| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.7 LAccepted-AOC | ₹66.7 L | L1 | Accepted-AOC l1 |
| 2 | L2₹68.1 LRejected-Finance SF NO 348 5 TIRUPUR TO UDUMALAI ROAD GUDIMANGALAM | TIRUPPUR | TAMIL NADU | 638051 | ₹68.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Karthik L2 | VEL PANDIAN L1 |
|---|---|---|---|---|---|
| 1.00STRENGTHENING TO THE SALIYAN OODAI -KATTUPURAM ROAD IN KM 0/000-1/400 (R-59) IN KATTUPURAM VILLAGE AND NELKATTUMSEVAL PANCHAYAT IN VASUDEVANALLUR PANCHAYAT UNION.(VPR) | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 862.92 | Sqm | 8 ₹6,903.36 | 6 ₹5,177.52 Lowest |
| 3.00 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 1,505.62 | Sqm | 22 ₹33,123.64 | 20 ₹30,112.4 Lowest |
| 4.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 323.59 | Cum | 150 ₹48,538.5 | 140 ₹45,302.6 Lowest |
| 5.00Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | |||||
| 6.00 | 0/0-1/0 | 134.8 | Cum | 450.5 ₹60,727.4 | 430 ₹57,964 Lowest |
| 7.00 | 1/0-1/2 | 27 | Cum | 450.5 ₹12,163.5 | 440 ₹11,880 Lowest |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | KM-0/0-1/2 | 564.45 | Cum | 2,900 ₹16,36,905 | 2,740 ₹15,46,593 Lowest |
| 10.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,515.62 | Sqm | 87.5 ₹3,95,116.75 | 86 ₹3,88,343.32 Lowest |
Tender Value
₹72.0 L
EMD Value
₹73,000
Closing Date
23 Feb 2026, 3:00 pmClosed
The Project Director
DRDA,Tenkasi
Strengthening of Saliyan Odai - Kattupuam Road km 0/000-1/400 in Vasudevanallur Panchayat Union NABARD RIDF 2026-27
2026_RDTN_657494_1
DIPR/988/Tender/2026 NABARD RIDF TSI
Open Tender
Civil Works
Works
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹73,000
DRDA,Tenkasi
5 Aug 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | STRENGTHENING TO THE SALIYAN OODAI -KATTUPURAM ROAD IN KM 0/000-1/400 (R-59) IN KATTUPURAM VILLAGE AND NELKATTUMSEVAL PANCHAYAT IN VASUDEVANALLUR PANCHAYAT UNION.(VPR) | - | - | - | - |
| 2 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 862.92 | Sqm | 6.36 | ₹5,488.17 |
| 3 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 1,505.62 | Sqm | 23.36 | ₹35,171.28 |
| 4 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 323.59 | Cum | 140.45 | ₹45,448.22 |
| 5 | Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | - | - | - | - |
| 6 | 0/0-1/0 | 134.8 | Cum | 436.87 | ₹58,890.08 |
| 7 | 1/0-1/2 | 27 | Cum | 450.55 | ₹12,164.85 |
| 8 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 9 | KM-0/0-1/2 | 564.45 | Cum | 2,825.5 | ₹15,94,853.48 |
| 10 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,515.62 | Sqm | 87.02 | ₹3,92,949.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Technical.pdf
Tender Documents • 1.13 MB
Pricebid.pdf
Additional Documents • 0.77 MB
BOQ_788617.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].