| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAccepted-AOC 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹9.5 Cr | L1 | Accepted-AOC LOWEST RATE QUOTED |
| 2 | L2₹9.6 Cr+₹9.5 L (1.00%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹9.6 Cr+₹9.5 L (1.00%) | L2 | Rejected-Finance HIGHER THAN L1 |
| 3 | L3₹9.7 Cr+₹14.3 L (1.50%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹9.7 Cr+₹14.3 L (1.50%) | L3 | Rejected-Finance HIGHER THAN L1 |
| 4 | Rejected-Technical H NO 164 SECTOR 8 PANCHKULA 134109 | PANCHKULA | PANCHKULA | HARYANA | 134109 | - | - | Rejected-Technical REJECTED |
Tender Value
Refer Docs
EMD Value
₹18.7 L
Closing Date
3 Jul 2024, 2:00 pmClosed
SUPERINTENDING ENGINEER
81/2/7, PHEARS LANE, COMMERCIAL COMPLEX, 3RD FLOOR, KOLKATA-700012.
Providing and Installation of Gaseous Chlorination arrangement at the OHR sites for surface water based water supply scheme of Shyampur-1 and 2, Uluberia-1 and Part of Bagnan-1 and 2 block, District- Howrah under Electrical Division, PHE Dte.
2024_PHED_690208_1
01/SE/MC-I/WBPHED/2024-2025
Open Tender
MECHANICAL
Item Rate
365 days
HOWRAH
Please refer Tender documents.
6 documents required · 6 mandatory
₹18.7 L
4 Sept 2024
7 Jun 2024
5 Jul 2024
8 Jun 2024
3 Jul 2024
8 Jun 2024
Amount
Supply, delivery and storage at site of vacuum operated gaseous Chlorination system of capacity 0-1 kg/hr ( 2 sets ) along with all equipment, instrument and accessories pipes, 4 Nos. cylinder for Chlorine
Installation of above supplied chlorination unit at site, on wall as per IS:10553 (Part-I) 1983, Supplied chlorine cylinder should be- as per IS:7681-1975, alarming unit placed 300 mm above the floor follows all safety rules and regulations as per direction of EIC.
Testing and commissioning the whole dosing, alarming and detection system to be held in a mock drill operation as per wholly satisfaction of EIC.
Trail Operation and guarding of the entire installation of Gaseous Chlorination Plant by engaging one (1) no. personnel for a period of 3 (Three) months from the date of commissioning. 3 month x 33 nos.= 99 months
ORIENTAL ENGINEERING CO.
B T PROJECTS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .