Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹44,406
Closing Date
5 May 2026, 3:00 pmClosed
Chief Engineer
Nagar Nigam, Motijheel Kanpur
Constructino of Pathway and Horticulture in Shiv Shakti Park Situated in ward 09 Zone-5.
2026_NNKAN_1144766_1
471/UDYAN/2024-25
Open Tender
Civil Works
Fixed-rate
45 days
Tatya tope Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹44,406
14 May 2026
4 May 2026
5 May 2026
4 May 2026
5 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loam clay or sand) including lift up to | 18.2 | Cum | 174 | ₹3,166.8 |
| 2 | Providing and Laying Cement concrete (1:6:12, 1cement: 6 coarse sand: 12 Brick ballast nominal size 40 mm ) in all completion of work. In foundation and floor . | 5 | Cum | 4,380 | ₹21,900 |
| 3 | Class-150 brick work in 1:4 cement and corse sand mortar of 1.25 fineless modulus mortar in foundation and plinth including supply of all materials, labour, tools & plants etc, required for proper completion of work. | 9.5 | Cum | 6,600 | ₹62,700 |
| 4 | Providing and laying of stone ballast with stone dust including water allowance for proper consolidation with hand ramming including labour T&P etc all complete. | 8.5 | Cum | 2,100 | ₹17,850 |
| 5 | providing And laying Checkered terrazo tiles 20mm averege thick marbal chips of size up to 6mm .in floorson 25 mm thick bed of morter1:1:1 etc all complete. | 156 | Sqm | 860 | ₹1,34,160 |
| 6 | 12mm thick cement plaster in single coat on fair side in 1:4 cement, fine sand etc all complete. | 16 | Sqm | 182 | ₹2,912 |
| 7 | Devlopment of lawn by doubling slection no-1 Grass incl. All complition of work. | 352 | Sqm | 138.72 | ₹48,829.44 |
| 8 | Development of hedge bed Digging 0.45 mtr wide Supply and mixing of manure with soil in 1:1 Ratio Also Supply and planting of Muraya exotica plants incuding all Comlete of work. | 176 | Rmt | 146.77 | ₹25,831.52 |
| 9 | Maintinance (1 year) Work of Hedge including all Complition of work | 176 | Rmt | 123.95 | ₹21,815.2 |
| 10 | Maintinance (1year)Work of Lawn including all Complition of work | 352 | Sqm | 41.63 | ₹14,653.76 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2139181.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .