Loading…
Loading…
Tender Value
₹23.3 L
EMD Value
₹23,268
Closing Date
16 Jun 2026, 5:00 pm
Superintending Engineer
O/o the S.E, RandB Division, Nayagarh
S/R to Gania Badamul-Kuturi road Such as Pot hole repair Patches with WMM, Primer, Tack coat, PMC and SC from 0/0km to 10/057km ) for the year 2026 27
2026_EICCL_131251_2
eTCN04 of 2026-2027
Open Tender
Civil Works - Roads
60 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,268
Yes
6 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Providing, Laying, spreading & compacting graded stone aggregate of to W.M.M. specifications including premixing material with water at OMC in mechanical mix plant and carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with VRR to achive the desired density as per Clause 406 of MoRT&H specifications for Road & Bridge Work (4th Revision). | 1 | cum | 2,575.81 | ₹2,573.23 | 1 |
| 2 | Providing and Applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleanig the road surface and spreading primer @ 0.60kg per sqm using mechanical means as per Clause 502 of MoRT&H specifications for Road & Bridge Works (4th Revision). | - | sqm | 60.89 | - | 2 |
| 3 | Providing & Applying Tack coat over bituminous surface using 80/100 penetration grade of bitumen @ 0.2 kg per sqm including cleaning the surface & cost of bitumen and labour etc.complete. | - | sqm | 29.15 | - | 3 |
| 4 | Providing & Laying 20 mm thick Pre-Mix Carpet14.6kg penetretion grade of bitumen, 0.27cum of 13.2mm to 5.7mm size B.H.G.C.B. chips per 10 sqm and spreading over & laying including heating pouring and spreading bitumen &chips after scarping, cleaning | - | sqm | 251.03 | - | 4 |
| 5 | Providing & Laying 6mm thick Pre-Coated Seal coat using 6.8kg penetretion grade of bitumen & 0.06cum of 6.7mmsize & down graded B.H.G.C.B. chips per 10 sqm and spreading over & laying including heating pouring and spreading bitumen &chips after scar | - | sqm | 112.72 | - | 5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_594862.xls
BOQ • 0.33 MB
DTCN0402.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid