Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC 1061 MAIN ROAD KATHARA P O KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC OK | |
| 2 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical Higher Rate | |
| 3 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical Higher Rate | |
| 4 | Rejected-Technical AT COLONY NO 02 KATHARA KATHARA PO KATHARA DIST BOKARO 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Higher Rate | |
| 5 | Rejected-Technical 1552B JARANGDIH BERMO BOKARO JHARKHAND 829113 | BERMO | BOKARO | JHARKHAND | 829113 | - | Rejected-Technical Higher Rate |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
14 Jun 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer (ENM)
Jarangdih Colliery
Complete re-insulation / rewinding of 570KW 3.3KV 1480RPM Make Crompton Greaves SI No. 515(P) of pulorovan pump motor for water dewatering at Jarangdih Colliery Opencast mines.
2023_CCL_280956_1
JRD/PE/EnM/E.TEN/23-24/23, Dt.05.06.2023
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
JARANGDIH COLLIERY
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,700
25 Aug 2023
6 Jun 2023
15 Jun 2023
6 Jun 2023
14 Jun 2023
6 Jun 2023
6 Jun 2023 - 10 Jun 2023
Amount
Double glass covering of old copper strip of 7.7Kg x 60 = 462 Kg.
Insulating materials of total copper cost 462 Kg.
Cost of moulding HT insulation DG coating with nomex glass mica as required for coil
Labour Charge of copper wire.
Providing of connection terminal block set 3.3KV
Contractor Profit
Total impact of GST for the purpose of CTC
CENTRAL ENGINEERS
coalfields engineering works
M/S TIGER ENTERPRISES
M/S PERFECT ELECTRICAL WORKS
stage.html
html • 0.04 MB
techsummary_290879.pdf
PDF • 4.07 MB
finsummary_290879.pdf
PDF • 4.07 MB
NIT23.pdf
PDF • 4.07 MB
finance_290879.pdf
PDF • 0.41 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .