Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
29 Sept 2026, 11:00 am2d left
EE(BR V)
22 SURYA SEN STREET KOL-12
REPAIRING OF FOOTPATH AT STRAND ROAD (EASTERN SIDE) IN WARD NO 045
2026_KMC_1042511_1
KMC/EE(C)/Br-V/045/15/26-27
Open Tender
CIVIL WORKS
Percentage
90 days
WARD-45
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹6,000
19 Sept 2026
19 Sept 2026
1 Oct 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.4 | %M3 | 11,927 | ₹4,770.8 |
| 2 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 243.28 | SQM | 24 | ₹5,838.72 |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 18.25 | M3 | 6,216 | ₹1,13,442 |
| 4 | (B) SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENT (ICBP) WITH CONCRETE BLOCKS (WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE I OF IS 15658 : 2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURER, WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF A PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS, AS PER CL. NO. 3.26OF IS: 15658) AND OF SPECIFIC SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK, AS PER CL. NO. 3.3 OF IS: 15658) AS PER TABLE 2 OF IS :15658 WITH FLEXURAL STRENGTH / BRAKING LOAD AS PER ANNEXURE G OF IS:15658, ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP 63 (2018) OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED BEDDING SAND OF 25-35 MM THICK (GRADING OF THE BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP-63) AND FILLING UP THE GAP IN BETWEEN PAVER BLOCK WITH JOINT FILLING SAND (THE GRADING OF THE JOINT FILLING SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP 63) AND COMPLETING THE EDGES WITH CUT BLOCKS AS PER CL. NO. 8.7 OF IRC SP 63(1018) WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND, COMPACTION, LEVELLING AND FILLING UP OF THE EDGE GAP. 50MM THICK (II) COLOURED DECORATIVE) | 21.58 | SQM | 875 | ₹18,882.5 |
| 5 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete | 339.56 | SQM | 124 | ₹42,105.44 |
| 6 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 18) Stone set pavement with the joints set close in cement mortar (1:6) excluding the cost of stone sets but including the cost of carriage thereof within a lead of 150 m. (i) When laid with a cushion of sand below (including cost thereof). (a) 100 mm thick pavement | 135.37 | SQM | 59 | ₹7,986.83 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 239.5 | MTR | 8.17 | ₹1,956.72 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 115.5 | MTR | 8.17 | ₹943.64 |
| 9 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath) | 30 | EA | 292.48 | ₹8,774.4 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 6.94 | M3 | 4,761 | ₹33,041.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 0.22 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2558765.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .