Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Lowest amount quoted |
| 2 | L2₹7.2 L+₹922.75 (0.13%)Rejected-Finance THIRUNANDHANUR MAYILADUTHURAI | MAYILADUTHURAI | MAYILADUTHURAI | TAMIL NADU | ₹7.2 L+₹922.75 (0.13%) | L2 | Rejected-Finance Highest amount Quoted for L1 |
| 3 | L3₹7.3 L+₹13,410.70 (1.88%)Rejected-Finance | ₹7.3 L+₹13,410.70 (1.88%) | L3 | Rejected-Finance Highest amount Quoted for L1 |
| 4 | L4₹7.3 L+₹13,558.36 (1.90%)Rejected-Finance | ₹7.3 L+₹13,558.36 (1.90%) | L4 | Rejected-Finance Highest amount Quoted for L1 |
| 5 | L5₹7.3 L+₹20,690.35 (2.90%)Rejected-Finance 2 207 MOOVALUR MELA STREET MAYILADUTHURAI NAGAPATTINAM TAMIL NADU 609806 UDYAM TN 38 0011148 | MAYILADUTHURAI | TAMIL NADU | 609806 | ₹7.3 L+₹20,690.35 (2.90%) | L5 | Rejected-Finance Highest amount Quoted for L1 |
| Sl No | Description | Qty | Unit | BAMBOO INFRA PRIVATE LIMITED L5 | Vinayaga Construction L8 | G.Prabhu L7 | Tamizhagarasi karthikeyan L4 | G Prakash Christopher Civil Contractor L2 | s.kalidasan L6 | Baluprasath L3 | Marimuthu L9 | MM Engineering Contracotor L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of MINI CSC at Government High school in Korkai panchayat at Mayiladuthurai Block | ||||||||||||
| 2.00 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 27.99 | cum | 200 ₹5,598 | 200 ₹5,598 | 247.95 ₹6,940.12 | 240 ₹6,717.6 | 220 ₹6,157.8 | 100 ₹2,799 Lowest | 220 ₹6,157.8 | 215 ₹6,017.85 | 232.07 ₹6,495.64 |
| 3.00 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 5.85 | cum | 2,300 ₹13,455 | 2,300 ₹13,455 | 2,388.49 ₹13,972.67 | 2,000 ₹11,700 Lowest | 2,500 ₹14,625 | 2,000 ₹11,700 Lowest | 2,500 ₹14,625 | 2,315 ₹13,542.75 | 2,235.53 ₹13,077.85 |
| 4.00 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 2.61 | cum | 6,100 ₹15,921 | 6,400 ₹16,704 | 6,136.15 ₹16,015.35 | 5,200 ₹13,572 Lowest | 6,400 ₹16,704 | 6,400 ₹16,704 | 6,400 ₹16,704 | 6,410 ₹16,730.1 | 5,743.18 ₹14,989.7 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 and conveyance of all materials to site and all labour charges etc complete (Below Basement) | 7.26 | cum | 5,900 ₹42,834 | 6,300 ₹45,738 | 5,964.77 ₹43,304.23 | 6,200 ₹45,012 | 6,300 ₹45,738 | 6,300 ₹45,738 | 6,300 ₹45,738 | 6,300 ₹45,738 | 5,582.77 ₹40,530.91 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 and conveyance of all materials to site and all labour charges etc complete (above Basement) | 12.66 | cum | 6,000 ₹75,960 | 6,300 ₹79,758 | 6,052.07 ₹76,619.21 | 6,500 ₹82,290 | 6,000 ₹75,960 | 6,150 ₹77,859 | 6,000 ₹75,960 | 6,300 ₹79,758 | 5,664.48 ₹71,712.32 Lowest |
| 7.00 | Plastering with cm 1:5 mix( one cement and Five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. | 125.61 | Sqm | 200 ₹25,122 Lowest | 250 ₹31,402.5 | 278.34 ₹34,962.29 | 280 ₹35,170.8 | 200 ₹25,122 Lowest | 250 ₹31,402.5 | 220 ₹27,634.2 | 250 ₹31,402.5 | 260.52 ₹32,723.92 |
| 8.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 24.03 | Sqm | 500 ₹12,015 | 540 ₹12,976.2 | 514.65 ₹12,367.04 | 515 ₹12,375.45 | 500 ₹12,015 | 540 ₹12,976.2 | 550 ₹13,216.5 | 545 ₹13,096.35 | 481.69 ₹11,575.01 Lowest |
| 9.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 43.89 | Sqm | 900 ₹39,501 Lowest | 1,050 ₹46,084.5 | 1,029.3 ₹45,175.98 | 1,030 ₹45,206.7 | 950 ₹41,695.5 | 1,050 ₹46,084.5 | 1,020 ₹44,767.8 | 1,055 ₹46,303.95 | 963.38 ₹42,282.75 |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (blow Basement) | 2.38 | Sqm | 9,500 ₹22,610 | 10,300 ₹24,514 | 9,786.78 ₹23,292.54 | 8,300 ₹19,754 Lowest | 10,400 ₹24,752 | 10,300 ₹24,514 | 10,400 ₹24,752 | 10,300 ₹24,514 | 9,160.01 ₹21,800.82 |
Tender Value
₹8.2 L
EMD Value
₹8,300
Closing Date
30 Jul 2026, 3:00 pmClosed
Block Development Officer (B.P)
Block Development Office Mayiladuthurai
Construction of MINI CSC at Government High school in Korkai panchayat at Mayiladuthurai Block
2026_RDTN_685800_1
6527/2025/A3 14.07.2026
Open Tender
Civil Works
Item Rate
180 days
Block Development Office Mayiladuthurai
Refer Tender Document
8 documents required · 8 mandatory
₹0
₹8,300
Yes
12 Aug 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of MINI CSC at Government High school in Korkai panchayat at Mayiladuthurai Block | - | - | - | - |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 27.99 | cum | 263.78 | ₹7,383.2 |
| 3 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 5.85 | cum | 2,540.95 | ₹14,864.56 |
| 4 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 2.61 | cum | 6,527.82 | ₹17,037.61 |
| 5 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 and conveyance of all materials to site and all labour charges etc complete (Below Basement) | 7.26 | cum | 6,345.5 | ₹46,068.33 |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 and conveyance of all materials to site and all labour charges etc complete (above Basement) | 12.66 | cum | 6,438.37 | ₹81,509.76 |
| 7 | Plastering with cm 1:5 mix( one cement and Five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. | 125.61 | Sqm | 296.11 | ₹37,194.38 |
| 8 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 24.03 | Sqm | 547.5 | ₹13,156.43 |
| 9 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 43.89 | Sqm | 1,095 | ₹48,059.55 |
| 10 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (blow Basement) | 2.38 | Sqm | 10,411.47 | ₹24,779.3 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
pb.pdf
Tender Documents • 0.40 MB
tb.pdf
Tender Documents • 1.01 MB
BOQ_824365.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .