Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LQualified F16 2ND CROSS MAIN ROAD 2ND MAIN ROAD AMBATTUR INDUSTRIAL ESTATE TIRUVALLUR TAMIL NADU 600058 | CHENNAI | TAMIL NADU | 600058 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹2.6 L+₹2,580 (1.00%)Qualified | L2 | Qualified | |
| 3 | L3₹9.2 L+₹6.6 L (256.4%)Qualified 4 19 VARADHARAJAPURAM INDIRA STREET NAZARATHPET VILLAGE TOWN VARADHARAJAPURAM CITY POONAMALLEE THIRUVALLUR TAMIL NADU 600123 INDIA | THIRUVALLUR | TAMIL NADU | 600123 | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
2 Aug 2024, 11:00 amClosed
ECT calibration standard for Bleed Cooler tubes
6581314
GEM/2024/B/5106684
Two Packet Bid
ECT calibration standard for Bleed Cooler tubes a,ECT Calibration standard for Moderator heat excha
90 days
Uttar Pradesh; Bulandshahr
Total value wise evaluation
BOQ
Exempted
23 Sept 2024
11 Jul 2024
2 Aug 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | ECT calibration standard for Bleed Cooler tubes a | ECT calibration standard for Bleed Cooler tubes as per attached Annexure-I. | 2 | NOS | Ishan ECT Calibration Standard 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 For Moderator Heat Exchanger | 90 |
| 2 | ECT Calibration standard for Moderator heat exchanger tubes b | ECT Calibration standard for Moderator heat exchanger tubes as per attached Annexure-I. | 2 | NOS | Ishan ECT Calibration Standard 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 For Calandria Vault Cooling | 90 |
| 3 | ECT Calibration standard for calandria vault cooling heat exchanger tubes c | ECT Calibration standard for calandria vault cooling heat exchanger tubes as per attached Annexure-I. | 2 | NOS | Ishan ECT Calibration Standard 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 For FM Return Cooler Tubes | 90 |
| 4 | ECT Calibration standard for F M return cooler tubes d | ECT Calibration standard for F/M return cooler tubes as per attached Annexure-I. | 2 | NOS | Ishan ECT Calibration Standard 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 For Steam Generator Tubes | 90 |
| 5 | ECT Calibration standard for steam generator tubes e | ECT Calibration standard for steam generator tubes as per attached Annexure-I. | 2 | NOS | Ishan ECT Calibration Standard 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 For Steam Generator Tubes | 90 |
| 6 | ECT Calibration standard for steam generator tubes f | ECT Calibration standard for steam generator tubes as per attached Annexure-I. | 2 | NOS | Ishan 202389,Manager(Materials),- C&MM, Narora Atomic Power Station, Distt.-Bulandshahar (UP),PIN–203389 | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6581314.pdf
GEM_BID
27328_2024-06-29-11-28-42_361d6c35041c1ca53fea9e1b7e72814d.pdf
BOQ
27328_2024-06-29-11-28-42_8cd5172084bf426015f925c2ed9a1ca1.csv
BOQ
compose.php.pdf
OTHER
AnnexureF_97e4e50d-d5c8-4fad-85ac1719641802222_BUYER7.NAPS.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .