| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance 4 109 PALLIPATTY VILLAGE PALLIPATTY PO METTUR TK SALEM DISTRICT METTUR 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹45.4 L (24.1%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.3 Cr+₹45.4 L (24.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMMASI.P L1 | M s Kumaresan and co L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for levelling the site in hard gravelly soil and deposting on bank with an initial lead of 10 mtrs. and lift of 2M
Hard Rock requiring blasting | 500 | m3 | 1,000 ₹5,00,000 Lowest | 1,200 ₹6,00,000 |
| 2.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete.
In hard gravelly soil | 654 | m³ | 150 ₹98,100 Lowest | 200 ₹1,30,800 |
| 3.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
In medium rock and dense medium rock not requiring blasting. | 120 | m³ | 400 ₹48,000 Lowest | 500 ₹60,000 |
| 4.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Hard Rock requiring blasting&stacking | 40 | m³ | 1,000 ₹40,000 Lowest | 1,500 ₹60,000 |
| 5.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Removing hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited SR 39A | 40 | m³ | 2,000 ₹80,000 Lowest | 2,000 ₹80,000 Lowest |
| 6.00 | PCC 1:3:6 using 20mm HBG metal for foundation including cost of cement, without formwork all materials, labour, lead, lift etc. complete | 166 | m³ | 7,000 ₹11,62,000 Lowest | 7,500 ₹12,45,000 |
| 7.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete.
Transformer plinth and Breaker plinth without form work | 122 | m3 | 7,500 ₹9,15,000 Lowest | 8,500 ₹10,37,000 |
| 8.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete.
Structure Plinth and retaining wall with form work | 315 | m3 | 12,000 ₹37,80,000 Lowest | 13,000 ₹40,95,000 |
| 9.00 | Supplying and filling in Good quality of gravel in layer of 150 mm thick well watering and consolidation including cost of earth, labour, lead, lift etc. complete for basement | 1,930 | m³ | 700 ₹13,51,000 Lowest | 1,000 ₹19,30,000 |
| 10.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for plinth with formwork including cost of cement all materials, labour, lead, lift, curing etc. complete but excluding cost of steel reinforcement | 55 | m³ | 14,500 ₹7,97,500 Lowest | 15,000 ₹8,25,000 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
29 Aug 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Providing Transformer Plinth, Various structure plinths, Cable duct, RCC Road, Retaining wall, Yard filling, HBG Metal filling, and all allied civil works for proposed Vellakkal 110 /11 kVSS in Dharmapuri EDC
2025_EB_593278_1
TP1-60/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
VELLAKAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.5 L
26 Sept 2025
14 Aug 2025
30 Aug 2025
14 Aug 2025
29 Aug 2025
14 Aug 2025
Amount
Earthwork excavation for levelling the site in hard gravelly soil and deposting on bank with an initial lead of 10 mtrs. and lift of 2M Hard Rock requiring blasting
Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete. In hard gravelly soil
Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete In medium rock and dense medium rock not requiring blasting.
Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete Hard Rock requiring blasting&stacking
Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete Removing hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited SR 39A
PCC 1:3:6 using 20mm HBG metal for foundation including cost of cement, without formwork all materials, labour, lead, lift etc. complete
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. Transformer plinth and Breaker plinth without form work
PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. Structure Plinth and retaining wall with form work
Supplying and filling in Good quality of gravel in layer of 150 mm thick well watering and consolidation including cost of earth, labour, lead, lift etc. complete for basement
RCC 1:1.5:3 using 12 to 20 mm HBG metal for plinth with formwork including cost of cement all materials, labour, lead, lift, curing etc. complete but excluding cost of steel reinforcement
Brick work in cm 1:5 using country bricks for cable duct including cost of all materials, labour, lead, lift etc. complete
RCC 1:1.5:3 precast slab for septic tank cable duct cover slab and fencing form work using 12 mm to 20 mm HBG metal & smooth finish including cost of all materials, labour, lead, lift etc. complete but excluding cost of providing steel reinforcement
Providing steel reinforcement MS/RTS rod of size 16 mm and below including cost of binding wire, labour charges for cutting, bending, tying straightening fixing and placing in position including cost of all materials, lead, lift etc, complete.
Plastering with cm 1:3, 12mm thick for partition walls cup board walls, steps including cost of cement and all materials, labour, lead, lift etc. complete.
Plastering with cm 1:5, 12mm thick for inside and outside the building including cost of cement all other materials, lead, lift curing etc. complete.
Colour washing two coats outside walls using Exterior emulsion paint over a primer one coat and two coats of all materials,labour,lead,lift etc., complete
Transport and fixing in position of precast slab for covering the septic tank including cost of gap filling with cement mortar, labour, lead, lift etc. complete.
Supplying and fixing of 110mm dia pvc pipe for cable duct inside the control room building & septic tank connection including cost of all materials, lead, lift etc. complete
Supplying and fixing fabrication of cable duct angle with flats of approved size and design with all fittings and furniture and paintings two coats of approved best quality of enamel paint over primary coat including cost of all materials, lead, lift etc. complete.
Providing Anchor /Grip rod for foundation in the rock surface with drilling of 40 mm dia holes and fixing of 25 mm dia RTS rod 1.m length inside the holes and 1m length out side the holes with L shape bending including cost of all materials labour lead lift etc complete.
Labour charges for supply, fabrication and fixing of Template including aligining in position including labour lead lift etc., complete.
Labour charges for supply, Fabrication and fixing of GI grouting bolt for plinths as per specification and drawing including cost of all materials labour lead lift etc., complete.(20 mm Dia 1.2 m length)
Supply and fixing of MS rail including transport,aliginging in position etc complete
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. 40mm dia PVC Pipe
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. 32mm dia PVC Pipe
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. 25mm dia PVC Pipe
Supplying and fixing inposition of GM gate valve best quality such as leader, zeolite, zenith including cost of all special fixtures lead, lift,etc., complete. 40 mm dia GM gate valve
Supplying and fixing inposition of GM gate valve best quality such as leader, zeolite, zenith including cost of all special fixtures lead, lift,etc., complete. 25mm dia GM gate valve
Supply and erection of 20 mm PVC Tap for earth pits.
Trimming the bed and the side slobe of the bank in all soils except hard rock cuto thichness of 7.5 cm and making it ready to receice concrete.
Providing and laying spreading and compacting graded stone aggregates to wet mix macadum 150 mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniorm layers with pavers in sub / base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials labour charges rentals for mahinery fuel and all other incidental charges etc. complete as per clause 406 of MOST Rev.5.
R.C.C 1:11/2:3 concrete 150 mm thick using 12 to 20 mm HBG metal including form work by using channels by laying Panel type and Road top finishing by providing brushing for rough finishing , including cost of all materials all lead and lift etc complete.
Providing expansion joint using sale tax pad for every 5 m intervals and after completing the curing period removing the pad and refilling with M sand with Bitumn in the required ratio including cost of all materials all lead lift etc complete.
Providing RCC Hume pipe in the RCC road (30cm) including cost of all materials ,labour lead lift etc complte..
Supplying and filling of stone dust with required thickness all lead and lift including and all other T&P etc., complete.
Supplying and filling of stone chips 12 mm to 20 mm HBG metal with required thickness all lead and lift including and all other T&P etc., complete.
Supplying and fixing readymade earth collars of size 60 cm inner dia with 30 cm height and shell thickness of 50 mm including cost of all materials,transport to site , labour, lead, lift, etc., complete., as per standard specification.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
M s Kumaresan and co (BID ID -1441442)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .