| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance 38A KALIGHAT ROAD KOLKATA 26 | KOLKATA | KOLKATA | WEST BENGAL | +1.25% | ₹3.1 L | L2 | Admitted-Finance |
| 3 | L3₹3.1 LAdmitted-Finance | +1.66% | ₹3.1 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹3.0 L
EMD Value
₹6,056
Closing Date
22 May 2026, 5:30 pmClosed
EE, MECH. AND ELECT. DIVISION, MIDNAPORE
MIDNAPORE
Repair and Maintenance of 2 nos. draw shutter including their hoisting arrangement of Bolgora Sluice in Block- Chandipur under P.S.- Chandipur in the District of Purba Medinipur.
2026_IWD_1023747_4
WBIW/EE/MEDM/e-NIT-02/2026-27
Open Tender
MECHANICAL
90 days
BOLGORA SLUICE CHANDIPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹6,056
1 Jun 2026
12 May 2026
25 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits /River bed / slope of bank as noted below as per designed section &throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metreand initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil | 108 | cum | 129.91 | ₹14,030.28 | 1 |
| 2 | Dismentling of screw hoisting system consisting of gear/ screw rod, padestal stool, top plate, bottom plate, G.M/C.I bush, operating wheel etc for repairing/replacement of gates and staking suitable place or as per direction of E.I.C. The cost includes cost of man power employed for dismantling, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading | 2 | Each | 1,842.9 | ₹3,685.8 | 2 |
| 3Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m In ground floor including roof | ||||||
| 3.01 | above 150 mm. thick | 0.6 | cum | 1,688.78 | ₹1,013.27 | 4 |
| 4 | Hire and Labour charges for shuttering with centreing and necessary staging upto 4m using approved stout props and thick hard wood plank of approved thikness of required bracing for concreat slabs, beam and columns lintels, curve or straight including fitting fixing and striking out after completion of work (upto roof of ground floor)
(a) 25mm. to 30mm. thick wooden shuttering as per decesion & direction of Engineer in charge. | 4 | sqm | 386.14 | ₹1,544.56 | 5 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevent IS code.(i) With local hard blackstone variety chips (crusher broken) | 0.6 | cum | 6,135.39 | ₹3,681.23 | 6 |
| 6Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Canal/River as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). | ||||||
| 6.01 | i) Width of Gate shuteer size upto 2 metre | 582 | Kg | 156.48 | ₹91,071.36 | 8 |
| 7 | Supplying, fitting & fixing of screw hoisting arangement made of C.I. bottom plate , top plate, coller (free from any casting defects) with necessary holes on base plate and top plate to accomodate thrust bearing of suitable size as per approved drawing & design and as per direction of Engineer in charge. The cost includes cost of materials, man power employed for dismantling and fitting fixing, consumables like cutting tools, bolt & nuts of required size, hire charges of machineries, like lathe/shaping machine, grinding machine, drilling machine, tools & tackles etc including carriage loading & unloading but excluding the cost of lifting Nut/Bush, thrust bearing & wheel supplied seperately. | 79 | kg | 241.95 | ₹19,114.05 | 9 |
| 8Supply of Bearing | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
29114.pdf
Tender Documents • 0.57 MB
BOQ_2516365.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid