Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr | 1 | Accepted-AOC 83th TAC |
| 2 | 2₹1.3 Cr+₹1.1 L (0.82%)Rejected-Finance | ₹1.3 Cr+₹1.1 L (0.82%) | 2 | Rejected-Finance L2 |
Tender Value
₹1.3 Cr
EMD Value
₹76,482
Closing Date
22 Nov 2023, 2:00 pmClosed
AC/EO
ArulmiguThirucourtrallanatharSwamytempleCourtallam
Repair and Renovation of Temple Mandapams in Arulmigu Vanniappar Temple Alwarkurichi Tenkasi Taluk Tenkasi District
2023_HRCE_390234_1
3/2023-2024/02.11.2023
Open Tender
Civil Works - Others
Works
365 days
ArulmiguThirucourtrallanatharSwamytempleCourtallam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹76,482
19 Apr 2025
20 Nov 2023
22 Nov 2023
20 Nov 2023
22 Nov 2023
20 Nov 2023
Amount
Dismantling the existing hardard weathering course concrete including clearing away from the site etc., complete.(SI.No.36)
Removing the Existing cutstone member including numbering, wire charges for tools and plants, scaffolding for working in heights etc.complete.
a)Pavukal
b)Thanithun, Bothiyal
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except to rock requiring blasting but including shoring strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well consolidated and depositing the surplus earth within the compound with an initial lead of 10 metres and lift of 2 metres in places as shown by the departmental officers and clearing levelling the site etc complete complying with standard specification.
Supplying and filling in foundation, basement, with clean river sand in layers of not more than 150 mm thick well watered, rammed and consolidated etc. complete complying with standard specification
Cement concrete 1:5:10 (one cement five sand and Ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing, laying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton.( for Plinth Beam)
Cement concrete M20 Grade using graded machine broken granite stone jelly for all reinforced cement concrete works excluding cost of centering shuttering strutting and cost of reinforcement grill in position including Plasticzer cost of all materials and labour charges etc., complete (Foundation & Basement)
Random Rubble Masonry in Lime mortar 1:2 [one Lime and Two sand] using new hard granite stones including providing new bond stones wherever necessary including simultaneous flush pointing of the exposed surface above ground level with the same mortar and all incidential charges such as scaffolding, finishing and curing as directed by the departmental officers etc., complete complying with the standard specification.
Supplying fabricating and placing in position mild steel or ribbed for steel bar / rods for reinforcement grill for all RCC works including cost of steel and binding wire and labour charges for decoiling cutting binding and tying the grills etc complete complying with standard specification as directed by the departmental officers.
Supply of Cut stone for carrying out Garpagraham, Artha mandapam, Maha Mandapam, Thirumathil and other temple structure upto 10 feet length including cost of all materials and labour charges etc., complete
Cutstone flooring using cut stone slab 600 x 600 mm and not less than 100mm thick top three line dressed and pointing with Lime mortar 1:5 etc complete
Brick work in Lime mortar 1:2 using quality of second class Country bricks (one cement and Five sand) 8 3/4" x 4 1/2" x 2 3/4" for foundation and basement including curing etc complete complying with standard specification
Plastering the walls with Lime mortar 1:1.5 12mm thick including cost of all materials and labour charges etc., complete
Painting the two coats with approved quality of water based exterior emulsion paint including one priming coat cement plastered wall surface in all floors including cost of all materials, brushes, scaffolding charges etc.complete complying with standard specification and as directed by the departmental officers
Labour charges for Dressing of required faces consisting of Upapeedam, Adhistanam, pathavargam, Prashiram etc neatly Finishing complete
a)For Uthiram
b)For Pavukal
c)For Kabothagam &Pillar
d)For wall
e)For Pothiyal
f)For upa peedam
g)For Thani pothiyal
Refixing the cutstone members including alignment, hire charges for tools and plants, scaffolding for working in heights and fixing in correct position including cost and conveyance of all materials and labour charges etc., complete
a)For Pavukal
b)For Thaniuthiram & Pothiyal
Weathering course concrete using best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime, the proportion of brick jelly to lime being 32 to 12 ½ (No sand to be added) by volume and laid over the RCC roof slab in a single layer and consolidated to the finished thickness by beating the concrete with wooden beaters of approved pattern keeping the surface constantly wet by sprinkling lime jaggery water etc. complete complying with standard specifications
Finishing the top of roof with one course of approved first quality of new Machine Pressed tiles of size 200mm x 200mm x 20mm thick of approved quality laid in L.M. 1:2 (one Lime and two sand) 12mm thick mixed with water proofing compound conforming to Indian standard as approved by the departmental officers at 2% by weight of Lime used and the joints pointed neatly to full depth of tiles with the same mortar mixed with water proof compound and red oxide etc. complete complying with standard specification.
Dismantling the existing delayed brick work in Lime mortar including clearing away from the site etc., complete.(SI.No.14)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M CHINNA THAMBI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_464980.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .