| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹86.9 L+₹80,655.44 (0.94%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹87.7 L+₹1.6 L (1.84%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹87.7 L+₹1.6 L (1.85%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹88.1 L+₹2.0 L (2.31%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹78.3 L
EMD Value
₹1.6 L
Closing Date
9 Feb 2026, 6:00 pmClosed
EE PWD DIVISION CHURU
EE PWD DIVISION CHURU
Constt of Helipad and Boundary wall At Khariya, Churu
2026_CEPWD_535251_1
E-NIT NO 50/2025-26 EE PWD DIVISION CHURU
Open Tender
Civil Works
Percentage
180 days
Churu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE PWD DIVISION CHURU / MDRISL
₹1.6 L
Yes
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part - A Site Clearance | - | - | - | - |
| 2 | Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means. In area of non-thorny jungle. | 2.04 | Hect | 12,513 | ₹25,526.52 |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per MoRTH Specification Clause 201.Lead upto 100 m.Girth above 1800 mm to 2700 mm | 10 | Each | 984 | ₹9,840 |
| 4 | Part - B Earth Work | - | - | - | - |
| 5 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | CUM | 25 | - |
| 6 | Construction of Embankment with Material Obtained from Roadway Cutting. Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | - | CUM | 34 | - |
| 7 | Part - C Base Course | - | - | - | - |
| 8 | Granular Sub-base with Well Graded Material (Table 400-1)By Mix in Place Method.Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading III Material | 442.87 | Cum | 707 | ₹3,13,107.32 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rollingwith smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & bindingmaterials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. Using Crusher Broken Aggregate. By Mechanical Means. | 179.78 | Cum | 1,016 | ₹1,82,656.48 |
| 10 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate.By Mechanical Means | 179.78 | Cum | 1,156 | ₹2,07,825.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.58 MB
BOQ_953623.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .