Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.6 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹29.6 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹29.6 LAdmitted-Fee/PreQual/Technical/Finance AT PO SINDURPANK PS SADAR DIST SAMBALPUR PIN 768005 | SAMBALPUR | ODISHA | 768005 | +0.00% | ₹29.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹29.6 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹29.6 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.6 L
EMD Value
₹29,604
Closing Date
16 Jun 2026, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of paver block road at Satya sai Vihar Friends Coloney , Putibandha in ward no -37
2026_ORULB_130757_7
15/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹29,604
Yes
23 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of Engineer. | 98.28 | cum | 282.89 | ₹27,802.43 |
| 2 | Supplying ,Filling of sand in foundation and plinth base of road surface including cost of material with taxes , watering, ramming and labour required for the work ete.Complete as per direction of E-1-C. | 26.21 | cum | 867.94 | ₹22,748.71 |
| 3 | Cement Concrete (1:3:6) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 26.21 | cum | 6,007.39 | ₹1,57,453.69 |
| 4 | Cement Concrete (1:2:4) using 12mm size B.H.G. (C. B.) Chips including cost, conveyance , royalty & taxes of all materials etc. complete | 100.59 | cum | 7,664.83 | ₹7,71,005.25 |
| 5 | Rigid & smooth centering & shuttering for C.C.works including dismantling for reuse after casting etc. complete. | 982.8 | SQM | 250.37 | ₹2,46,063.64 |
| 6 | collecting, supplying, crusher dust stone screened dust passing through 2.36mm sieve and retained on 0.075mm sieve laying in sub base in layers not exceeding 100mm watering and compaction to the required density in OMC with PRR including cost,conveyance,royalty of subbase materials, hire and running charges of machineries, T&P and labour required for the work. complete measurement will be taken on compacted surface. | 223.86 | cum | 1,668 | ₹3,73,398.48 |
| 7 | Providing, and laying 80mm thick factory made cement concrete interlocking paver block of m-40 grade made by block making machine with strong vibratory compaction of approved size design and shape laid in requiered colour and patytern over and including 50 mm thick compacted bed of coarse sand filling the joint with fine sand etc all complete as per the direction of engineer incharge. | 2,238.6 | sqm | 608.4 | ₹13,61,964.24 |
stage.html
html • 0.04 MB
finance_594734.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_594734.xls
BOQ • 0.24 MB
15SMCCORRIGENDUM1.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .