Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹69,550Accepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹73,110+₹3,560 (5.12%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹74,000+₹4,450 (6.40%)Accepted-Finance | 3 | Accepted-Finance found eligible |
Tender Value
₹62,000
EMD Value
₹1,240
Closing Date
17 Jun 2022, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Repairs to 4 cusec discharge HC pump unit no. 02 along with other allied works at LIS Seripalai, Repairs to 2.5 cusec discharge HC Pump no. 03 at LIS Mukeri with allied works.
2022_IFC_172669_1
17/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹1,240
Office of the Executive Engineer MID Akhnoor/Nowsh
22 Jun 2022
6 Jun 2022
18 Jun 2022
6 Jun 2022
17 Jun 2022
7 Jun 2022
9 Jun 2022
Repair to 4 cusec discharge 60m Head H.C pump no. 02 installed at LIS Seripalai. The job involves de-coupling of pump from the motor and removing the top cover extraction of shaft and impeller assembly together with bearing bracket and shifting to workshop by using manual labour and mechanical transport. Complete dismantling of impeller assembly. Providing/ fitting of DE and NDE bearings(6310- 2nos.) & bushes (2nos) in lieu of worn out ones. Re-assembling of impeller shaft assembly and shifting back to site and there after lowering at proper position, placement of oil seal and closing the top cover along with P/F new nuts and bolts and studs coupling with motor. P/F of gland packing etc.and testing on load .. The Job includes cost of material, labour(skilled and unskilled) loading charges hire charge of tool and tackles To and transportation charges. Complete job
Repairs to 400 Amp main switch installed at LIS Seripalai . The job involves disconnecting the power cables on both input and output side.. Replacement of damaged HRC fuses of 400 A ( 3 nos.). Assembling of the Main switch. Fitting the main switch at designated place, connecting the cables by replacement of burnt / damaged thimbles on both input and output side. Testing the main switch on no load and then full load. Complete job includes cost of material , labour & transportation charges Complete Job
Repairs to 2.5 cusec discharge 30m head horizontal centrifugal pump no . 03 installed at LIS Mukeri . The job involves de-coupling of pump from the motor and removing top cover of the HC pump, extracting the internal impeller assembly together with bearing brackets and shifting the pump by head load to the road side and then loading in the vehicle and shifting to workshop. Complete dismantling of the impeller assembly in the workshop. P/F of 2-No bushes & 2-No bearings ( 3209) . Greasing of all the parts . Re-assembling of impeller shaft assembly & shifting back to L.I.S . Fitment of impeller shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Providing / fitting of gland packing, greasing work . Providing/fitting of coupling pulley as per sample along with nuts & bolts Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles, out station charges etc. Complete Job
Chargotra Trading Co.
R K Electrical and Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .