Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L1 | Accepted-AOC OK | |
| 2 | L2₹28.2 L+₹5.4 L (23.9%)Rejected-Finance RZ A2 2 CHANAKYA PLACE PART I OPP C 1A BLOCK JANAK PURI NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹37.3 L+₹14.5 L (63.8%)Rejected-Finance | L3 | Rejected-Finance Other than lowest tenderer |
Tender Value
Refer Docs
EMD Value
₹99,900
Closing Date
22 Sept 2020, 6:00 pmClosed
GE E/M BASE HOSPITAL DELHI CANTT
GE E/M Base Hospital Delhi Cantt-10
REPAIR/ MAINT OF DX TYPE CENTRAL AC PLANT AND CONNECTED E/M WORKS AT BASE HOSPITAL UNDER GE E/M BASE HOSPITAL DELHI CANTT-10
2020_MES_371836_1
GE/BH-38/2020-21
Open Tender
Electrical and Maintenance Works
Works
334 days
GE E/M BASE HOSPITAL DELHI CANTT
Class D Category c(i)
7 documents required · 7 mandatory
₹500
GE E/M Base Hospital Delhi Cantt
₹99,900
Yes
26 Nov 2020
25 Aug 2020
24 Sept 2020
25 Aug 2020
22 Sept 2020
9 Sept 2020
Amount
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor of model:- SMC/4/65, Make:- Accel (R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning with detergent & cotton waste, changing of compressor oil etc and cleaning the suction filter, oil filter, replacing the defective parts and making compete system functional for safe guard the gas with self pumping down system or with total recovery unit system including following operation complete all as specified & directed:- (i) Charging of Nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure / leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R - 22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi. (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temperature as required at site. (v) Testing & commissioning of compressor after completion. Record of all testing shall be prepared & kept in safe custody of Engineer-in-Charge for future reference. Notes :- (a) Spare parts of compressor, required to be replaced, shall be measured and paid separately as "Supply only" under respective item of this schedule (Srl Item Nos 1.01 to1.22). However, cost of labour shall deemed to be included in quoted rate for this item. (b) Any minor items required for overhauling except described here -in - after shall be supplied by the contractor without any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates. If any dispute regirding any item is minor/Major, the dision of Accepting Officer is final & binding.
Supply only in replacement PISTON with PIN & Rings (ACCEL Part No. ASL6018R) complete all as specified and directed.
Supply only in replacement CYLLINDER with suction valve (R-22) (ACCEL Part No. ASL6019A) complete all as specified and directed.
Supply only in replacement OIL pump (ACCEL Part No. ASL6011A) complete all as specified and directed.
Supply only in replacement Discharge valve assembly (R-22) (ACCEL Part No. ASL6020 A) complete all as specified and directed.
Supply only in replacement Oil pressure regulation valve (ACCEL Part No. ASL6022 R) complete all as specified and directed.
Supply only in replacement Set of gasket (ACCEL Part No. ASL6453) complete all as specified and directed.
Supply only in replacement Set of neoprene ' O' RINGS (ACCEL Part No. ASL6454) complete all as specified and directed.
Supply only in replacement Set of Dowty ring (ACCEL Part No. ASL6455) complete all as specified and directed.
Supply only in replacement Set of SEALING RING (ACCEL Part No. ASL6456) complete all as specified and directed.
Supply only in replacement SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and directed.
Supply only in replacement HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed.
Supply only in replacement BEARING WITH BUSHING STD (ACCEL Part No. C-03) complete all as specified and directed.
Supply only in replacement DOWEL FOR BUSHING COLLAR (ACCEL Part No. C-17) complete all as specified and directed.
Supply only in replacement CONNECTING ROD ASSEMBLY (ACCEL Part No. ASL6017 A) complete all as specified and directed.
Supply only in replacement OIL STRAINER (ACCEL Part No. ASL6033 A) complete all as specified and directed.
Supply only in replacement CRANKSHAFT - FOR SMC/4/65 (ACCEL Part No. ASL6416 A) complete all as specified and directed.
supply only in replacement SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-65) complete all as specified and directed.
Supply only in replacement UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL6012A-1) complete all as specified and directed.
Supply only in replacement UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL6012A-2) complete all as specified and directed.
Supply only in replacement SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL6010 R) complete all as specified and directed.
Supply only in replacement SUCTION STOP VALVE ASSEMBLY (ACCEL Part No. ASL6025 A) complete all as specified and directed.
Supply only in replacement DISCHARGE STOP VALVE ASSEMBLY (ACCEL Part No. ASL6026 A) complete all as specified and directed.
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor of Model:- SMC/4/100, Make:- Accel (R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning with detergent & cotton waste, changing of compressor oil etc and cleaning the suction filter , oil filter, replacing the defective parts and making compete system functional for safe guard the gas with self pumping down system or with total recovery unit system including following operation complete all as specified & directed: - (i) Charging of nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure / leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R - 22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi. (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temperature as required at site. (v) Testing & commissioning of compressor after completion. Record of all testing shall be prepared & kept in safe custody of Engineer-in-Charge for future reference. Notes :- (a) Spare parts of compressor, required to be replaced, shall be measured and paid separately as "Supply only" under respective item of this schedule (Srl Item Nos 2.01 to 2.20). However, cost of labour shall deemed to be included in quoted rate for this item. (b) Any minor items required for overhauling except described here -in - after shall be supplied by the contractor without any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates. If any dispute regirding any item is minor/Major, the dision of Accepting Officer is final & binding.
Supply only in replacement PISTON with PIN & Rings (ACCEL Part No. ASL1018R) complete all as specified and directed.
Supply only in replacement CYLLENDER with suction valve (R-22) (ACCEL Part No. ASL1019A) complete all as specified and directed.
Supply only in replacement OIL pump (ACCEL Part No. ASL1011A) complete all as specified and directed.
Supply only in replacement Discharge valve assembly(R-22) (ACCEL Part No. ASL1020 A) complete all as specified and directed.
Supply only in replacement Oil pressure regulation valve (ACCEL Part No. ASL1022 R) complete all as specified and directed.
Supply only in replacement Set of gasket (ACCEL Part No. ASL1453) complete all as specified and directed.
Supply only in replacement Set of neoprene 'O' RINGS (ACCEL Part No. ASL1454) complete all as specified and directed.
Supply only in replacement Set of Dowty ring (ACCEL Part No. ASL1455) complete all as specified and directed.
Supply only in replacement Set of SEALING RING (ACCEL Part No. ASL1456) complete all as specified and directed.
Supply only in replacement SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and directed.
Supply only in replacement HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed.
Supply only in replacement BEARING WITH BUSHING STD (ACCEL Part No. C-03) complete all as specified and directed.
Supply only in replacement CONNECTING ROD ASSEMBLY (ACCEL Part No. ASL1017 A) complete all as specified and directed.
Supply only in replacement OIL STRAINER (ACCEL Part No. ASL1033 A) complete all as specified and directed.
Supply only in replacement CRANKSHAFT - FOR SMC/4/100 (ACCEL Part No. ASL1416 A) complete all as specified and directed.
Supply only in replacement SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-100) complete all as specified and directed.
Supply only in replacement UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL1012A-1) complete all as specified and directed.
Supply only in replacement ULOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL1012A-2) complete all as specified and directed.
Supply only in replacement SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL1010 R) complete all as specified and directed.
Supply only in replacement BUSHING FOR PISTON PIN (ACCEL Part No. E-07) complete all as specified and directed.
M&L for taking out Cooling Tower Motor of following capacity, opening the motor, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding wire of size & description to match with the existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed:-
2 HP Cooling Tower Motor
3 HP Cooling Tower Motor
5 HP Cooling Tower Motor
M&L for repairing /servicing AHU Fan Motor of following capacity, opening the motor, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding wire of size & description to match with existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed :-
5 HP/ 5.5 HP AHU fan Motor.
7.5 HP AHU fan Motor.
10 HP AHU fan Motor.
S & F in repair oil pressure cut out for ACCEL MAKE compressor of central type AC plant of any capacity complete all as specified and directed. Make: Sporlene/ Danfoss/ Emerson (Accel part No. V-11)
S & F in repair high pressure cut out for Accel make compressor of central type AC plant of any capacity complete all as specified and directed. Make: Sporlene/ Danfoss/ Emerson (Accel part No. V-13)
S & F in repair low pressure cut out for Accel make compressor of central type AC plant of any capacity complete all as specified and directed. Make: Sporlene/ Danfoss/ Emerson (Accel part No. V-12)
S & F in repair low pressure gauge/oil pressure gauge for Accel make compressor of central type AC plant of any capacity complete all as specified and directed. Make: Sporlene/ Danfoss/ Emerson (Accel part No. V-03)
S & F in repair high pressure gauge for Accel make compressor of central type AC plant of any capacity complete all as specified and directed. Make: Sporlene/ Danfoss/ Emerson (Accel part No. V-04)
S & F in repair three way solenoid valve suitable for Accel make compressor (Model-SMC/4/65 and SMC/4/100) central type AC plant of any capacity complete all as specified and directed. Make of Solenoid valve: Accel cat part No.U-1N or equivalent model of Sporlene/ Danfoss/ Emerson
S&F in repair CT Fan complete section Fan, Fan Dia -1400 mm including all connected GI nut bolts, accessories and all fitting suitable for 90 TR cooling tower of Model-5061, Make-Delta complete all as specified & directed. FAN Make:- Kruger / Nicotra / Delta
S&F in repair CT Fan complete section Fan, Fan Dia -900 mm including connected GI nut bolts, accessories and all fitting suitable for 35 TR cooling tower of Model-5032, Make- Delta complete all as specified & directed. FAN Make:- Kruger / Nicotra / Delta
S & F in repair Expansion valve of following capacity for central type AC plant (R-22) complete all as specified and directed: -
Expansion valve for plant capacity 12/12.5 TR. Make : Danfoss / Emerson / Sporlane
Expansion valve for plant capacity 30 TR (Cat part No. 107E of Make Sporlane or Equivalent Model of Danfoss/ Emerson)
Expansion valve for plant capacity 40 TR (Cat part No. 107E of Make Sporlane or Equivalent Model of Danfoss/ Emerson)
M&L for repairing /servicing Condenser or Chiller pump (Centrifugal pump) of following capacities by disconnecting the pump from motor, opening for inspection, replacing the worn out parts like gland bush, bearings, gland bolts and nuts, gland packing, gasket, water seal etc including repairing to pump shaft by remetalling, grinding, polishing and reassembling complete pump & refixing in same position & connecting including replacing the rusted nuts, bolts, washers etc and testing and commissioning including loading/unloading and transportation to & from authorised workshop complete all as specified and directed: -
Condenser or Chiller Pump of capacity 5 HP, Head Range - 6 to 38M.
Condenser or Chiller Pump of capacity 10 HP, Head Range - 6 to 38M.
M & L in replacement rewinding the motor of Chiller pump (Centrifugal pump) of following capacities with new super enamelled copper winding wire of size & description to match with existing including insulating materials, varnishing and drying, reassembling including cutting & removing old burnt winding wire complete all as specified & directed: -
Condenser or Chiller Pump of capacity 5 HP, Head Range - 6 to 38M.
Condenser or Chiller Pump of capacity 10 HP, Head Range - 6 to 38M.
S&F in repair condenser or cooling tower piping of MS 'C' class of following sizes, confirming to IS-1239 and IS- 3589 (Both revised till date) complete with bends, reducers tees, supports vibration pipe supports etc including painting with 2 coats of synthetic enamel paint over a coat of red oxide primer complete all as per specified & directed: -
40 mm internal dia
50 mm internal dia
65 mm internal dia
80 mm internal dia
100 mm internal dia
125 mm internal dia
150mm internal dia
Supply & charging/Top up refrigerant Gas R-22 complete all as per specified & directed. (Make:- Mafron/Freon/Floron)
M & L in replacement under deck insulation for metal roof with bonded fibre glass wool of density 24 Kg/Cum, 50 mm thick, suitably factory laminated with aluminium foil backed up by scrim and Kraft paper (FSK), facing with 50 mm projection for overlap and butting in following operations complete all as directed and specified :- (a) S&F in replacement 6 mm dia M S rods between purlins suitably for supporting the required thickness of insulation material beneath the metal roof. (b) S&F in replacement 22 SWG GI/Aluminium wires supports for insulation. (c) S&F in replacement chicken wire mesh 12.5 mm x 22 SWG of hexagonal construction below the insulation for supporting the same. (d) S&F in replacement under deck insulation with bonded fibre glass wool of density 24 Kg/Cum, 50 mm thick, suitably factory laminated with aluminium foil backed up by scrim and Kraft paper (FSK), facing with 50 mm projection for overlap and butting Note: - Insulating material shall conform to BS - 476, Part 4,5, 6 & 7.
S & F in repair fully automatic star delta starter suitable for 3 phase, 415V, 15 HP rating induction motor, containing Electric over current protection relay range 0.5 to 30 Amp with external CT 960 Amp, AC-3, 25 Amp rating contractor and back up protection HRC fuse of suitable rating etc complete all as specified and directed. Make: BCH Cat No.- NASKALEN or equivalent Model of L&T/ SIEMENS /ABB
S&F in repair single phase preventer Minilec VSP suitable for 3 phase supply 415 Volt complete all as specified and directed. Make:- SIEMENS / L&T/ BCH/ C&S
S&F in repair 3 pole, ML3 contactor, 415 volt including NO or NC AUXILIARY contacts including connecting complete all as specified and directed. Make:- SIEMENS / L&T / BCH/C&S
S&F in repair 3 pole power contactor 415 V, type MNX 25 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete all as specified and directed. Make SIEMENS / L&T / BCH /C&S
S&F in repair 3 pole power contactor 415 V, type MNX 18 including NO or NC auxiliary contact BLOCK , Coil voltage 230 V, 50 Hz including connecting complete all as specified and directed. Make SIEMENS / L&T / BCH/C&S
S&F in repair 4 pole power contactor 415 V, type MNX 12 , 3 pole including NO or NC auxiliary contact Block, Coil voltage 230 V, 50 HZ including connecting complete all as specified and directed. Make SIEMENS / L&T / BCH/C&S
S&F in repair 3 pole power contactor 415 V, type MNX 32 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete all as specified and directed. Make SIEMENS / L&T / BCH/C&S
S&F in repair 3 pole, ML2 contactor including NO or NC AUXILIARY contacts, including connecting complete all as specified and directed. Make:- SIEMENS / L&T / BCH/C&S
S&F in repair 3 pole, ML6 contactor, 415 Volt including NO or NC AUXILIARY contacts, including connecting complete all as specified and directed. Make:- SIEMENS / L&T / BCH/C&S
M&L for descaling of condenser tube of central AC plant of capacity 3 x 12 TR by disconnecting the condenser from the system, cleaning by descaling pump of suitable capacity of 110 ' feet head using descaling solution including cleaning condenser tube by nylon brush & MS rod of suitable size, replacement of rubber joints and unserviceable nut bolts complete all as specified and directed. (Notes :- (i) Necessary T&P such as pump, tube , descaling solution etc shall be arranged by the contractor. (ii) Descalling of all condensers in one AC plant shall be considered as one job)
All as per Items No 28.00 here-in-before but 3X12.5TR AC plant complete all as specified and directed.
All as per Items No 28.00 here-in-before but 3X40TR AC plant complete all as specified and directed.
All as per Items No 28.00 here-in-before but 3X30TR AC plant complete all as specified and directed.
S&F in repairs fan belt of Size B-81 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-72 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-68 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-76 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-98 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size C-108 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-70 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-60 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size A-62 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-85 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F in repairs fan belt of Size B-108/110 complete all as specified and directed. Make : Eco Drive/ Dunlop /Fenner
S&F CI sluice valve of size 100 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable sluice valve complete all as specified and directed.
S&F CI butterfly valve of size 100 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F CI butterfly valve of size 80 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F CI butterfly valve of size 65 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F CI butterfly valve of size 50 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F in repair 50mm thick box type Pre-Filter (EU-4) Synthetic media type flange type (non woven type ) efficiency - 90% down to 10 micron with all fitting for AHU and 50 mm wg static pressure with rod support fabrication with GI/Aluminium frame, suitable for AHU of Make: Fedders Lloyd complete all as specified & directed. MAKE for filter :- Athlete/ AAF/ Freudenberg
S&F CI strainer of size 100 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F CI strainer of size 80 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
S&F CI strainer of size 50 mm dia including cutting welding of pipe up to required size with flange joints including taking down the existing unserviceable butterfly valve complete all as specified and directed.
Attending complaint of control panel wiring of AC plant and making it fully serviceable with and including all size of wires, thimble, PVC, Bakelite, connection plate, Nut bolt, MCB, Indicator Lamp, NO, NC block and other items complete all as specified and directed. Notes: - After intimation of breakdown by Engineer in Charge/JE E&M through telephone or verbally, the contractor shall arrange the Mechanic to attend the complaint inside BHDC premises within 2 hours and make them functional. If contractor failed to attend complaint with in time frame, a penalty of Rs 400/- per Hrs per complaint shall imposed on contractor and shall be recovered from contractor's dues.
M&L for taking out compressor Motor (Capacity 20 HP, Make - Crompton/Siemens/ABB) of AC plant and Dismantling the motor with disconnecting the same from the compressor, removing rubber coupling & its connected accessories, opening the motor, loading, unloading & transporting to & from reputed work shop for rewinding, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding of size & description to match with existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Capacity 40 HP, Make - Kirloskar) of AC plant and Dismantling the motor with disconnecting the same from the compressor, removing rubber coupling & its connected accessories, opening the motor, loading, unloading & transporting to & from reputed work shop for rewinding, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding of size & description to match with existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Capacity 50 HP, Make - General Electric Power India) of AC plant and Dismantling the motor with disconnecting the same from the compressor, removing rubber coupling & its connected accessories, opening the motor, loading, unloading & transporting to & from reputed work shop for rewinding, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding of size & description to match with existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Capacity 15 HP) of AC plant and Dismantling the motor with disconnecting the same from the compressor, removing rubber coupling & its connected accessories, opening the motor, loading, unloading & transporting to & from reputed work shop for rewinding, cutting & removing old burnt winding wire, rewinding the motor with new super enamelled copper winding of size & description to match with existing including insulating materials, varnishing, drying, replacement of both driven end, non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
S&F in repair bimetallic thermal overload relay, 9 to 14 Amps complete as specified and directed. Make:-Siemens / L&T/BCH
S&F in repair bimetallic thermal overload relay, 13 to 21 Amps complete as specified and directed. Make:-Siemens / L&T/BCH
S&F in repair bimetallic thermal overload relay, 20 to 32 Amps complete as specified and directed. Make:-Siemens / L&T/BCH
S&F in repair bimetallic thermal overload relay, 28 to 42 Amps complete as specified and directed. Make:-Siemens / L&T/BCH
Supply, installation, testing and commissioning in replacement sprinkler assembly for cooling tower of following capacity complete all as specified and as directed. Make: Delta/Mihir/Universal: -
S&F in repair corrosion proof PVC Filling, inlet louvers, drift, PVC eliminators, PVC water distribution chamber and nozzles (self rotating sprinklers), GI nut bolt, float valve and all accessories/ fitting complete all as specified & directed. Note:- (a) Contractor shall ensure that the spray system shall be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower shall be operate according to the counter flow principle. (c) Specifications of existing Cooling tower for PVC filling are as under: - (i) Capacity - 90 TR (ii) Make/Model - Delta Model 5161 (iii) water Flow - 290 USGPM (iv) Water in - 97.5° F (v) Water out - 90° F (vi) Design wet bulb temp - 83° F (vii) Max approach for Cooling Tower - 5°F
S&F in repair corrosion proof PVC Filling, inlet louvers, drift, PVC eliminators, PVC water distribution chamber and nozzles (self rotating sprinklers), GI nut bolt, float valve and all accessories/ fitting complete all as specified & directed. Note:- (a) Contractor shall ensure that the spray system shall be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower shall be operate according to the counter flow principle. (c) Specifications of existing Cooling tower for PVC filling are as under: - (i) Capacity - 35 TR (ii) Make/Model - Delta Model 5132 (iii) water Flow - 125 USGPM (iv) Water in - 97.5° F (v) Water out - 90° F (vi) Design wet bulb temp - 83° F (vii) Max approach for Cooling Tower - 5°F
RUCHIKA ENGG.WORKS
ARE ESS ENGINEERING SERVICES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .