| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | ₹1.6 L | L1 | Accepted-Finance ok |
| 2 | L2₹1.9 L+₹26,101.60 (16.2%)Accepted-Finance | ₹1.9 L+₹26,101.60 (16.2%) | L2 | Accepted-Finance ok |
| 3 | L3₹2.0 L+₹34,361.60 (21.3%)Accepted-Finance | ₹2.0 L+₹34,361.60 (21.3%) | L3 | Accepted-Finance ok |
| 4 | L4₹2.0 L+₹37,901.60 (23.5%)Accepted-Finance | ₹2.0 L+₹37,901.60 (23.5%) | L4 | Accepted-Finance ok |
| 5 | Not Admitted-Fee/PreQual/Technical 46C 1P PONGHAT PUL DEFENCE INCLAVE COLONY BAMRAULI PRAYAGRAJ UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | K R ELECTRICAL L2 | RANA ELECTRO MECHANICAL L1 | S N ELECTRICAL AND CONTROL PANELS L4 | AMANDEEP ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling completely the old Outgoing ACBs from the Main LT Panel (set no. 1 & 3), complete with the housing after disconnecting the mounting and joints with the main bus bars connection after taking proper shut down. Dismantling the outgoing cable connection required to discharge the Circuit breaker completely. | 2 | Job | 30,000 ₹35,400 | 13,160 ₹15,528.8 Lowest | 25,000 ₹29,500 | 20,000 ₹23,600 |
| 1.02 | Fixing the new ACB of 1250 Amperes rating (shall be provided by the deptt.) with complete cradle in the chamber in proper manner including material and consumables for installation with complete work as required for mounting and fixing of the cradle / ACB as required along with providing & fixing of suitable Under Voltage Release as per site requirement. | 2 | Job | 0 ₹56,640 | 18,900 ₹22,302 Lowest | 0 ₹35,400 | 0 ₹35,400 |
| 1.03 | Dismantling the existing bus bars arrangement of ACB. Alteration / Modification of Bus Bar arrangement along with addition of required Bus Bar lengths in copper construction as required to connect the main bus bars and making all required joints of supply arrangement including bending / cutting / shaping of the bus bars as required. The job includes providing of consumables as per site requirement. | 2 | Job | 0 ₹35,400 Lowest | 71,600 ₹84,488 | 0 ₹1,06,200 | 0 ₹63,720 |
| 1.04 | Strengthening the existing bus bar arrangement at main bus bars of the LT Panel chambers of the ACB to be replaced by providing supports etc as per requirement of the site for tightening of the bus bar mountings and the connections / joints etc. | 2 | Job | 0 ₹35,400 | 18,220 ₹21,499.6 | 0 ₹14,160 Lowest | 0 ₹43,660 |
| 1.05 | Testing and commissioning of the newly installed ACB at No Load and then at ON Load for required operation and power supply to the connected motors as per site requirement. | 2 | Job | 0 ₹24,780 | 15,000 ₹17,700 | 0 ₹14,160 Lowest | 0 ₹29,500 |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
29 Jun 2026, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Modification and fixing of ACBs for set no 01 n 03 with all allied works in main LT Panel at CWPH Bawana
2026_DJB_294132_3
NIT NO. 02(2026-27) HP-I
Open Tender
Miscellaneous Works
Item Rate
120 days
EE EnM HP I
Please refer tender documents
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹4,500
Yes
7 Jul 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling completely the old Outgoing ACBs from the Main LT Panel (set no. 1 & 3), complete with the housing after disconnecting the mounting and joints with the main bus bars connection after taking proper shut down. Dismantling the outgoing cable connection required to discharge the Circuit breaker completely. | 2 | Job | - | - |
| 1.02 | Fixing the new ACB of 1250 Amperes rating (shall be provided by the deptt.) with complete cradle in the chamber in proper manner including material and consumables for installation with complete work as required for mounting and fixing of the cradle / ACB as required along with providing & fixing of suitable Under Voltage Release as per site requirement. | 2 | Job | - | - |
| 1.03 | Dismantling the existing bus bars arrangement of ACB. Alteration / Modification of Bus Bar arrangement along with addition of required Bus Bar lengths in copper construction as required to connect the main bus bars and making all required joints of supply arrangement including bending / cutting / shaping of the bus bars as required. The job includes providing of consumables as per site requirement. | 2 | Job | - | - |
| 1.04 | Strengthening the existing bus bar arrangement at main bus bars of the LT Panel chambers of the ACB to be replaced by providing supports etc as per requirement of the site for tightening of the bus bar mountings and the connections / joints etc. | 2 | Job | - | - |
| 1.05 | Testing and commissioning of the newly installed ACB at No Load and then at ON Load for required operation and power supply to the connected motors as per site requirement. | 2 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_391039.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .