Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC BAWANI KHERA MAIN ROAD BAWANI KHERA BELOW MUNICIPAL COMMITTEE BAWANI KHERA 127032 | BAWANI KHERA | BHIWANI | HARYANA | 127032 | L1 | Accepted-AOC AOC | |
| 2 | L2₹4.5 L+₹18,074.48 (4.23%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹4.2 L
EMD Value
₹9,990
Closing Date
23 Apr 2026, 6:55 pmClosed
Pankaj Garg
Municipal Committee Bawani Khera
Construction of B/wall and Renovation of Park ward No. 04 At MC Bawani Khera
2026_HRY_515343_1
2026840D39C1 300B 4F37 8A05 A73430A21E15343ULB
Open Tender
Civil Works
Works
240 days
Bawani Khera
2 documents required · 2 mandatory
₹500
₹9,990
Yes
11 May 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 7.22.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
HSR Rate(Rs.) 4404.00 Through Rate | 1 | cum | - | - |
| 2 | HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1
cement: 4 fine sand)
HSR Rate(Rs.) 113.00 Through Rate | 0.4 | Sqm | - | - |
| 3 | HSR Item 10.8-Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4
HSR Rate(Rs.) 181.00 Through Rate | - | Sqm | - | - |
| 4 | HSR Item 11.93.1-Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm)
HSR Rate(Rs.) 39.00 Through Rate | 0.4 | Sqm | - | - |
| 5 | HSR Item 10.29.3-Providing and laying of chequered terrazzo tiles 20 to 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and
polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : 3. Dark shade pigment using ordinary cement
HSR Rate(Rs.) 730.00 Through Rate | 0.2 | Sqm | - | - |
| 6 | HSR Item 3.1.2-By Mechanical Transport including loading,
unloading and stacking 2. Earth
HSR Rate(Rs.) 83.00 5km | - | cum | - | - |
| 7 | HSR Item 13.29.2-Steel work welded in built up sections/
framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg | - | - |
| 8 | HSR Item 11.82.1-Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work
HSR Rate(Rs.) 49.00 Through Rate | - | Sqm | - | - |
| 9 | HSR Item 26.353-Providing and stacking of Bottle palm of ht. 120-150 cm bottom girth 15-20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge.
HSR Rate(Rs.) 208.00 Through Rate | - | Each | - | - |
| 10 | HSR Item 26.446-Providing and stacking of Cestrum
nocturnum (Raat ki Rani) of height 60-75 cm. with 4-5
branches in bag of size 25 cm as per direction of the officerin-charge.
HSR Rate(Rs.) 46.00 Through Rate | - | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_594185.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .