Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC KAMARAJAR STREET KALATHUPOTTAL THATHANERI MADURAI 625018 | MADURAI | TAMIL NADU | 625018 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹13,099 (2.68%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹5.0 L
EMD Value
₹4,961
Closing Date
13 May 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Ponmeni Main Drainage Pumping 80HP, SPS-3 20HP, Kokalappi pumping 5HP, Fenner colony 5 HP submersible pump Repairing zone-3
2025_MAWS_551559_1
D1/EST- 008035/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,961
15 Jul 2025
29 Apr 2025
13 May 2025
29 Apr 2025
13 May 2025
29 Apr 2025
Amount
Ponmeni Pumping 80 Hp Submersible Repair. Ponmeni Drainage Pumping Station 80 Hp Submersible Motor in Well .Lifting 80Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
80 HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping.
Dismandling Of 80 Hp Motor Pump Bottum Side Bearing Double row Angular Bearing 1 No ,Top Side Rubber Sealed Ball Bearing 1 no Removing Using Hydralic Machine then Transportation , Loading and Unloading Charges
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,1kg High TempPetrolium Bearing Grease Supply
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement of Motor and Pump Side “O” Rings
Replacement Pump Side Oil Chamber 100/120 Grade oil 30 lts .
Supply Of Pump Bottum Side Double row Angular Ball Bearing 1 Nos ,Top Side Rubber Sealed Ball Bearing 1no Should be Insulated Motor Shoft fixing Using Hydralic Machine Then Transportation , Loading and Unloading
Supply Top Side Carbon Segment Oil Seal,bottom Side Diapharam Seal 1no Should be Motor and Pump Shoft Side Fixing and Bottum Side Silicon Seal Fixing .testing.Air Pressure Check Test Charges
Motor Teriminal Block replacement and fixing.
Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover Cable Body Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer , Painting and Erection in Well Loading &Unloading Charge Using crane Block and Testing.
Sps-3 Pumping 20 Hp Repairing SPS-3 Drainage Pumping Station 20 Hp Submersible Motor in Well .Lifting 80Hp Submersible Using Chain block then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,Impeller ,Oil Seal Body,Bottum Cell Body.
20 HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” Class Insulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Legs Supply and Gripping.
Dismandling Of 20 Hp Motor Pump Bottum Side Bearing Double row Angular Bearing 1 No ,Top Side Rubber Sealed Ball Bearing 1 no Removing Using Hydralic Machine then Transportation , Loading and Unloading Charges
Motor Top Side Rubber Sealed Ball Bearing 1 nos,aBottum Metal Double row Angular Ball Bearing 1 no Over all 2 Nos Bearing Supply,1kg High TempPetrolium Bearing Grease Supply and Fixing.
Supply Of Motor Top side Carbon Segment vs S.S Mechanical Oil Seal 1 no.
Motor Bottum Side Diapharam Fixed Silicon Metal Oil Seal 1 no Supply.
Replacement of Motor and Pump Side “O” Rings
Replacement Pump Side Oil Chamber 100/120 Grade oil 30 lts .
Motor Rotor Shaft Thread Portion Center Using Center to Center Top and Bottum Bearing Base Dynamic Balancing
Motor Teriminal Block replacement and fixing.
Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump Impeller Rotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover Cable Body Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer , Painting and Erection in Well Loading &Unloading Charge Using chain Block and Testing.
Kokalappi pumping 5 Hp Repair Kokalappi Drainage Pumping 5 Hp Submersible Motor in Well . Lifting 5Hp Submersible Using ChainBlock then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber, Impeller ,Oil Seal Body,Bottum Cell Body.
5 HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” ClassInsulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Lugs Supply and Gripping.
Supply of Motor Top Side Carbon Segment Vs SS Mechanical oil Seal (Top)
Supply of Motor Bottom Side DiapharmSiliicon oil seal
Motor Top Side Rubber Sealed Ball Bearing 1 nos,andBottum Double row Ball Bearing 1 no Over all 2 Nos Supply, High TempPetrolium Bearing Grease Supply
Replacement Pump Side Oil Chamber 100/120 Grade oil
Replacement of Motor Teriminal Block
Replacement of Motor and Pump Side “O” Rings
Motor and Pump Profile Gasket
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing
Fenner Colony pumping 5 Hp Repair Fenner Colony Drainage Pumping 5 Hp Submersible Motor in Well . Lifting 5Hp Submersible Using ChainBlock then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber, Impeller ,Oil Seal Body,Bottum Cell Body.
5 HP Motor Stator Coil Complete Burnout.Removing Complete Startorcoil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” ClassInsulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Lugs Supply and Gripping.
Supply of Motor Top Side Carbon Segment Vs SS Mechanical oil Seal (Top)
Supply of Motor Bottom Side Diapharm Siliicon oil seal
Replacement Pump Side Oil Chamber 100/120 Grade oil
Replacement of Motor Teriminal Block
Replacement of Motor and Pump Side “O” Rings
Motor and Pump Profile Gasket
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor BodyCell,PumpImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling,NewAlanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing
Old Material Less Cost {Less}(-)
Add GST 18%
MAAG ELECTRICAL SOLUTION (BID ID -1332770)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .