| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC Lowest Value |
| 2 | L2₹12.1 LRejected-Finance | ₹12.1 L | L2 | Rejected-Finance Highest Value |
| Sl No | Description | Qty | Unit | R SASIKUMAR L2 | K ARUN L1 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Pavement @ Kumaravelan Nagar Santhavasal Village in Santhavasal panchayat | |||||
| 1.01CC Road | |||||
| 1.02 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 47.16 | Cu.m | 270 ₹12,733.20 | 255 ₹12,025.80 |
| 1.03 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 71.53 | Cu.m | 5,525 ₹4.0 L | 5,520 ₹3.9 L |
| 1.04 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 265.28 | sqm | 370 ₹98,153.60 | 355 ₹94,174.40 |
| 1.05 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 75.75 | Cu.m | 6,830 ₹5.2 L | 6,805 ₹5.2 L |
| 1.06 | Provision bitumen pad for expansion joint between cc pavements 15 mm thick | 9.65 | sqm | 240 ₹2,316.72 | 233 ₹2,249.15 |
| 1.07 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,84,640 ₹1.8 L | 1,83,379 ₹1.8 L |
Tender Value
₹12.2 L
EMD Value
₹12,200
Closing Date
5 Mar 2026, 3:00 pmClosed
Block Development Officer B.P
Block Development Office, Polur
Providing New CC Pavement at Kumaravelan Nagar 165m at Santhavasal Panchayat
2026_RDTN_665315_3
A2/112/2026
Open Tender
Civil Works
Block Development Office, Polur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,200
10 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
5 Mar 2026
Providing Cement Concrete Pavement @ Kumaravelan Nagar Santhavasal Village in Santhavasal panchayat
CC Road
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision bitumen pad for expansion joint between cc pavements 15 mm thick
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocument.pdf
Tender Documents • 1.19 MB
BOQ_805861.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid