Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-Finance | ₹9.0 L | L1 | Accepted-Finance Selected |
| 2 | Not Admitted-Fee/PreQual/Technical 158 RAKSA SHIVPURI ROAD JHANSI RAKSA JHANSI JHANSI JHANSI UTTAR PRADESH 284419 | JHANSI | UTTAR PRADESH | 284419 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Admitted. Due to non submission of experience certificate or MoU as per NIT condition |
Tender Value
₹11.0 L
EMD Value
₹22,097
Closing Date
12 Aug 2026, 12:00 pmClosed
Executive Engineer (E)
O/o EE(E) PWD EMD M-351, R.No.185, Old Sectt Delhi
RMO E and M Services at Delhi Vidhan Sabha, Old Sectt., Delhi (SH- Providing and Fixing PCU for existing Sustainable Power Generation).
2026_PWD_296604_1
40/2026-27/EMD M-351/EE(E)
Open Tender
Electrical Works
Percentage
7 days
Delhi Vidhan Sabha
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹22,097
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1POWER CONDITIONING UNIT (PCU) | |||||
| 1.01 | Supply, Installation, Testing and Commissioning of Solar Edge make Power Conditioning Unit (PCU) / Central Control Inverter to be connected & integrated with existing Solar Edge invertors setup, power optimizer, proper serial number pairing, synchronizations with existing synergy units for smooth and safe operation complete and A combination of 50 kW and 100 KW central control inverters shall be provided suitable for working with power optimizers to convert the DC power generated by the solar PV modules into AC power. The inverters shall be grid-interactive, enabling seamless integration with the utility grid. The Power Conditioning Units (PCUs) shall be equipped with Maximum Power Point Tracking (MPPT) technology to ensure maximum energy harvest from the solar modules. The PCUs, including the MPPT and protection systems, shall conform to IEC 61683 / IS 61683, IEC 60068-2 (Parts 1, 2, 14, and 30), or equivalent BIS standards. The output parameters of the PCUs shall be fully compatible with the local grid voltage and frequency requirements. For Solar installation, the central control inverters shall be integrated with module-level power optimizers to enhance performance, enable module-level monitoring, and reduce mismatch losses across the array. | - | - | - | - |
| 1.02 | Typical Technical features of the inverter shall be as follows:- | - | - | - | - |
| 1.03 | DC Array Input Operating Voltage : -20% to +15% of the DC Array input voltage. | - | - | - | - |
| 1.04 | Type of Solar Charge Controller : MPPT based | - | - | - | - |
| 1.05 | Switching Device : MOSFET/ IGBT based | - | - | - | - |
| 1.06 | Output Wave Form : Pure Sine Wave | - | - | - | - |
| 1.07 | Total Harmonic Distortion : < 3% with resistive load | - | - | - | - |
| 1.08 | Output Voltage : 400 +/- 3% | - | - | - | - |
| 1.09 | Output Frequency : 50 Hz +/- 0.5 Hz | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
40TenderNotice.pdf
Tender Documents • 2.32 MB
BOQ_394889.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .