| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC | ₹7.6 L | 1 | Accepted-AOC accepted |
| 2 | 2₹8.7 L+₹1.1 L (14.2%)Rejected-Finance | ₹8.7 L+₹1.1 L (14.2%) | 2 | Rejected-Finance Not accepted |
| Sl No | Description | Qty | Unit | S RAJA KUMAR L2 | PONNAYAN LAZAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete. (Narrow Foundation - First Depth upto 2 metre) | 47 | m³ | 250.33 ₹11,765.51 | 150 ₹7,050 Lowest |
| 2.00 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Mechanical Means | 4 | m³ | 5,221.59 ₹20,886.36 | 4,000 ₹16,000 Lowest |
| 3.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5mm and supported by Steel Adjustable Telescopic Props of Size 2.00m x 2.00m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) etc. complete in all floors complying with standard specification. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 141 | m² | 674.64 ₹95,124.24 | 500 ₹70,500 Lowest |
| 4.00 | Supplying, fabricating and placing in position Mild Steel/Ribbed T or Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe500, Fe550D, Fe500D etc for all RCC works as per design given including cost of steel reinforcement and GI binding wire, wastage etc complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 3,800 | Kg. | 88.23 ₹3,35,274 | 75 ₹2,85,000 Lowest |
| 5.00 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and half crushed stone sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 47.5 | m³ | 8,484.63 ₹4,03,019.93 | 8,000 ₹3,80,000 Lowest |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
30 Sept 2025, 3:00 pmClosed
Executive Officer
Thirparappu Town Panchayat
Construction of retaining wall at Chirakulam in Thirparappu Town Panchayat.
2025_DTP_604724_1
361/25/A1
Open Tender
Civil Works
Works
180 days
Thirparappu Town Panchayat
Vth class
2 documents required · 2 mandatory
₹0
₹11,000
Thirparappu Town Panchayat
7 Nov 2025
16 Sept 2025
30 Sept 2025
16 Sept 2025
30 Sept 2025
16 Sept 2025
16 Sept 2025 - 30 Sept 2025
24 Sept 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete. (Narrow Foundation - First Depth upto 2 metre)
Cement Concrete 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Mechanical Means
Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5mm and supported by Steel Adjustable Telescopic Props of Size 2.00m x 2.00m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) etc. complete in all floors complying with standard specification. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Supplying, fabricating and placing in position Mild Steel/Ribbed T or Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe500, Fe550D, Fe500D etc for all RCC works as per design given including cost of steel reinforcement and GI binding wire, wastage etc complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Reinforced Cement Concrete 1:1½:3 (One Cement, One and half crushed stone sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix
S RAJA KUMAR (BID ID -1476470)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .