Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-Finance | ₹23.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹24.7 LRejected-Finance GILANPARA DUMKA | DUMKA | JHARKHAND | 814101 | ₹24.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹24.9 LRejected-Finance BHAGALPUR ROAD TATA SHOWROOM DUMKA JHARKHAND | ₹24.9 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical DUMKA JHARKHAND | - | - | Rejected-Technical Non responsive |
Tender Value
₹24.9 L
EMD Value
₹49,900
Closing Date
28 Apr 2026, 3:00 pmClosed
EXECUTIVE OFFICER NAGAR PARISHAD DUMKA
EXECUTIVE OFFICER NAGAR PARISHAD DUMKA
Construction of R.C.C. drain from Abhay Sinha house to Sambhunath Mishra to Anand Mandal house towards ward no. 02
2026_UDD_112412_1
UDD/DNP/03/2026-27 GR 06
Open Tender
Civil Works
90 days
NAGAR PARISHAD DUMKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹49,900
5 Jun 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
28 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trench in Hard soil (Vide classification of Soil item B) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.(5.1.1) | - | M3 | - | - |
| 2 | Earth work in excavation in foundation trench in Hard soil (Vide classification of Soil item B) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.(5.1.1)+5.1.2 | - | M3 | - | - |
| 3 | Dismantling PCC work including stacking serviciable materials in countable stacks within 15m. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.(5.10.2) | - | M3 | - | - |
| 4 | Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. ( 5.1.10) | - | M3 | - | - |
| 5 | Providing designation 75B one B/F/Soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. (5.6.3) | - | M2 | - | - |
| 6 | P/V and laying in position specification grade of RCC M-200 excluding the cost of centering ,shuttering , finishing and reinforcement all work plinth level in bed 5.3.9 BCD | - | M3 | - | - |
| 7 | Providing P.C.C. M-200 nominal mix of (1:1.5:3) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of E/I. (5.3.1.1) | - | M3 | - | - |
| 8 | Providing R.C.C. M-200 nominal mix of (1:1.5:3) in various component of canal structure with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of E/I. (5.3.10) wall | - | M3 | - | - |
| 9 | Centaring and Shuttering including struting,Proping etc.and removal of from for Foundation, Footing, based of columns,etc for mas concrete do-do E/I (5.3.17.2)BCD | - | M3 | - | - |
| 10 | Centaring and Shuttering including struting,Proping etc.and removal of from for Foundation, Footing, based of columns,etc for mas concrete do-do E/I (5.3.17.1)BCD | - | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_151784.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.28 MB
BOQ_151784.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid