Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC NO 1 80 1ST FLOOR CHELLAMMAL PANDIYAN ILLAM 3RD STREET SATHYAVATHY NAGAR PADI NEAR BSNL CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | ₹4.1 Cr Quoted ₹4.2 Cr | L1 | Accepted-AOC L1- Lowest |
| 2 | L2₹4.6 Cr+₹43.9 L (10.5%)Rejected-AOC | ₹4.6 Cr+₹43.9 L (10.5%) | L2 | Rejected-AOC L2-Highest |
| Sl No | Description | Qty | Unit | Aiga Engineers Pvt Ltd L1 | HITECH LIFT MOVERS INDIA P LTD L2 |
|---|---|---|---|---|---|
| 1.00Replacement of Pump set at Head works and pipe line in Pumping Main, Gravity Main and Feeder Main under CWSS To T.Palur and 212 Habitations in T.Palur Union of Ariyalur District Under Revamping works 2025-2026 (Period of Construction: 6 Months & Free Maintenance: 3 Months). | |||||
| 1.01 | Supply,delivery, laying and jointing of new HDPE pipes by replacement of existing Pipe line | 1 | No | 94,26,231.5 ₹94,26,231.5 Lowest | 1,04,51,080.35 ₹1,04,51,080.35 |
| 1.02 | Supply , Delivery and Erection of Pumpsets for Head works, Booster Station and Group sumps. | 1 | No | 2,00,88,195.27 ₹2,00,88,195.27 Lowest | 2,21,69,800.19 ₹2,21,69,800.19 |
| 1.03 | Supply , Delivery and Erection of Pumpsets for Booster Station and Group sumps. | 1 | No | 51,39,583.92 ₹51,39,583.92 Lowest | 56,83,197.79 ₹56,83,197.79 |
| 1.04 | Painting for Various capacity of Sumps | 1 | No | 6,54,324.32 ₹6,54,324.32 Lowest | 7,23,581.54 ₹7,23,581.54 |
| 2.00 | Sub Total | 1 | no | 3,53,08,335.01 ₹3,53,08,335.01 Lowest | 3,90,27,659.87 ₹3,90,27,659.87 |
| 3.00 | GST in 18% | 1 | GST | 63,55,500.3 ₹63,55,500.3 Lowest | 70,24,978.78 ₹70,24,978.78 |
Tender Value
₹4 Cr
EMD Value
₹3 L
Closing Date
3 Jul 2025, 3:00 pmClosed
CHIEF ENGINEER, TWAD BORD, THANJAVUR
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
CWSS To T.Palur and 212 Habitations In T.Palur Union in Ariyalur District under Revamping work
2025_TWAD_573562_1
04 /F.Revamping CWSS/ SDO/CE-TNJ/2025
Open Tender
Civil Works
Turn-key
180 days
TWAD BOARD, CHIEF ENGINEER
as per bid document
3 documents required · 3 mandatory
₹0
₹3 L
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
26 Sept 2025
25 Jun 2025
4 Jul 2025
25 Jun 2025
3 Jul 2025
27 Jun 2025
26 Jun 2025
Amount
Replacement of Pump set at Head works and pipe line in Pumping Main, Gravity Main and Feeder Main under CWSS To T.Palur and 212 Habitations in T.Palur Union of Ariyalur District Under Revamping works 2025-2026 (Period of Construction: 6 Months & Free Maintenance: 3 Months).
Supply,delivery, laying and jointing of new HDPE pipes by replacement of existing Pipe line
Supply , Delivery and Erection of Pumpsets for Head works, Booster Station and Group sumps.
Supply , Delivery and Erection of Pumpsets for Booster Station and Group sumps.
Painting for Various capacity of Sumps
Sub Total
GST in 18%
HITECH LIFT MOVERS INDIA P LTD (BID ID -1388474)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .