Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.3 L+₹9,197.83 (2.16%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.4 L+₹13,819.85 (3.25%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹9,240
Closing Date
5 Oct 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Construction of Latrine bathroom near the Masjid Sharif Inderkote Sumbal Ward No.11.
2026_PWDJK_326574_1
NIT NO 65 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
45 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB DIVISION SUMBAL
₹9,240
13 Oct 2026
30 Sept 2026
6 Oct 2026
30 Sept 2026
5 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation in trenches including dressing of sides, ramming of bottom & disposal of excavated soil up to an avg. lead of 50 Mtrs & lift up to 1.5 Mtrs | 44.44 | Cum | 256.85 | ₹11,414.41 |
| 2 | P/L of dry stone soling ,Hand Packed i/c carriage of material for an average lead of 10 Kmts | 2.22 | Cum | 1,100 | ₹2,442 |
| 3 | Providing and Laying in position cement concrete in 1:3:6 Mix Excluding cost of centering and shuttering-All works up to plinth level. | 11.9 | Cum | 5,673.4 | ₹67,513.46 |
| 4 | Centering and shuttering i/c strutting , propping etc. & removal of form for :Retaining wall,returnwalls (any thickness ) buttresses , plinth & string courses etc | 21.71 | Sqm | 286.35 | ₹6,216.66 |
| 5 | Centering and shuttering i/c strutting , propping etc. & removal of form for : suspended floor | 12.13 | Sqm | 718.2 | ₹8,711.77 |
| 6 | Brick work with common burnt clay F.P.S ( non-modualar ) bricks in foundation and plinth in( 1 : 6 ) cement mortar | 4.56 | Cum | 9,027.2 | ₹41,164.03 |
| 7 | Brick work with common burnt clay F.P.S ( non-modualar ) bricks in foundation and plinth in( 1 : 6 ) cement mortar | 3.56 | cum | 7,571.55 | ₹26,954.72 |
| 8 | Providing and Laying in position Specific grade of reinforced cement concrete. Excluding cost of centering and shuttering-.(1 : 1.5 : 3 ) mix, using 20mm N/s agg. | 5.1 | Cum | 7,104.65 | ₹36,233.72 |
| 9 | Reinforcement for R.C.C work I/C cutting, Bending, Binding and placing in position | 3.57 | Qtl | 12,320 | ₹43,982.4 |
| 10 | 12 mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand ). | 62.48 | Sqm | 283.8 | ₹17,731.82 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1104713.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .