Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹5.0 LAccepted-Finance 604 401 | TIRUVANNAMALAI | TAMIL NADU | 604401 | ₹5.0 L | 2 | Accepted-Finance Less than Value |
| 2 | 1₹5.1 LRejected-Finance NO 82 72 SANNATHI STREET THIRUVOTHUR CHEYYAR TOWN THIRUVOTHUR CHEYYAR TALUK 604 407 | RANIPET | TAMIL NADU | 604407 | ₹5.1 L | 1 | Rejected-Finance More than value |
| Sl No | Description | Qty | Unit | Mughil Construction H1 | P Anbazhagan H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 39 | CUM | 170 ₹6,630 | 165 ₹6,435 |
| 2.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 28 | CUM | 5,200 ₹1.5 L | 5,178 ₹1.4 L |
| 3.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 22 | CUM | 6,950 ₹1.5 L | 6,932 ₹1.5 L |
| 4.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL | 12 | CUM | 8,800 ₹1.1 L | 8,760 ₹1.1 L |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 5 | sqm | 480 ₹2,400 | 479 ₹2,395 |
| 6.00 | Provision for G S T @ 18% | 1 | Nos | 74,363 ₹74,363 | 74,058 ₹74,058 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Commissioner Thiruvathipuram Municipality
Commissioner Thiruvathipuram Municipality
Providing Cement Concrete Road drain at in Ward 03 vinayakar Street at Thiruvathipuram Municipality
2026_MAWS_656010_1
883/2025/E1-2
Open Tender
Civil Works - Roads
Thiruvathipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
20 Feb 2026
12 Feb 2026
13 Feb 2026
12 Feb 2026
13 Feb 2026
12 Feb 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site and cost form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Provision for G S T @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_786644.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid