Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 135 L BLOCK SRIGANGANAGAR 335001 RAJASTHAN | SRIGANGANAGAR | SRIGANGANAGAR | RAJASTHAN | 335001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance A 164 KARNI NAGAR OPP HOTEL KARNI BIKANER RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | Admitted-Finance |
| 4 | Admitted-Finance 1472 14TH FLOOR AGARWAL CYBER PLAZA II NETAJI SUBHASH PALACE PITAMPURA NEW DELHI 110034 | NEW DELHI | NORTH WEST DELHI | DELHI | 110034 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER PROJECT CHETAK
HEAD QUARTERS CHIEF ENGINEER PROJECT CHETAK, BIKANER C/O 56 APO, PIN 931707
EXECN OF RESURF WK WITH BC 3 CM TH COMP AND CORRECTION WK BC MAT AND BERM FILLING DRESSING ON EITHER SIDE OF RD CENTRE LINE EDGE LINE MARKING ON RD SARDARPUR-BIKA-DABLA(32ML) BET KM 0 to 27pt618 AND LINK ROAD TO SARDARPUR BIKA DABLA BET KM 0 TO
2021_BRO_611874_1
CE (P) CTK/26/2020-21
Open Tender
Civil Works - Roads
Item Rate
180 days
SARDARPUR-BIKA-DABLA(32ML) AND LINK ROAD TO SARD
AS PER TENDER DOCUMENTS
13 documents required · 13 mandatory
₹0
Exempted
HQ CE PROJECT CHETAK, BIKANER
9 Apr 2021
25 Jan 2021
23 Feb 2021
27 Jan 2021
22 Feb 2021
11 Feb 2021
27 Jan 2021 - 10 Feb 2021
5 Feb 2021
120 days
Amount
ROAD SARDARPUR-BIKA-DABLA(32ML) BETWEEN KM 0.00 TO 27.618
Execution of resurfacing works by providing and laying 3.00 cm thick (compacted) Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified compacted thickness for resurfacing works and correction works with BC material on Road SARDARPUR-BIKA-DABLA(32ML) BETWEEN KM 0.00 TO 27.618 under 141 DMC/49 BRTF Project Chetak in the The State of Rajasthan. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract.
Execution of Edge line marking with hot applied thermoplastic paint (2.5 mm thick) conforming to clause 803.4 of MORTH specifications for road and bridge works (Fifth revision) including preparation of surface and application on ROAD ROAD SARDARPUR-BIKA-DABLA(32ML) BETWEEN KM 0.00 TO 27.618 under 101 RCC/49 BRTF Project Chetak in the The State of Rajasthan. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract.
PART-II ROAD LINK ROAD TO SARDARPUR BIKA DABLA BETWEEN KM 0.00 TO KM 3.00
Execution of resurfacing works by providing and laying 3.00 cm thick (compacted) Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified compacted thickness for resurfacing works and correction works with BC material on Road LINK ROAD TO SARDARPUR BIKA DABLA BETWEEN KM 0.00 TO KM 3.00 under 141 DMC /49 BRTF Project Chetak in the The State of Rajasthan. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract.
Execution of Edge line marking with hot applied thermoplastic paint (2.5 mm thick) conforming to clause 803.4 of MORTH specifications for road and bridge works (Fifth revision) including preparation of surface and application on ROAD LINK ROAD TO SARDARPUR BIKA DABLA BETWEEN KM 0.00 TO KM 3.00 under 141 DMC /49 BRTF Project Chetak in the The State of Rajasthan. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract.
M/s Raja construction company
SHRI GANPATI CONSTRUCTION COMPANY
Ram Parkash Constructions Pvt. Ltd.
ASEEM AND COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .