Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.8 LAccepted-AOC 302 APOLLO ARCADE APOLLO ARCADE 7819 AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | L1 | Accepted-AOC L1 |
Tender Value
₹44.6 L
EMD Value
₹89,200
Closing Date
7 Feb 2022, 5:00 pmClosed
RAJA NAGENDER SINGH
NIRMAN SADAN , 4TH FLOOR, CIVIL LINES , PWD B and R (Elect.)GURUGRAM
Construction of Mini Sectt. Secretariat at Ballabgarh in Faridabad Distt. (Pdg. Lifts Only)
2021_HRY_198093_4
PWD (Elect.) Dec. 2021
Open Tender
Electrical Works
Works
90 days
XEN(E) Gurugram
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹89,200
19 Sept 2023
24 Jan 2022
8 Feb 2022
24 Jan 2022
7 Feb 2022
24 Jan 2022
Amount
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ SCHINDLER / HITACHI/ JOHNSON/ORBIS make suitable for 15/16 persons (as per manufacturer) (1088 kg. weight) having speed @ 1.5 meters per second to travel from ground + 2 upper floors with 3 stops, 3 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ SCHINDLER / HITACHI/ JOHNSON/ORBIS make suitable for 15/16 persons (as per manufacturer) (1088 kg. weight) having speed @ 1.5 meters per second to travel from ground + 1 upper floors with 2 stops, 2 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Supply , erection testing and commissioning of electric traction elevator of OTIS/KONE /MITUSUBISHI/ KINETIC HUNDAI/ SCHINDLER / HITACHI/ JOHNSON/ORBIS make suitable for 10 persons (680 kg. weight) having speed @ 1.5 meters per second to travel from ground + 2 upper floors with 3 stops, 3 opening as per technical specifications attached, upto the entire satisfaction of the Engineer-in-charge.
Annual Maintenance Charges for above said 3 nos. lifts after expiry of one year warrantee period complete with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-Charge of work. 1st Year (after one year guarantee period)
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .