| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.3 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹26.5 L+₹15,424.35 (0.59%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹29.1 L+₹2.7 L (10.4%)Rejected-Finance 182 INDRA COLONY VILL DAMODARPURA POST TODABHATA TEA BASSI BASSI JAIPUR JAIPUR RAJASTHAN 303301 | JAIPUR | RAJASTHAN | 303301 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹29.4 L+₹3.1 L (11.6%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹30.0 L+₹3.6 L (13.8%)Rejected-Finance SHOP NO 48 KHARAR ALIPUR ALIPUR HISAR HARYANA 125044 | HISAR | HISAR | HARYANA | 125044 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S KAVITA CONSTRUCTION L6 | Balaji Construction Co. L3 | Siya constructions L10 | SITA RAM AND SONS L7 | malik constructions L2 | LACHHMAN SINGH AND BROTHERS L8 | M/s Rao Constructions, 1173 Urban Estate-II, Hisar L4 | Deepak contractor L1 | M/S SM BUILDER CO L5 | K P BUILDERS L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15CM dep getting out in soft /loose soil including clearing away all grass and vegetation saplings , shrubs , bushes , undergrowth roots and removing rubbish upto a distance n exc 50 mtrs outside the periphery of the any installation/ feeder pillar area etc.
Note:-The contractor will ensure that no vegetation grows during the contract period on the area so dressed. | 470 | Sqm | 50 ₹23,500 | 15 ₹7,050 | 20 ₹9,400 | 55 ₹25,850 | 10 ₹4,700 Lowest | 12 ₹5,640 | 40 ₹18,800 | 20 ₹9,400 | 12 ₹5,640 | 100 ₹47,000 |
| 2.00 | Excavation over areas not exc 1.5 mtr in depth and getting out soft/loose soil all as specified. | 188 | Cum | 180 ₹33,840 | 120 ₹22,560 | 135 ₹25,380 | 55 ₹10,340 Lowest | 80 ₹15,040 | 100 ₹18,800 | 200 ₹37,600 | 90 ₹16,920 | 100 ₹18,800 | 120 ₹22,560 |
| 3.00 | Excavation in trenches in soft/loose/hard/dense soil n exc 1.50 meter wide and n exc 1.50 meter in depth for foundation of pole, laying cable etc and getting out etc complete all as specified and directed. | 5.06 | Cum | 120 ₹607.2 | 100 ₹506 | 145 ₹733.7 | 185 ₹936.1 | 100 ₹506 | 100 ₹506 | 200 ₹1,012 | 90 ₹455.4 Lowest | 120 ₹607.2 | 100 ₹506 |
| 4.00 | Returning, filling in including spreading, leveling, watering and well ramming in layers n exc 25 cm thick etc complete all as specified and directed. | 0.2 | Cum | 80 ₹16 | 40 ₹8 Lowest | 45 ₹9 | 185 ₹37 | 50 ₹10 | 100 ₹20 | 200 ₹40 | 100 ₹20 | 190 ₹38 | 100 ₹20 |
| 5.00 | Removing excavated surplus soil exc 50 mtr and depositing where directed at a level n,exc 1.5 mtr above the starting point complete all as specified and directed by Engr in Charge. | 454.87 | Cum | 90 ₹40,938.3 | 10 ₹4,548.7 Lowest | 45 ₹20,469.15 | 55 ₹25,017.85 | 50 ₹22,743.5 | 50 ₹22,743.5 | 80 ₹36,389.6 | 25 ₹11,371.75 | 50 ₹22,743.5 | 100 ₹45,487 |
| 6.00 | Rolling and consolidating formation surfaces with 8 to 10 tonne power roller complete all as specified and directed by Engr in Charge. | 47 | X Sqm | 1,000 ₹47,000 | 400 ₹18,800 | 155 ₹7,285 | 100 ₹4,700 | 700 ₹32,900 | 50 ₹2,350 | 200 ₹9,400 | 10 ₹470 Lowest | 150 ₹7,050 | 250 ₹11,750 |
| 7.00 | M&L for 150mm thick (spread thickness) soling with broken boulders or quarried stone of guage 100mm to 150mm, spread and levelled in layers, interstices filled surface formed and rolled with 8 to 10 tonne power roller complete all as specified and directed by Engr in Charge. | 47 | X Sqm | 2,000 ₹94,000 | 1,800 ₹84,600 | 3,277 ₹1,54,019 | 2,000 ₹94,000 | 1,800 ₹84,600 | 2,600 ₹1,22,200 | 200 ₹9,400 Lowest | 246 ₹11,562 | 2,000 ₹94,000 | 2,250 ₹1,05,750 |
| 8.00 | M&L for Plain cement Concrete 1:2:4 type B2 using 40mm graded stone aggregate as sub base 100mm thick complete all as specified and directed by Engr in Charge. | 470 | Sqm | 400 ₹1,88,000 | 240 ₹1,12,800 | 325 ₹1,52,750 | 475 ₹2,23,250 | 150 ₹70,500 Lowest | 400 ₹1,88,000 | 350 ₹1,64,500 | 290 ₹1,36,300 | 550 ₹2,58,500 | 510 ₹2,39,700 |
| 9.00 | M&L for Stone sett flooring with stone setts of size 200 to 250mm long, 150 to 200mm wide and 150mm deep and side dressed; bedded in cement mortor 1:3, joints 20mm thick, grouted cement in cement mortor 1:2 with an admixture of metallic floor hardner 5 by weight of cement and struck flush complete all as specified. | 470 | Sqm | 2,000 ₹9,40,000 | 2,000 ₹9,40,000 | 1,700 ₹7,99,000 | 1,800 ₹8,46,000 | 1,600 ₹7,52,000 | 2,000 ₹9,40,000 | 1,500 ₹7,05,000 | 950 ₹4,46,500 Lowest | 1,600 ₹7,52,000 | 1,650 ₹7,75,500 |
| 10.00 | M&L for Edge stones to flooring with stone setts of size 250 to 300mm long x 150 to 200mm wide and 450mm deep and ditto all as per item no here in before complete all as specified. | 39 | Sqm | 2,000 ₹78,000 | 2,200 ₹85,800 | 2,000 ₹78,000 | 1,800 ₹70,200 | 2,000 ₹78,000 | 4,000 ₹1,56,000 | 1,800 ₹70,200 | 1,020 ₹39,780 Lowest | 1,600 ₹62,400 | 1,560 ₹60,840 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
23 Sept 2025, 6:00 pmClosed
GE HISAR
GE HISAR
PROVN OF A VEHICLE SHED WITH STONE BED FLOORING AT 291 ARMD WKSP AT HISAR MIL STN UNDER GE HISAR
2025_MES_727410_1
GE(H)-32/2025-26
Open Tender
Civil Works
Item Rate
210 days
GE HISAR
As per NIT
6 documents required · 6 mandatory
₹500
GE HISAR
₹76,000
Yes
22 Nov 2025
23 Aug 2025
1 Oct 2025
23 Aug 2025
23 Sept 2025
8 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .