GE (AF) BANGALORE
Garrison Engineer (AF), Military Engineer Services, HQ Trg Comd, IAF Campus, Hebbal, Bangalore 560 006
SPECIAL REPAIRS TO UG SUMP, LIFT WELLS AND FIRE HYDRANT OH TANKS IN CERTAIN BUILDINGS AT CHAF BANGLAORE
2026_MES_785749_1
8582/E8
Open Tender
Civil Works
Item Rate
120 days
GE (AF) BANGALORE
AS PER NIT
5 documents required · 5 mandatory
₹500
GE (AF) BANGALORE
₹87,366
Yes
21 Aug 2026
21 Aug 2026
14 Sept 2026
21 Aug 2026
11 Sept 2026
4 Sept 2026
22 Aug 2026 - 29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding and backing of any thickness complete all as specified and as directed by Engr-in-charge. | 71.35 | Sqm | 100 | ₹7,135 |
| 2 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc., laid, bedded and jointed in cement mortar complete all as specified and as directed by Engr-in-charge. | 8.5 | 10 Sqm | 100 | ₹850 |
| 3 | Material and labour for non skid ceramic coloured tiles 7 to 8mm thick area of each tile exc 0.11 sqm but not exc 0.18 sqm, in floors etc., set and jointed in neat cement slurry and pointed in white or coloured cement to match laid over 15mm thick screed bed or bedding in CM 1:4 complete all as specified and as directed by Engr-in-charge. | 39.6 | Sqm | 100 | ₹3,960 |
| 4 | Material and labour for glazed ceramic tiles coloured of size 450x300x7mm/ 450x350x7mm thick as vertical sruface set and jointed in neat cement slurry and pointed in white or colour cement mixed with pigment to match the shade of the tiles with 10mm thick rendering of CM 1:4 for laying wall finishes complete all as specified and as directed by Engr-in-charge. | 95.23 | Sqm | 100 | ₹9,523 |
| 5 | Material and labour for machine cut kota stone slab flooring 20-25mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete including cutting and polishing of tiles over 20mm thick screed bed of CM 1:6 complete all as specified and as directed by Engr-in-charge. | 80 | Sqm | 100 | ₹8,000 |
| 6 | All as per item No.05 here-in-before but as in skirting with 10mm thick rendering of CM 1:4 for laying wall finishes complete all as specified and as directed by Engr-in-charge. | 5 | Sqm | 100 | ₹500 |
| 7 | Material and labour for 100mm thick PCC 1:2:4 type B1 (Using 40mm graded granite stone aggregate) in floorings complete all as specified and as directed by Engr-in-charge. | 600 | Sqm | 100 | ₹60,000 |
| 8 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc., complete all as specified and as directed by Engr-in-charge. | 600 | Sqm | 100 | ₹60,000 |
| 9 | Material and labour for brushing neat cement slurry with 3 Kg/sqm complete all as specified and as directed by Engr-in-charge. | 600 | Sqm | 100 | ₹60,000 |
| 10 | Material and labour for plain cement concrete 1:2:4 type B-1 (Using 20mm graded granite stone aggregate) cast in-situ in lintels upto 1.5m span, cills and other similar bands, plinth courses, parapets, copings, bed plates and the like including weathering, slightly rounded or chamfered angles and throating as directed including use and waste of form work complete all as specified and as directed by Engr-in-charge. | 1.7 | Cum | 100 | ₹170 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tenderdocuments8582.pdf
Additional Documents • 0.42 MB
BOQ_880504.xls
BOQ • 0.33 MB
SOC8582.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].