| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹9.0 L+₹25,952.73 (2.95%)Rejected-Finance | L2 | Rejected-Finance Being 2nd lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Does not fulfill the technical criteria |
| Sl No | Description | Qty | Unit | Naveen Verma L1 | parveen L2 |
|---|---|---|---|---|---|
| 1.00 | 5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required .The recovery of stones whether useful or not for 218.11(Two hundred eighteen point eleven) Cubic Meter in all cases at the rate of Rupees 300/-only (Rupees three hundred only per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the Public and Private property during the course of execution shall be the absolute responsibility of the Contractor which shall have to be duly compensated to him in all cases. | 2,981.97 | Per Cubic Metre | 220 ₹6,56,033.4 Lowest | 225 ₹6,70,943.25 |
| 2.00 | Removal of land slide in hilly area in ordinary rock not requiring blasting by mechanical emans including cutting and trimming of slops and disposal of cut material within all leads and lifts as per technical speification 302.3.5 and 1611 including entire carriage of materials in all leads and lifts as per direction of Engineer-in-Charge. | 1,840.48 | Per Cubic Metre | 121 ₹2,22,698.08 Lowest | 127 ₹2,33,740.96 |
Tender Value
₹8.9 L
EMD Value
₹17,800
Closing Date
11 Jan 2026, 6:00 pmClosed
Executive Engineer
Kumarsain Division HPPWD Kumarsain
Formation Cutting 5/7 mtrs wide road in Km 0/705 to 1/000 and Removal of Slips at various Rds in Km 0/015 to 0/705
2026_PWD_124991_1
PW-KMS-AB-NIT/2025-26-6893-94 dt 01.01.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Kumarsain
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹17,800
13 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
11 Jan 2026
5 Jan 2026
Amount
5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required .The recovery of stones whether useful or not for 218.11(Two hundred eighteen point eleven) Cubic Meter in all cases at the rate of Rupees 300/-only (Rupees three hundred only per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the Public and Private property during the course of execution shall be the absolute responsibility of the Contractor which shall have to be duly compensated to him in all cases.
Removal of land slide in hilly area in ordinary rock not requiring blasting by mechanical emans including cutting and trimming of slops and disposal of cut material within all leads and lifts as per technical speification 302.3.5 and 1611 including entire carriage of materials in all leads and lifts as per direction of Engineer-in-Charge.
parveen (BID ID -606945)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SBD.pdf
Tender Documents • 2.67 MB
BOQ_183975.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .