Loading…
Loading…
Tender Value
₹14.5 L
EMD Value
₹29,100
Closing Date
27 Sept 2026, 6:55 pm4d left
Executive Engineer
Karchham Division HP.PWD. Bhabanagar
C O Sheep Sharing Hall and Sheep Dipping Tank at Chhitkul, Distt. Kinnaur, H.P.
2026_PWD_143929_3
5917 dated 18.09.2026
Open Tender
Civil Works
Percentage
90 days
Sangla
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹29,100
22 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
27 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock , including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | - | Per Cubic meter | 328.65 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 5.42 | Per Cubic meter | 2,492 | ₹13,506.64 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work complete upto all floor level in walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc.including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 20.52 | Per SQM | 699.5 | ₹14,353.74 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 4.1 | Per Cubic meter | 9,447.5 | ₹38,734.75 |
| 5 | Providing and laying cement concrete 1:6:12 (One cement : Six sand : Twelve graded/crushed/crushed stone aggregate 40mm (Forty millimetre) nominal size) mechanically mixed and curing complete excluding cost of form work in foundation and plinth including carriage of materials within all leads and lifts complete in all respect. | - | Per Cubic meter | 4,332.7 | - |
| 6 | Providing and laying cement cocnrete work 1:2:4 ( One cement two sand isto four crushed stone aggregate 20mm. (twenty milimetre) nominal size) mechanically mixed and vibrated including curing complete including form work and reinforcement for reinforced concrete work as per HP.PWD specification of 1990 volume-1 including carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts and as per the direction of the Engineer-in-charge in moulding in cornices, window sills etc. in all floor level in all heights. | - | Per Cubic meter | 7,020.9 | - |
| 7 | Steel reinforcement (TATA /SAIL / JINDAL PANTHER/ Shyam steel make) for R.C.C. work including straightening, cutting, placing in position and binding all complete work including cost of binding wire upto all floor level Thermo-Mechanically Treated bars of grade Fe-500D (five hundred) or more steel bars including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 190.4 | KG | 106.7 | ₹20,315.68 |
| 8 | Providing and laying damp-proof course 38mm ( Thrity millimetre) thick with cement concrete 1:2:4 ( one cement : two coarse sand : four graded stone aggregate 20mm ( twenty millimeter) nominal size including carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 17.1 | Per SQM | 1,490.9 | ₹25,494.39 |
| 9 | Random rubble mansory with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement: six coarse sand: twelve graded stone aggregate 20mm(twenty millimeter nominal size) upto plinth level with : cement mortar 1:6 (one cement :six coarse sand) complete upto floor all level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 15.12 | Per Cubic meter | 5,310.5 | ₹80,294.76 |
| 10 | Square rubble masonry coursed with hard stone of approved quality/quarry in foundation and plinth including racking out joints in cement mortar 1:5 (one cement : five sand) and curing complete including carriage of materials within all leads and lifts complete in all respect including curing complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 22.35 | Per Cubic meter | 8,500 | ₹1,89,975 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
SBD.pdf
Tender Documents • 4.69 MB
BOQ_213998.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .