Tender Value
₹41.2 L
EMD Value
₹51,600
Closing Date
16 Dec 2023, 11:00 amClosed
GENERAL MANAGER (EXCV)
GM(Excv) Nigahi Area NCL, PO Nigahi Dist Singrauli, MP-486884
Offloading the works of maintenance support of 03 nos. Hydraulic Excavator (02 nos. Komatsu PC-2000 and 01 no. Tata Hitachi EX-1900 Hydraulic Excavators) of Nigahi Project for a period 01 year.
2023_NCL_294901_1
NGH/EXCV/TENDERS/23-24/066
Open Tender
Excavation Department Work
Item Rate
365 days
Nigahi Project
As per NIT
4 documents required · 4 mandatory
₹51,600
3 Oct 2024
1 Dec 2023
18 Dec 2023
1 Dec 2023
16 Dec 2023
2 Dec 2023
1 Dec 2023 - 5 Dec 2023
Amount
Scope of Work: 1. Daily maintenance: Daily maintenance would include inspection of different assemblies/subassemblies, parts/subparts of machine as per checklist mentioned in NIT and their rectification as per need. 2. Periodic maintenance: Periodic maintenance would be performed as per following - EVERY 250 HOURS MAINTENACE-Check oil level in final drive case ,add oil.Check level of battery electrolyte,Check and tighten track frame and axel connecting bolts,Check alternator drive belt tension, adjust.Check Air Conditioner compressor belt tension adjust. EVERY 500 HOURS MAINTENACE- Change oil in engine oil pan, replaced engine oil filter cartridge.Clean and inspect radiator fins , oil cooler fins fuel cooler fins,Clean air conditioner fresh / raciro filter,Replace swing travel motor drain filter,Replace pilot filter cartridge, Check oil level in swing machinery case add oil,Replace fuel pre-filter cartridge EVERY 1000 HOURS MAINTENACE- Replace fuel main filter cartridge,Replace fuel tank breather element,Change oil in swing machinery case, Change oil in PTO case, Clean PTO lubrication oil filter strainer, Replace hydraulic oil filter element,Replace hydraulic tank breather filter element, Inspection of engine suction hose clamp for operation control circuit, Check welded structure Check emergency ladder, Replace swing motor cooling filter element.EVERY 2000 HOURS MAINTENANCE - Check oil in final drive case, Check grease level in swing pinion Add grease, Check Alternator Starting motor, Check Engine valve clearance, Adjust. Every 4000 Hours Maintenance- Grease Engine mount (Front side), Check water pump, Check for looseness of high-pressure piping clamp ,hardening of rubber, Check for missing fuel spray prevention CAP , Hardening of rubber , Replace Accumulator in oil cooler circuit, Every 5000 Hours Maintenance, Change oil in Hydraulic tank, clean strainer 3. Unscheduled / Breakdown maintenance/ Running breakdown maintenance – Corrective maintenance or breakdown maintenance would include rectification of all type of breakdowns occurring in machine. 4. Major works: Demounting and Mounting of all major assemblies/Sub-assemblies/ Parts, i.e. Engine, PTO, all hydraulic pumps, all hydraulic motors, all hydraulic cylinders, arm assembly, boom assembly etc. 5. Cleaning: Cleaning of Hydraulic shovels and up keeping. 6. Supervision of the job during all times has to be ensured by the contractor. 7. AFDSS and other safety features- Firm has to submit status of AFDSS and other safety features fortnightly. 8.VHMS report has to be downloaded by their ET Tool and has to be submitted weekly. 9. All other jobs also mentioned in scope of work in NIT
Cost/ charges for the works of maintenance support of 03 nos. Hydraulic Excavator (02 nos. Komatsu PC-2000 and 01 no. Tata Hitachi EX-1900 Hydraulic Excavators) as per scope of work mentioned above and also in NIT including labour charges and any other misc. charges for 365 days. (workmen team/crew consisting of minimum 02 No. Highly skilled Fitter cum supervisor , 04 Nos. Skilled Fitter and 06 Nos. Semi-skilled Fitter manpower to be deployed per day for 03 nos. Hydraulic Excavators Fleet)
Contractor Profit on labour charges per day for 03 Nos. Hydrualic Shovel for job mentioned at Sl. No. 3.00
Hire charges for tools and takles ( hand tools, torque wrench, material handling tools etc) per day for 03 Nos. Hydraulic Shovel.days
Total impact of GST for the purpose of CTC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .