| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAdmitted-Finance 822101 | PALAMU | JHARKHAND | 822101 | ₹10.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.8 Cr+₹62.6 L (6.15%)Admitted-Finance | ₹10.8 Cr+₹62.6 L (6.15%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical DUMKA | JHARKHAND | 814101 | - | - | Rejected-Technical NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPOSNIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | Manish Kumar L1 | Maa Vindhyawasini Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 2,898.62 | cu.m | 143.03 ₹4,14,589.62 Lowest | 151.82 ₹4,40,068.49 |
| 2.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 1,665.45 | cu.m | 14.61 ₹24,332.22 Lowest | 15.51 ₹25,831.13 |
| 3.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 1,608.86 | cu.m | 52.08 ₹83,789.43 Lowest | 55.28 ₹88,937.78 |
| 4.00 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 485.44 | cu.m | 555.38 ₹2,69,603.67 Lowest | 589.51 ₹2,86,171.73 |
| 5.00 | Providing designation 75A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 45.64 | cu.m | 5,124.88 ₹2,33,899.52 Lowest | 5,439.85 ₹2,48,274.75 |
| 6.00 | Providing designation 75B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 212.15 | cu.m | 4,814.38 ₹10,21,370.72 Lowest | 5,110.26 ₹10,84,141.66 |
| 7.00 | Providing designation 75Abrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 229.58 | cu.m | 5,250.95 ₹12,05,513.1 Lowest | 5,573.67 ₹12,79,603.16 |
| 8.00 | Providing designation 75Bbrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 201.53 | cum | 4,940.45 ₹9,95,636.54 Lowest | 5,244.08 ₹10,56,826.33 |
| 9.00 | Providing designation 125mm thick reinforced designation 75A brick work in (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening carriage of materials, scaffolding, raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement0 all complete as per building specification and direction of E/I. | 347.89 | SQ.MT | 672.18 ₹2,33,844.7 Lowest | 713.49 ₹2,48,216.04 |
| 10.00 | Extra for brick work for each consecutive floor above first floor including watering and scaffolding, all complete as per direction of E/I. Terrace Floor | 133.57 | cu.m | 5,377.03 ₹7,18,209.9 Lowest | 5,707.49 ₹7,62,349.44 |
Tender Value
Refer Docs
EMD Value
₹10.8 L
Closing Date
2 Jun 2026, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya, Dhurwa, Ranchi- 834004.
Balance work of Proposed Repair, Renovation AND New Construction in Sidhu Kanhu Murmu University at Dumka
2026_JSBCC_113576_1
JSBCCL/19/2026-27
Open Tender
Civil Works - Buildings
Item Rate
365 days
Dumka
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹10.8 L
29 Jul 2026
8 May 2026
3 Jun 2026
8 May 2026
2 Jun 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 2,898.62 | cu.m | - | - |
| - | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 1,665.45 | cu.m | - | - |
| - | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 1,608.86 | cu.m | - | - |
| - | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 485.44 | cu.m | - | - |
| - | Providing designation 75A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 45.64 | cu.m | - | - |
| - | Providing designation 75B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 212.15 | cu.m | - | - |
| - | Providing designation 75Abrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 229.58 | cu.m | - | - |
| - | Providing designation 75Bbrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 201.53 | cum | - | - |
| - | Providing designation 125mm thick reinforced designation 75A brick work in (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening carriage of materials, scaffolding, raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement0 all complete as per building specification and direction of E/I. | 347.89 | SQ.MT | - | - |
| - | Extra for brick work for each consecutive floor above first floor including watering and scaffolding, all complete as per direction of E/I. Terrace Floor | 133.57 | cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_153713.xls
BOQ • 0.42 MB
SBD19.pdf
Tender Documents • 11.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .