess by welding to angle iron frame and framed work as in door/ gate of angle and wire mess. Door to be fixed by 03 Nos 100mm long hinges and one sliding door bolt of 300mm long for locking arrangement complete all as specified including.
Demolition of path /concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) .complete all as specified and as directed.
Supply and fixing LED Flood light 120 Watt including all fixing accessories completed all as per specified and directed.
Earthing complete with galvanised steel earth plate electrode 60×60cm.× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised earth lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion
Earthing complete with galvanised steel earth plate electrode 60 cm x60 cm x 6 mm thick buried directly in ground ,Earth pit not less than 2.25 meter deep below ground level) with top edge of plate not less than 1.5 meter below normal ground level ,connected to and including galvanised iron earth wire 25 X 4 mm by means of nut, bolts, check nuts and washers of galvanised iron or steel and provision of charcoal dust and common salt packed all around the earth plate including necessary excavation and earth work in soft/loose soil and testing complete all as specified and directed and shown in electrical plate number 3 of MES SSR part-I (2009) (a) Excavation and earth work for electrode in soft/loose Soil. (b) PCC pit in cement concrete 1:2:4 type B-1, Pre cast RCC cover with suitable handle 40 mm thick in PCC 1:2:4 type B-1, reinforced with welded steel wire . (c) Funnel with watering pipe of GI 20 mm nominal bore light grade and lugs etc complete all as specified and directed (d) 40 mm nominal bore medium grade GI protection pipe for protection of earthing lead complete all as specified and directed. (e) Requisite quantity of common salt and charcoal. (f) Testing of earthing.
Note : contractor should procure and provide 50 % of the material as listed above within 15 days of the placing of work order and shall be verified by the Eng-in-charge
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .