Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹6.4 Cr |
Tender Value
₹7.9 Cr
EMD Value
₹15.8 L
Closing Date
16 Mar 2026, 4:00 pmClosed
SANJAY KUMAR (EXECUTIVE ENGINEER)
EXECUTIVE ENGINEER
PHED OFFICE, JEHANABAD ROAD, ARWAL
DAYASHANKAR PRASAD
CHIEF ENGINEER (DESIGN)
Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25 with three months trial run period
126708
NIT NO-09/PHED/JNBD/LOT/PRD/2024-25 GROUP-(R2) 6
Open Tender
CIVIL
Jehanabad
• Bid Validity
• Bid Security
• Legal Status of Bidder.
• Place of Registration.
• Principal place of Business
• Power of attorney of signatory Bid
• Total value of civil engineering construction work performed in last five years.
1. 2019-20 : Escalation Factor= 1.47
2. 2020-21 : Escalation Factor= 1.36
3. 2021-22 : Escalation Factor= 1.26
4. 2022-23 : Escalation Factor= 1.17
5. 2023-24 : Escalation Factor= 1.08
• Work Experience of Similar nature
• Minimum Quantities of work done of similar nature during last five years.
• Bidding Capacity:
• Existing commitments and ongoing works
• Work for which Bid already submitted
• Availability of key items of Contractor's Equipment
• .Evidence of accesses to Financial Resources
• Key Personnel
• Evidence of accesses to Financial Resources
• Proposed methodology and programme of construction.
• Litigation History
• Affidavit
• Undertaking
• PAN No.
• GST No.
• Character Certificate
• Time of Completion
CIVIL
ITEM RATE
L1
1
24 documents required · 24 mandatory
₹10,000
Processing Fee: 5900
₹15.8 L
OFFICE OF EXECUTIVE ENGINEER , PUBLIC HEALTH DIVISION, JEHANABAD
10 Jul 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
6 Mar 2026
TENDER NIT No.- 09/PHED/JNBD/LOT/PRD/2024-25 (R2)
Financial Bid Sheet, Group-06 (LoT/PRD)
NAME OF THE WORK: Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Date of Tender :-
Estimated Cost:-
Earnest Money :- 1575500
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As per eproc2 (to be paid online)
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No. Particulars Rate in Rs. Qty. Unit Amount in Rs
ITEM WISE COST BREAKUP FOR
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. 40 Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. 4 Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. 44 Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I.
HDPE PIPE AND FITTING
90mm PE 100-PN10 6121.5 PM
75mm PE 100-PN10 8162 PM
63mm PE 100-PN10 12243 PM
50mm PE 100-PN8 14294 PM
40mm PE 100-PN8 0 PM
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 30 Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 14 Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. 2828 Each
6 Providing and erecting 8M high Steel Structure staging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. 30 Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. 14 Each
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 44 Each
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 P/KM
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 Each
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 3 HP] 30 Each
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 2 HP] 14 Each
13 For 2 PPM & 30% Chlorine solution 0.599 P/Ltr.
Bidders are required make the entries in the coloured cells only.
S.N. Particulars BLOCK- BHABHUA Total
SECTION – A : EXECUTION PART
1A Construction of 150mm dia & 90 M Gravel packed T/W etc. all complete and as per direction of E/I. 1
1B Estimate of Construction of 200/165mm dia 125Mtr Deep Drilled High Yield Tube Well by DTH Rig Machine. 0
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1
3A Supplying and installation, commissioning and testing of 3 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2.5 to 3.35 lps 1
3B Solar photovoltaic water pumping system consising of 02 H.P. Submersible pump 0
4 Supplying all materials and Laying of distribution network
HDPE PIPE AND FITTING
90mm PE 100-PN10 210 Total Pipe 0.5
75mm PE 100-PN10 449
63mm PE 100-PN10 373
50mm PE 100-PN8 374
40mm PE 100-PN8 445
5 Providing and placing on terrace (at all floor levels)/8 M staging polyethylene water storage tank, (10000 liter capacity =2x5000 liter each) 2
6 Providing house connection for each house hold. 103 Total HH 0.5
7A Providing and erecting 8M high staging. 1
7B Construction of 2.10x2.40mx2.40 m high of Attendanent Cum Chlorinator room. 0
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 0;[Re31]0
9 Surveying and levelling using Total Station/DGPS. 0.000;[Re31]0.000 0.999;[Re31]0.999 0.999;[Re1]0.999 0.000;[Re1]0.000 0.999;[Re31]0.999 0.999;[Re31]0.999 0.000;[Re31]0.000 0.000;[Re31]0.000
SECTION – B : OPERATION AND MAINTENANCE PART
10 Comprehensive Operation & Maintenance. 0;[Re31]0
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
ABSTRACT OF ESTIMATES
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Block- Ratni Faridpur, P.H Sub Division Sakurabad
S.N. Description Qty. Unit Rate Amount
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1A) No. Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1B) No. Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. (As per sub Estimate no.- 2) No. Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I. (As per sub Estimate no.- 3) 1 Job Each
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set.(As per sub Estimate no.- 4A) No. Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. (As per sub Estimate no.- 4B) No. Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. (As per sub Estimate no.- 5) Nos. Each 2600
6 Providing and erecting 8M high Steel Structure taging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. (As per sub Estimate no.- 6) OR Construction of RCC Staging 4.0M X 3.0M X 8.0M High with cast in situ pile and with ladder for 10,000 Ltr PVC tank as per approved drawing No. Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. (As per Sub Estimate-6A No. Each OR OR
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) No. Each 23515
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 Km P/Km 5000
Add difference of GST (18%-12%) i.e 0.0536
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 No. Each 200
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 3hp) (AS per sub Est.No:-8) 30 No Each 4860
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 2hp) (AS per sub Est.No:-8) 14 No Each 3290
13 For 2 PPM & 30% Chlorine soluditon No per ltr. 150
Junior Engineer Assistant Engineer Executive Engineer
P.H. Division, Jehanabad
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
GENERAL ABSTRACT OF Quantity of Works
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dis
S.N. Location for HGNJ Scheme Boring 90 M GPT Boring 90 M DT Motor 2HP Motor 3HP HH Connection MS Staging 8M Switch Room Chlorinator 90 mm HDPE Pipe 75 mm HDPE Pipe 63 mm HDPE Pipe 50 mm HDPE Pipe Total Remark
G-P WARD HABITATION
1 Sohriya 3B Sohriya 1 973
2 7B Malhachak 1 954
3 12B Panditpur 1 1061
4 8B Bhwan bigha 1 1143
5 6B Bubliya bigha 1 806
6 6C Malichak 1 1007
7 6D Meghobigha 1 1043
8 13B Dharmshil bigha 1 1032
9 Sikandarpur 1B Purvi Tola 0 959
10 9B Bramha Bigha 1 811
11 10B Gulab Ganj 1 877
12 11B Sawan Bigha 1 883
13 7B Mathiya Par 0 660
14 2B Das Tola 1 807
15 Kansua 9B Rasiya Bigha 1 686
16 8B Mahadalit Tola 1 654
17 4B Koirigoriya 1 739
18 7B Ramse Bigha 1 806
19 12B Jharkha 1 705
20 Pandual 11B Bandhu Bigha 0 807
21 Nehalpur 9B Gaushiya Par 1 995
22 12B Mustichak 1 895
23 Sesmba 9B Ravidas Tola 1 966
24 Ratani 3B Phauladpur 1 978
25 Narayanpur 8B Baudd Bigha 1 906
26 Jhunathi 7B Yadu Bigha 1 926
27 12B Ravidas Tola 1 964
28 5B Kothiya Par 1 943
29 3B Nanhaganj 1 958
30 3C Mathiya Par 1 952
31 3D Jivan Bigha 1 996
32 4B Pachasi 1 982
33 7C Bhuwan Bigha 1 877
34 7D Chunni Bigha 1 793
35 7E Karni Bigha 1 1238
36 Jhunathi 7F Mandal Nagar 1 913
37 Murhara 9B Banke Bigha 1 928
38 8B Dhukhi Bigha 1 987
39 10B Manjhi Tola 1 1052
40 3B Murgia Chak 1 1263
41 3C Chiryatar 1 1271
42 Kasma 12B Kazichak 0 810
43 Nowama 10B Sesarpur 1 761
44 9B Tulsi Bigha 1 923
Estimated Cost in Rs. Including Contingency (As per Attached Abstract Estimate)
Executive Engineer
P.H. Division,Jehanabad
TENDER NIT No – 09/PHED/JNBD/LOT/PRD/2024-25 (R2)
TECHNICAL BID SHEET OF GROUP- 06 (LoT/PRD)
Name of Work Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25 with three months trial run period. Cost of Work as per BOQ(Rs in Lakhs) 787.545 Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount 789.26 As per Technical Approval Date of Tender
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page-27-28 Bid validity periods In days
2 Bid Security Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, P.H. Division, Jehanabaf. 16.1 Page-28 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) 15.755 Bid Security Amount - Rs. 0.00
3 (i) Legal Status of Bidder. 4.3(a) Page-17
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-17
4 Total value of civil engineering construction work performed in last five years. attached shall have valid Unique Document Identification Number (UDIN Achieved in any one year a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) estimated cost of works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover). 393.77 4.5A (a) Page-22
2019-20 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47 0.00000
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36 0.00000
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26 0.00000
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17 0.00000
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08 0.00000 0.00000
5 Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved execution of all main items of work described in the bid document, provided further that all other qualification criterion are satisfied) at least one similar work of value not less than the amount indicated in the appendix (Not less than 10% (Ten percent) estimated value of contract. 78.75 4.5A (b) Page -22 Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done of similar nature during last five years. Executed the minimum quantities of the following item of work as indicated in the appendix:
Items Unit Quantity 4.5A(c) Page-22
High Yielding Tube well Nos. 9 Value to be entered in unit Nos
Pump/ Motor Nos. 9 Value to be entered in unit Nos
Distribution Main meter 8164 Value to be entered in unit Meter
House Connection Nos. 566 Value to be entered in unit Nos
RCC/Steel Staging Nos. 6 Value to be entered in unit Nos
7 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months 787.55 4.7 Page-23 Amount To be entered (Rs in Lakhs)
8 (a) Existing commitments and ongoing works Page - 40 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 40 Amount To be entered (Rs in Lakhs)
9 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (b) Page-37 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 10
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
10 Key Personnel 2-10 Crores 4.5(B) (b) Page-37 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 6
Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
11 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 78.75 Page 18 4.3 (g) Amount To be entered (Rs in Lakhs)
12 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 18 4.3 (l)
13 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 18 4.3 (j)
14 Affidavit Regarding statements made in the required attachments are true and correct. Page 26 12.1 (iv)
15 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 196.89 Page 18 4.3 (h)
18 Character Certificate
19 Time of Completion 6 Months To be entered in months
Executive Engineer,
P.H. Division, Jehanabad.
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
TENDER NIT No – 09/PHED/JNBD/LOT/PRD/2024-25 (R2)
TECHNICAL BID SHEET OF GROUP- 06 (LoT/PRD)
Name of Work Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25 with three months trial run period. Cost of Work as per BOQ(Rs in Lakhs) 787.545 Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount 789.26 As per Technical Approval Date of Tender
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page-27-28 Bid validity periods In days
2 Bid Security Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, P.H. Division, Jehanabaf. 16.1 Page-28 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) 15.755 Bid Security Amount - Rs. 0.00
3 (i) Legal Status of Bidder. 4.3(a) Page-17
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-17
4 Total value of civil engineering construction work performed in last five years. attached shall have valid Unique Document Identification Number (UDIN Achieved in any one year a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) estimated cost of works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover). 393.77 4.5A (a) Page-22
2019-20 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47 0.00000
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36 0.00000
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26 0.00000
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17 0.00000
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08 0.00000 0.00000
5 Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved execution of all main items of work described in the bid document, provided further that all other qualification criterion are satisfied) at least one similar work of value not less than the amount indicated in the appendix (Not less than 10% (Ten percent) estimated value of contract. 78.75 4.5A (b) Page -22 Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done of similar nature during last five years. Executed the minimum quantities of the following item of work as indicated in the appendix:
Items Unit Quantity 4.5A(c) Page-22
High Yielding Tube well Nos. 9 Value to be entered in unit Nos
Pump/ Motor Nos. 9 Value to be entered in unit Nos
Distribution Main meter 8164 Value to be entered in unit Meter
House Connection Nos. 566 Value to be entered in unit Nos
RCC/Steel Staging Nos. 6 Value to be entered in unit Nos
7 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months 787.55 4.7 Page-23 Amount To be entered (Rs in Lakhs)
8 (a) Existing commitments and ongoing works Page - 40 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 40 Amount To be entered (Rs in Lakhs)
9 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (b) Page-37 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 10
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
10 Key Personnel 2-10 Crores 4.5(B) (b) Page-37 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 6
Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
11 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 78.75 Page 18 4.3 (g) Amount To be entered (Rs in Lakhs)
12 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 18 4.3 (l)
13 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 18 4.3 (j)
14 Affidavit Regarding statements made in the required attachments are true and correct. Page 26 12.1 (iv)
15 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 196.89 Page 18 4.3 (h)
18 Character Certificate
19 Time of Completion 6 Months To be entered in months
Executive Engineer,
P.H. Division, Jehanabad.
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
TENDER NIT No.- 09/PHED/JNBD/LOT/PRD/2024-25 (R2)
Financial Bid Sheet, Group-06 (LoT/PRD)
NAME OF THE WORK: Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Date of Tender :-
Estimated Cost:-
Earnest Money :- 1575500
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As per eproc2 (to be paid online)
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No. Particulars Rate in Rs. Qty. Unit Amount in Rs
ITEM WISE COST BREAKUP FOR
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. 40 Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. 4 Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. 44 Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I.
HDPE PIPE AND FITTING
90mm PE 100-PN10 6121.5 PM
75mm PE 100-PN10 8162 PM
63mm PE 100-PN10 12243 PM
50mm PE 100-PN8 14294 PM
40mm PE 100-PN8 0 PM
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 30 Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 14 Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. 2828 Each
6 Providing and erecting 8M high Steel Structure staging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. 30 Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. 14 Each
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 44 Each
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 P/KM
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 Each
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 3 HP] 30 Each
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 2 HP] 14 Each
13 For 2 PPM & 30% Chlorine solution 0.599 P/Ltr.
Bidders are required make the entries in the coloured cells only.
S.N. Particulars BLOCK- BHABHUA Total
SECTION – A : EXECUTION PART
1A Construction of 150mm dia & 90 M Gravel packed T/W etc. all complete and as per direction of E/I. 1
1B Estimate of Construction of 200/165mm dia 125Mtr Deep Drilled High Yield Tube Well by DTH Rig Machine. 0
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1
3A Supplying and installation, commissioning and testing of 3 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2.5 to 3.35 lps 1
3B Solar photovoltaic water pumping system consising of 02 H.P. Submersible pump 0
4 Supplying all materials and Laying of distribution network
HDPE PIPE AND FITTING
90mm PE 100-PN10 210 Total Pipe 0.5
75mm PE 100-PN10 449
63mm PE 100-PN10 373
50mm PE 100-PN8 374
40mm PE 100-PN8 445
5 Providing and placing on terrace (at all floor levels)/8 M staging polyethylene water storage tank, (10000 liter capacity =2x5000 liter each) 2
6 Providing house connection for each house hold. 103 Total HH 0.5
7A Providing and erecting 8M high staging. 1
7B Construction of 2.10x2.40mx2.40 m high of Attendanent Cum Chlorinator room. 0
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 0;[Re31]0
9 Surveying and levelling using Total Station/DGPS. 0.000;[Re31]0.000 0.999;[Re31]0.999 0.999;[Re1]0.999 0.000;[Re1]0.000 0.999;[Re31]0.999 0.999;[Re31]0.999 0.000;[Re31]0.000 0.000;[Re31]0.000
SECTION – B : OPERATION AND MAINTENANCE PART
10 Comprehensive Operation & Maintenance. 0;[Re31]0
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
ABSTRACT OF ESTIMATES
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Block- Ratni Faridpur, P.H Sub Division Sakurabad
S.N. Description Qty. Unit Rate Amount
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1A) No. Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1B) No. Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. (As per sub Estimate no.- 2) No. Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I. (As per sub Estimate no.- 3) 1 Job Each
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set.(As per sub Estimate no.- 4A) No. Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. (As per sub Estimate no.- 4B) No. Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. (As per sub Estimate no.- 5) Nos. Each 2600
6 Providing and erecting 8M high Steel Structure taging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. (As per sub Estimate no.- 6) OR Construction of RCC Staging 4.0M X 3.0M X 8.0M High with cast in situ pile and with ladder for 10,000 Ltr PVC tank as per approved drawing No. Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. (As per Sub Estimate-6A No. Each OR OR
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) No. Each 23515
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 Km P/Km 5000
Add difference of GST (18%-12%) i.e 0.0536
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 No. Each 200
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 3hp) (AS per sub Est.No:-8) 30 No Each 4860
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 2hp) (AS per sub Est.No:-8) 14 No Each 3290
13 For 2 PPM & 30% Chlorine soluditon No per ltr. 150
Junior Engineer Assistant Engineer Executive Engineer
P.H. Division, Jehanabad
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
GENERAL ABSTRACT OF Quantity of Works
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dis
S.N. Location for HGNJ Scheme Boring 90 M GPT Boring 90 M DT Motor 2HP Motor 3HP HH Connection MS Staging 8M Switch Room Chlorinator 90 mm HDPE Pipe 75 mm HDPE Pipe 63 mm HDPE Pipe 50 mm HDPE Pipe Total Remark
G-P WARD HABITATION
1 Sohriya 3B Sohriya 1 973
2 7B Malhachak 1 954
3 12B Panditpur 1 1061
4 8B Bhwan bigha 1 1143
5 6B Bubliya bigha 1 806
6 6C Malichak 1 1007
7 6D Meghobigha 1 1043
8 13B Dharmshil bigha 1 1032
9 Sikandarpur 1B Purvi Tola 0 959
10 9B Bramha Bigha 1 811
11 10B Gulab Ganj 1 877
12 11B Sawan Bigha 1 883
13 7B Mathiya Par 0 660
14 2B Das Tola 1 807
15 Kansua 9B Rasiya Bigha 1 686
16 8B Mahadalit Tola 1 654
17 4B Koirigoriya 1 739
18 7B Ramse Bigha 1 806
19 12B Jharkha 1 705
20 Pandual 11B Bandhu Bigha 0 807
21 Nehalpur 9B Gaushiya Par 1 995
22 12B Mustichak 1 895
23 Sesmba 9B Ravidas Tola 1 966
24 Ratani 3B Phauladpur 1 978
25 Narayanpur 8B Baudd Bigha 1 906
26 Jhunathi 7B Yadu Bigha 1 926
27 12B Ravidas Tola 1 964
28 5B Kothiya Par 1 943
29 3B Nanhaganj 1 958
30 3C Mathiya Par 1 952
31 3D Jivan Bigha 1 996
32 4B Pachasi 1 982
33 7C Bhuwan Bigha 1 877
34 7D Chunni Bigha 1 793
35 7E Karni Bigha 1 1238
36 Jhunathi 7F Mandal Nagar 1 913
37 Murhara 9B Banke Bigha 1 928
38 8B Dhukhi Bigha 1 987
39 10B Manjhi Tola 1 1052
40 3B Murgia Chak 1 1263
41 3C Chiryatar 1 1271
42 Kasma 12B Kazichak 0 810
43 Nowama 10B Sesarpur 1 761
44 9B Tulsi Bigha 1 923
Estimated Cost in Rs. Including Contingency (As per Attached Abstract Estimate)
Executive Engineer
P.H. Division,Jehanabad
TENDER NIT No.- 09/PHED/JNBD/LOT/PRD/2024-25 (R2)
Financial Bid Sheet, Group-06 (LoT/PRD)
NAME OF THE WORK: Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:- Ratni Faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Date of Tender :-
Estimated Cost:-
Earnest Money :- 1575500
Time of Completion :- 6 MONTHS
Cost of BSEDC Bid processing fee:- As per eproc2 (to be paid online)
Cost of BOQ :- Rs 10,000.00 (to be paid online)
Name and Address of the Bidder
Sl. No. Particulars Rate in Rs. Qty. Unit Amount in Rs
ITEM WISE COST BREAKUP FOR
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. 40 Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. 4 Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. 44 Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I.
HDPE PIPE AND FITTING
90mm PE 100-PN10 6121.5 PM
75mm PE 100-PN10 8162 PM
63mm PE 100-PN10 12243 PM
50mm PE 100-PN8 14294 PM
40mm PE 100-PN8 0 PM
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 30 Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. 14 Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. 2828 Each
6 Providing and erecting 8M high Steel Structure staging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. 30 Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. 14 Each
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 44 Each
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 P/KM
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 Each
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 3 HP] 30 Each
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit [FOR 2 HP] 14 Each
13 For 2 PPM & 30% Chlorine solution 0.599 P/Ltr.
Bidders are required make the entries in the coloured cells only.
S.N. Particulars BLOCK- BHABHUA Total
SECTION – A : EXECUTION PART
1A Construction of 150mm dia & 90 M Gravel packed T/W etc. all complete and as per direction of E/I. 1
1B Estimate of Construction of 200/165mm dia 125Mtr Deep Drilled High Yield Tube Well by DTH Rig Machine. 0
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1
3A Supplying and installation, commissioning and testing of 3 HP Single phase Submersible pump and motor of KSB/Kirloskar or or equivalent make having discharge of 2.5 to 3.35 lps 1
3B Solar photovoltaic water pumping system consising of 02 H.P. Submersible pump 0
4 Supplying all materials and Laying of distribution network
HDPE PIPE AND FITTING
90mm PE 100-PN10 210 Total Pipe 0.5
75mm PE 100-PN10 449
63mm PE 100-PN10 373
50mm PE 100-PN8 374
40mm PE 100-PN8 445
5 Providing and placing on terrace (at all floor levels)/8 M staging polyethylene water storage tank, (10000 liter capacity =2x5000 liter each) 2
6 Providing house connection for each house hold. 103 Total HH 0.5
7A Providing and erecting 8M high staging. 1
7B Construction of 2.10x2.40mx2.40 m high of Attendanent Cum Chlorinator room. 0
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) 0;[Re31]0
9 Surveying and levelling using Total Station/DGPS. 0.000;[Re31]0.000 0.999;[Re31]0.999 0.999;[Re1]0.999 0.000;[Re1]0.000 0.999;[Re31]0.999 0.999;[Re31]0.999 0.000;[Re31]0.000 0.000;[Re31]0.000
SECTION – B : OPERATION AND MAINTENANCE PART
10 Comprehensive Operation & Maintenance. 0;[Re31]0
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
ABSTRACT OF ESTIMATES
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dist-Jahanabad Under P.H Division-Jahanabad for Year 2024-25.
Block- Ratni Faridpur, P.H Sub Division Sakurabad
S.N. Description Qty. Unit Rate Amount
1A Construction of 150mm x 90 m deep Gravel packed T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1A) No. Each
1B Construction of 150mm x 90 m deep Drilled T/W etc. all complete and as per direction of E/I. (As per sub Estimate no.- 1B) No. Each
2 Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I. (As per sub Estimate no.- 2) No. Each
3 Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) etc all complete as per direction of E/I. (As per sub Estimate no.- 3) 1 Job Each
4A Cost of Submersible Pump Set of KSB make having discharging 3.35 LPS at a total head of 45 M with suitable size of MSERW column pipe coupled with 3 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set.(As per sub Estimate no.- 4A) No. Each
4B Cost of Submersible Pump Set of KSB make having discharging 2.0 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set. (As per sub Estimate no.- 4B) No. Each
5 Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm G.I Pipes with all fittings etc all complete. (As per sub Estimate no.- 5) Nos. Each 2600
6 Providing and erecting 8M high Steel Structure taging for 10000 litre PVC tank with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per approved drawing. (As per sub Estimate no.- 6) OR Construction of RCC Staging 4.0M X 3.0M X 8.0M High with cast in situ pile and with ladder for 10,000 Ltr PVC tank as per approved drawing No. Each
7 Construction of 2.10x2.40mx2.4 m high of Switch room. (As per Sub Estimate-6A No. Each OR OR
8 Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) No. Each 23515
9 Surveying and levelling using Total Station/DGPS or auto level instruments of the project area including transfer of relevant bench mark to establish the levels of strategic points at the selected position of the T/Well, pumping station & attach the surveying data sheet with design & drawing of distribution system by Loop/Water get or any other software etc., map of location of HYDT & Steel structure etc. all complete work. 40.82 Km P/Km 5000
Add difference of GST (18%-12%) i.e 0.0536
10 Cost of applaying fot taking electricity conection including instalaton of electric miter on the scheme 44 No. Each 200
11 Cost of electricity charge for a period of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 3hp) (AS per sub Est.No:-8) 30 No Each 4860
12 Cost of electricity charge for a perod of 3 month (TRC) As per sub Estimate no:[email protected]@unit(FOR 2hp) (AS per sub Est.No:-8) 14 No Each 3290
13 For 2 PPM & 30% Chlorine soluditon No per ltr. 150
Junior Engineer Assistant Engineer Executive Engineer
P.H. Division, Jehanabad
GOVERNMENT OF BIHAR
Public Health Engineering Department
P.H. Division, Jahanabad
GENERAL ABSTRACT OF Quantity of Works
Name Of Work:- Design, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Ratni faridpur in Dis
S.N. Location for HGNJ Scheme Boring 90 M GPT Boring 90 M DT Motor 2HP Motor 3HP HH Connection MS Staging 8M Switch Room Chlorinator 90 mm HDPE Pipe 75 mm HDPE Pipe 63 mm HDPE Pipe 50 mm HDPE Pipe Total Remark
G-P WARD HABITATION
1 Sohriya 3B Sohriya 1 973
2 7B Malhachak 1 954
3 12B Panditpur 1 1061
4 8B Bhwan bigha 1 1143
5 6B Bubliya bigha 1 806
6 6C Malichak 1 1007
7 6D Meghobigha 1 1043
8 13B Dharmshil bigha 1 1032
9 Sikandarpur 1B Purvi Tola 0 959
10 9B Bramha Bigha 1 811
11 10B Gulab Ganj 1 877
12 11B Sawan Bigha 1 883
13 7B Mathiya Par 0 660
14 2B Das Tola 1 807
15 Kansua 9B Rasiya Bigha 1 686
16 8B Mahadalit Tola 1 654
17 4B Koirigoriya 1 739
18 7B Ramse Bigha 1 806
19 12B Jharkha 1 705
20 Pandual 11B Bandhu Bigha 0 807
21 Nehalpur 9B Gaushiya Par 1 995
22 12B Mustichak 1 895
23 Sesmba 9B Ravidas Tola 1 966
24 Ratani 3B Phauladpur 1 978
25 Narayanpur 8B Baudd Bigha 1 906
26 Jhunathi 7B Yadu Bigha 1 926
27 12B Ravidas Tola 1 964
28 5B Kothiya Par 1 943
29 3B Nanhaganj 1 958
30 3C Mathiya Par 1 952
31 3D Jivan Bigha 1 996
32 4B Pachasi 1 982
33 7C Bhuwan Bigha 1 877
34 7D Chunni Bigha 1 793
35 7E Karni Bigha 1 1238
36 Jhunathi 7F Mandal Nagar 1 913
37 Murhara 9B Banke Bigha 1 928
38 8B Dhukhi Bigha 1 987
39 10B Manjhi Tola 1 1052
40 3B Murgia Chak 1 1263
41 3C Chiryatar 1 1271
42 Kasma 12B Kazichak 0 810
43 Nowama 10B Sesarpur 1 761
44 9B Tulsi Bigha 1 923
Estimated Cost in Rs. Including Contingency (As per Attached Abstract Estimate)
Executive Engineer
P.H. Division,Jehanabad
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT - 03 (1).pdf
NIT • 3.73 MB
FINANCIAL BID GR.-06 (R2).xls
NIT • 0.45 MB
TECHNICAL BID GR.-06 (R2).xlsx
NIT • 0.10 MB
Nit 9 cori.pdf
NIT • 0.35 MB
NOTES TO TENDER GR-06.pdf
NIT • 1.86 MB
Approved BOQ Group-6.pdf
NIT • 0.43 MB
TECHNICAL BID GR.-06 (R2).xlsx
NIT • 0.10 MB
FINANCIAL BID GR.-06 (R2).xls
NIT • 0.45 MB
NIT - 03 (1).pdf
NIT • 3.73 MB
134164802154635630 (1).pdf
NIT • 2.10 MB
Nit 9 cori.pdf
NIT • 0.35 MB
FINANCIAL BID GR.-06 (R2).xls
NIT • 0.45 MB
C1 corrigendom Date.pdf
Corrigendum • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .