| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.0 LAccepted-Finance | 1 | Accepted-Finance LQ | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-high quatation |
| Sl No | Description | Qty | Unit | RAMKUMAR K L1 |
|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 291.84 | m3 | 246 ₹71,792.64 Lowest |
| 2.00 | Supplying and M.sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 47.48 | m3 | 2,036 ₹96,669.28 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using M.Sand 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 71.12 | m3 | 5,830 ₹4,14,629.6 Lowest |
| 4.00 | Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers | 958.4 | sqm | 490 ₹4,69,616 Lowest |
| 5.00 | Cement concrete 1:3:6 mix Using M.Sand 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 126.07 | m3 | 6,520 ₹8,21,976.4 Lowest |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.07 | m3 | 89,942 ₹6,295.94 Lowest |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.93 | m3 | 9,586 ₹18,500.98 Lowest |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
26 Jun 2025, 3:00 pmClosed
Executive officer
Executive officer Lalpettai town Panchayat
CONSTRUCTION OF CC DRAINAGE AT THAYUP NAGAR IN LALPETTAI TOWN PANCHAYAT
2025_DTP_568762_1
A1/78/2025
Open Tender
Civil Works - Others
Works
45 days
Lalpettai Town Panchayat
As Per Tender
3 documents required · 3 mandatory
₹0
₹19,000
9 Sept 2025
14 Jun 2025
26 Jun 2025
14 Jun 2025
26 Jun 2025
14 Jun 2025
14 Jun 2025 - 26 Jun 2025
Amount
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and M.sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using M.Sand 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers
Cement concrete 1:3:6 mix Using M.Sand 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .