Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹33,304.69 (22.1%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
11 Aug 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_318172_2
e-NIT 01/MCD of 2026-27
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹4,000
Yes
19 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 12.34 | cum | 1,725.2 | ₹21,288.97 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,826.5 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.09 | cum | 5,733.6 | ₹80,786.42 |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 200 | kg | 181.6 | ₹36,320 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 41.13 | sqm | 286.35 | ₹11,777.58 |
| 6 | Labour required for clearance of site. | 12 | days | 553 | ₹6,636 |
| 7Carriage of Material by MT | |||||
| 0.9 | Carriage of sand avg. lead of 22 km by MT and 100 mtr by HL | 8.38 | cum | 676.38 | ₹5,668.06 |
| 0.0 | Carriage of stone agg. Above 40 mm avg. lead of 10 km by MT and 100 mtr by HL | 4.88 | cum | 567.51 | ₹2,769.45 |
| 0.9 | Carriage of Bajiri avg. lead of 10 km by MT and 100 mtr by HL | 15.86 | cum | 523.4 | ₹8,301.12 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1046672.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .