Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.1 L+₹2.7 L (13.1%)Rejected-Finance CHINNAMPALAYAM POLLACHI | L2 | Rejected-Finance L2 |
Tender Value
₹24.2 L
EMD Value
₹25,000
Closing Date
23 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE PROJECT DIRECTOR
THE PROJECT DIRECTOR, DRDA, COIMBATORE
Coimbatore District providing 5 Nos of works in Habitation Improvement under AGAMT II 2021-22 at Sokkanur, Nallattipalayam, Sulakkal, Andipalayam and Mullupadi Panchayat in Kinathukadavu Block Pkg.No.07/AGAMT II/2021-22
2022_RDTN_238640_1
Roc No 1006/2022/B2 dt 21.06.2022
Open Tender
Civil Works
Item Rate
180 days
Kinathukadavu Block, Coimbatore District
Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹25,000
DRDA, COIMBATORE
29 Nov 2022
1 Jul 2022
23 Aug 2022
1 Jul 2022
23 Aug 2022
1 Jul 2022
7 Jul 2022
Amount
Name of the work: 1. Construction of Toilet (Girls)Panchayat union Elementry school @ Muthugoundanur H/ Sokkanur Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement withexcavated earth in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Random Rubble Masonry in CM 1:5 mix using rough stone and bond stone with simaltanious pointing with same mortor incl. cost, conveyance of materials and all lobour charges etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,n
Lintel beam , Roof slab
Sunshade
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slabed lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consilidated ro required finished thickness beating the mixture with wooden beaters keeping the surface constently welted by sprinkling lime laggery water including all other labour charges etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles (using new tiles) of size 20cm x 2 cm of approved quality laid in Cement Mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar red oxide etc., complete complying with standard specification
Plastering with cement Mortar 1:5mix, to 20 mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Finishing exposed surfaced R.C.C item of works with c: m 1:3 mix 10mm thickness including racking the surface, etc.,complete complying with standard specifications and as directed.
Plastering with cement Mortar 1:5mix, to 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 150x150x6mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Cost,Supply and fixing of Oriya type Indian Water Closet etc Complete.
Towards the Cost and supply of steel Door
Towards the Cost and supply of RCC Jolly
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Towards the cost & supply of Wash basin with view mirror including all cost
Supply and fixing of Cudappah slab etc.,
Name of the work: 2. Construction of Toilet (Girls)Panchayat union Middle school @ Nallattipalayam H/ Nallattipalayam Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement withexcavated earth in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Random Rubble Masonry in CM 1:5 mix using rough stone and bond stone with simaltanious pointing with same mortor incl. cost, conveyance of materials and all lobour charges etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,n
Lintel beam , Roof slab
Sunshade
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slabed lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consilidated ro required finished thickness beating the mixture with wooden beaters keeping the surface constently welted by sprinkling lime laggery water including all other labour charges etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles (using new tiles) of size 20cm x 2 cm of approved quality laid in Cement Mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar red oxide etc., complete complying with standard specification
Plastering with cement Mortar 1:5mix, to 20 mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Finishing exposed surfaced R.C.C item of works with c: m 1:3 mix 10mm thickness including racking the surface, etc.,complete complying with standard specifications and as directed.
Plastering with cement Mortar 1:5mix, to 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 150x150x6mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Cost,Supply and fixing of Oriya type Indian Water Closet etc Complete.
Towards the Cost and supply of steel Door
Towards the Cost and supply of RCC Jolly
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Towards the cost & supply of Wash basin with view mirror including all cost
Supply and fixing of Cudappah slab etc.,
Name of the work: 3. Construction of Kitchenshed to PU Ele school @ Senniur H/O Sulakkal
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,n
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Finishing exposed surfaced R.C.C item of works with c: m 1:3 mix 10mm thickness including racking the surface, etc.,complete complying with standard specifications and as directed.
Plastering with cement Mortar 1:5mix, to 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slabed lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consilidated ro required finished thickness beating the mixture with wooden beaters keeping the surface constently welted by sprinkling lime laggery water including all other labour charges etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles (using new tiles) of size 20cm x 2 cm of approved quality laid in Cement Mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar red oxide etc., complete complying with standard specification
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Towards the Cost and supply of steel Door (0.90x2.10m)
Towards the Cost and supply of steel Window (1.20x1.30m)
Towards the Cost and supply of steel Ventilator (0.90x0.45m)
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Provision for Rainwater downfall pipe
Name of the work: 4. Construction of Toilet (Girls)Panchayat union Elementry school @ Andipalayam H/ Andipalayam Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement withexcavated earth in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Random Rubble Masonry in CM 1:5 mix using rough stone and bond stone with simaltanious pointing with same mortor incl. cost, conveyance of materials and all lobour charges etc complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,n
Lintel beam , Roof slab
Sunshade
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slabed lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consilidated ro required finished thickness beating the mixture with wooden beaters keeping the surface constently welted by sprinkling lime laggery water including all other labour charges etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles (using new tiles) of size 20cm x 2 cm of approved quality laid in Cement Mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar red oxide etc., complete complying with standard specification
Plastering with cement Mortar 1:5mix, to 20 mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Finishing exposed surfaced R.C.C item of works with c: m 1:3 mix 10mm thickness including racking the surface, etc.,complete complying with standard specifications and as directed.
Plastering with cement Mortar 1:5mix, to 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 150x150x6mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Cost,Supply and fixing of Oriya type Indian Water Closet etc Complete.
Towards the Cost and supply of steel Door
Towards the Cost and supply of RCC Jolly
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Towards the cost & supply of Wash basin with view mirror including all cost
Supply and fixing of Cudappah slab etc.,
Name of the work: 5. Construction of Kitchenshed to PU Ele school @ Mullupadi H/O Mullupadi pt
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,n
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Finishing exposed surfaced R.C.C item of works with c: m 1:3 mix 10mm thickness including racking the surface, etc.,complete complying with standard specifications and as directed.
Plastering with cement Mortar 1:5mix, to 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slabed lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consilidated ro required finished thickness beating the mixture with wooden beaters keeping the surface constently welted by sprinkling lime laggery water including all other labour charges etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles (using new tiles) of size 20cm x 2 cm of approved quality laid in Cement Mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar red oxide etc., complete complying with standard specification
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Towards the Cost and supply of steel Door (0.90x2.10m)
Towards the Cost and supply of steel Window (1.20x1.30m)
Towards the Cost and supply of steel Ventilator (0.90x0.45m)
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Provision for Rainwater downfall pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MK ROAD WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .