DSCO
Room no 401 402 Block B District Administration Complex Gurdaspur
Soil Esrosion protection Work
2026_DOA_168464_2
DSWC/GUR/2026-2027/02
Open Tender
Civil Works
Dhar kalan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹2.2 L
Yes
3 Jun 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-27/02
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
Soil Erosion Land Protection Works, Village Phagli, Run Off Control Str. Works, Village Masatpur, Soil Erosion Land Protection Works, Village Matti, Dala Balim, Village Awan, Village Ladheti, Village Janial, Village Samrala, Village Papial, Village Trehti Bassa, Village Kahanpur, Village Darkua Bangla Tikka Nagrota, Village Darkua Bangla, Village Sangar Basa, Village Akhwara, Village Muthi and Village Ladheti
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 10770670
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :- Soil Erosion Land Protection Works, Village Phagli, Distt. Pathankot.
Est. No. 14212/D.B, dated 22.08.2025, Amount 2156600/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Tank-1 168810 337486 -
2 Rain Water Harvesting Tank-2 168810 337486 -
3 Crate Wire Structure-1 169267 94773 -
4 Crate Wire Structure-2 187996 105236 -
5 Retaining Wall-1 91187 171576 -
6 Retaining Wall-2 95296 177359 -
7 Cost of Fencing RWHT 1 13711 11990 -
8 Cost of Fencing RWHT 2 13711 11990 -
Rain Water Harvesting Tank-1, COST OF MATERIAL
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 191 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 32.89 cum 992.97 per cum
3 Cost of Stone Aggregate 7.52 cum 582.25 per cum
4 Cost of Bajri 1.03 Cum 676.99 per cum
5 Cost of Boulder 100.32 cum 735.42 per cum
Rain Water Harvesting Tank-1, COST OF LABOUR
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of Rain Water Harvesting Tank +Long+Short Wall 258 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 7.6 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 1.14 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 30.4 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 60.8 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 76 Sqm 159.08
Rain Water Harvesting Tank-2, COST OF MATERIAL
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 191 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 32.89 cum 992.97 per cum
3 Cost of Stone Aggregate 7.52 cum 582.25 per cum
4 Cost of Bajri 1.03 Cum 676.99 per cum
5 Cost of Boulder 100.32 cum 735.42 per cum
Rain Water Harvesting Tank-2, COST OF LABOUR
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of Rain Water Harvesting Tank +Long+Short Wall 258 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 7.6 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 1.14 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 30.4 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 60.8 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 76 Sqm 159.08
Crate Wire Structure-1
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 121.5 cum 898.7 per cum
2 Cost of G.I crate wire (including GST) 841.5 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 54 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 382.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 382.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 121.5 cum 338.17
Crate Wire Structure-2
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 135 cum 898.7 per cum
2 Cost of G.I crate wire (including GST) 933.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 60 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 424.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 424.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 135 cum 338.17
Retaining Wall-1 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 102 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 17.68 cum 992.97 per cum
3 Cost of Stone Aggregate 5.31 cum 582.25 per cum
4 Cost of Bajri 0.75 Cum 676.99 per cum
5 Cost of Boulder 53.62 cum 735.42 per cum
Retaining Wall-1 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 21.44 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 5.36 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.84 cum 1396.94
4 Square rubble stone masonary 1:5 16.08 cum 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 32.66 cum 3486.03
Retaining Wall-2 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 107 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 18.59 cum 992.97 per cum
3 Cost of Stone Aggregate 6.18 cum 582.25 per cum
4 Cost of Bajri 0.88 Cum 676.99 per cum
5 Cost of Boulder 55.13 cum 735.42 per cum
Retaining Wall-2 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 23.4 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 6.24 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.98 cum 1396.94
4 Square rubble stone masonary 1:5 17.16 cum 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 32.96 cum 3486.03
Fencing of RWHT-1 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 7 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 0.49 cum 988.55 per cum
3 Iron Angle 1 QTL 4189 per Qtl
4 Cost of Bajri 0.97 Cum 672.57 per cum
5 GI Barbed Wire & GI Staple 88.05 KG 71.39 per Kg
Fencing of RWHT-1 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 1.2 meter high G.I barbed wire fencing with 1.8 meter angle iron 40x40x6mm placed every 3 meters centre 0.6 meter below ground level, every 15th post, end post, corner post suitably strutted and provided with 9 horizontal lines and 2 diagonal intewies with horizontal Wire fixed GI Staples, trun buckles etc including foundation 1:2:4 of size 0.30x0.30x0.75 m for each post complete as per technical clause 808 of MORT&H specifications 42 M 249.57 per M
2 CC 1:2:4 1.08 CUM 1396.94 per cum
Fencing of RWHT-2 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 7 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 0.49 cum 988.55 per cum
3 Iron Angle 1 QTL 4189 per Qtl
4 Cost of Bajri 0.97 Cum 672.57 per cum
5 GI Barbed Wire & GI Staple 88.05 KG 71.39 per Kg
Fencing of RWHT-2 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 1.2 meter high G.I barbed wire fencing with 1.8 meter angle iron 40x40x6mm placed every 3 meters centre 0.6 meter below ground level, every 15th post, end post, corner post suitably strutted and provided with 9 horizontal lines and 2 diagonal intewies with horizontal Wire fixed GI Staples, trun buckles etc including foundation 1:2:4 of size 0.30x0.30x0.75 m for each post complete as per technical clause 808 of MORT&H specifications 42 M 249.57 per M
2 CC 1:2:4 1.08 CUM 1396.94 per cum
WORK-2 :- Run off Conctrol Structure Works, Village Masatpur, Distt. Pathankot.
Est. No. 4204/D.B, Dated 10.02.2025, Amount 296387/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Run off Conctrol Structure Works 36176 62614 -
2 Run off Conctrol Structure Works 36176 62614 -
3 Run off Conctrol Structure Works 36176 62614 -
COST OF MATERIAL (Run off Conctrol Structure Works-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 39 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 6.69 cum 1110.68 per cum
3 Cost of Stone Aggregate 1.98 cum 645.21 per cum
4 Cost of Bajri 0.56 Cum 759.36 per cum
5 Cost of Boulder 19.06 cum 805.01 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 12.5 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 1.98 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 0.62 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 8.47 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 8.86 cum 3486.03
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 13.86 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 8 cum 874.41 per cum 6995.28
2 Cost of G.I crate wire (including GST) 77 Kg 71.39 per cum 5497.03
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 8 cum 38.98 311.84
2 Weaving of wire crate in mesh size 15cmX15cm 35 Sqm 61.1 2138.5
3 Spreading of wire crate over stone pitching & connecting all sides 35 Sqm 73.75 2581.25
4 Filling of stones in wire crate by hand packing manual labour 8 cum 338.17 2705.36
COST OF MATERIAL (Run off Conctrol Structure Works-2)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 39 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 6.69 cum 1110.68 per cum
3 Cost of Stone Aggregate 1.98 cum 645.21 per cum
4 Cost of Bajri 0.56 Cum 759.36 per cum
5 Cost of Boulder 19.06 cum 805.01 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 12.5 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 1.98 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 0.62 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 8.47 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 8.86 cum 3486.03
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 13.86 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 8 cum 874.41 per cum 6995.28
2 Cost of G.I crate wire (including GST) 77 Kg 71.39 per cum 5497.03
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 8 cum 38.98 311.84
2 Weaving of wire crate in mesh size 15cmX15cm 35 Sqm 61.1 2138.5
3 Spreading of wire crate over stone pitching & connecting all sides 35 Sqm 73.75 2581.25
4 Filling of stones in wire crate by hand packing manual labour 8 cum 338.17 2705.36
COST OF MATERIAL (Run off Conctrol Structure Works-3)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 39 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 6.69 cum 1110.68 per cum
3 Cost of Stone Aggregate 1.98 cum 645.21 per cum
4 Cost of Bajri 0.56 Cum 759.36 per cum
5 Cost of Boulder 19.06 cum 805.01 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 12.5 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 1.98 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 0.62 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 8.47 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 8.86 cum 3486.03
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 13.86 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 8 cum 874.41 per cum 6995.28
2 Cost of G.I crate wire (including GST) 77 Kg 71.39 per cum 5497.03
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 8 cum 38.98 311.84
2 Weaving of wire crate in mesh size 15cmX15cm 35 Sqm 61.1 2138.5
3 Spreading of wire crate over stone pitching & connecting all sides 35 Sqm 73.75 2581.25
4 Filling of stones in wire crate by hand packing manual labour 8 cum 338.17 2705.36
WORK-3 :- Soil Erosion Land Protection Works, Village Matti, Distt. Pathankot.
Est. No. 287/D.B, dated 06.05.2026, Amount 743800/-/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 480127 262177 -
2 Wall Painting 0 0 1500 1500
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 337.5 cum 931.88 per cum
2 Cost of G.I crate wire (including GST) 2319.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 150 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1054.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1054.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 337.5 cum 338.17
WORK-4 :- Soil Erosion Land Protection Works, Village Dala Balim Distt. Pathankot.
Est. No. 6149/D.B, dated 11.02.2026, Amount 458200/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 291061 167144 -
2 Wall Painting 0 0 0 0
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 232.5 cum 827.48 per cum
2 Cost of G.I crate wire (including GST) 1382.2 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 97.5 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 628.25 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 628.25 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 232.5 cum 338.17
WORK-5 :- Soil Erosion Land Protection Works, Village Awan Distt. Pathankot.
Est. No. 2451/D.B, dated 02.07.2025, Amount 293700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Triple Step Crate Wire Structure 188536 105235 -
2 Wall Painting 0 0 0 0
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 135 cum 902.7 per cum
2 Cost of G.I crate wire (including GST) 933.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 60 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 424.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 424.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 135 cum 338.17
WORK-6 :- Soil Erosion Land Protection Works, Village Ladheti Distt. Pathankot.
Est. No. 6940/D.B, dated 13.03.2026, Amount 488100/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure-1 149287 94772 -
2 Crate Wire Structure-2 149287 94772 -
Crate Wire Structure-1
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 121.5 cum 734.26 per cum
2 Cost of G.I crate wire (including GST) 841.5 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 54 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 382.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 382.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 121.5 cum 338.17
Crate Wire Structure-2
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 121.5 cum 734.26 per cum
2 Cost of G.I crate wire (including GST) 841.5 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 54 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 382.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 382.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 121.5 cum 338.17
WORK-7 :- Soil Erosion Land Protection Works, Village Janial Distt. Pathankot.
Est. No. 173/D.B, dated 24.04.2026, Amount 484400/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 316454 168012 -
2 Wall Painiting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 216 cum 973.17 per cum
2 Cost of G.I crate wire (including GST) 1488.3 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 96 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 676.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 676.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 216 cum 338.17
WORK-8 :- Soil Erosion Land Protection Works, Village Samrala Distt. Pathankot.
Est. No. 14216/D.B, dated 22.08.2025, Amount 1487600/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Triple Step Crate Wire Structure 984079 503597 -
2 Wall Painting 0 0 0 0
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 697.5 cum 981.98 per cum
2 Cost of G.I crate wire (including GST) 4190.34 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 279 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1904.7 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1904.7 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 697.5 cum 338.17
WORK-9 :- Soil Erosion Land Protection Works, Village Papial Distt. Pathankot.
Est. No. 4395/D.B, dated 17.10.2026, Amount 743300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure-1 470316 273053 -
2 Wall Painting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 345 cum 857.01 per cum
2 Cost of G.I crate wire (including GST) 2446.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 165 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1112 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1112 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 345 cum 338.17
WORK-10 :- Soil Erosion Land Protection Works, Village Trehti Bassa, Distt. Pathankot.
Est. No. 3448/D.B, dated 21.08.2025, Amount 467400/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall-1 32643 69429 -
2 Retaining Wall-2 115221 250121 -
Retaining Wall-1 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 41 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 7.13 cum 894.89 per cum
3 Cost of Stone Aggregate 1.98 cum 429.42 per cum
4 Cost of Bajri 0.27 Cum 557.92 per cum
5 Cost of Boulder 22 cum 589.22 per cum
Retaining Wall-1 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 10 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 2 cum 1396.94
3 DPC on Top of wall in 1:2;4 8 cum 2999.31
4 Square rubble stone masonary 1:5 12 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 0.3 cum 1396.94
Retaining Wall-2 COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 144 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 24.98 cum 894.89 per cum
3 Cost of Stone Aggregate 5.94 cum 429.42 per cum
4 Cost of Bajri 0.81 Cum 557.92 per cum
5 Cost of Boulder 79.2 cum 589.22 per cum
Retaining Wall-2 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 30 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 6 cum 1396.94
3 DPC on Top of wall in 1:2;4 24 cum 2999.31
4 Square rubble stone masonary 1:5 48 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 0.9 cum 1396.94
WORK-11 :- Soil Erosion Land Protection Works, Village Kahanpur Distt. Pathankot.
Est. No. 3851/D.B, dated 09.09.2026, Amount 417300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 259846 157550 -
2 Wall Painting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 202.5 cum 791.04 per cum
2 Cost of G.I crate wire (including GST) 1396 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 90 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 634.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 634.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 202.5 cum 338.17
WORK-12 :- Soil Erosion Land Protection Works, Village Darkua Bangla, Distt. Pathankot.
Est. No. 177/D.B, dated 24.04.2026, Amount 498900/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall-1 175370 323619 -
2 Other Expenditure 0 0 -
Retaining Wall COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 182 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 31.74 cum 1059.25 per cum
3 Cost of Stone Aggregate 102.47 cum 801.7 per cum
4 Cost of Bajri 0.84 Cum 743.27 per cum
5 Cost of Boulder 6.75 cum 648.53 per cum
Retaining Wall-1 COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 34.1 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 6.82 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.93 cum 1396.94
4 Square rubble stone masonary 1:5 27.28 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 65.88 cum 3486.03
WORK-13 :- Soil Erosion Land Protection Works, Village Darkua Bangla Tikka Nagrota Distt. Pathankot.
Est. No. 189/D.B, dated 24.04.2026, Amount 457800/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 302761 155119 -
2 Wall Painting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 210 cum 991.49 per cum
2 Cost of G.I crate wire (including GST) 1324.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 75 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 602 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 602 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 210 cum 338.17
WORK-14 :- Soil Erosion Land Protection Works, Village Sangar Basa Distt. Pathankot.
Est. No. 669/D.B, dated 24.04.2026, Amount 436300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall 140720 295606 -
2 Other Expenditure 0 0 -
Retaining Wall COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 170 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 29.58 cum 927.89 per cum
3 Cost of Stone Aggregate 93.65 cum 623.67 per cum
4 Cost of Bajri 0.89 Cum 592.51 per cum
5 Cost of Boulder 7.19 cum 464.62 per cum
Retaining Wall COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 36.3 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 7.26 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.99 cum 1396.94
4 Square rubble stone masonary 1:5 29.04 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 56.1 cum 3486.03
WORK-15 :- Soil Erosion Land Protection Works, Village Akhwara Distt. Pathankot.
Est. No. 185/D.B, dated 24.04.2026, Amount 481700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall 174669 307063 -
2 Other Expenditure 0 0 -
Retaining Wall COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 185 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 32.21 cum 1093.06 per cum
3 Cost of Stone Aggregate 10.1 cum 627.59 per cum
4 Cost of Bajri 1.15 Cum 756.09 per cum
5 Cost of Boulder 97.48 cum 787.4 per cum
Retaining Wall COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 51 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 10.2 cum 1396.94
3 DPC on Top of wall in 1:2;4 1.28 cum 1396.94
4 Square rubble stone masonary 1:5 47.81 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 40.8 cum 2999.31
WORK-16 :- Soil Erosion Land Protection Works, Village Muthi, Distt. Pathankot.
Est. No. 193/D.B, dated 24.04.2026, Amount 489600/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 311175 178475 -
2 Wall Painting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 229.5 cum 864.18 per cum
2 Cost of G.I crate wire (including GST) 1580.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 102 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 718.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 718.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 229.5 cum 338.17
WORK-17 :- Soil Erosion Land Protection Works, Village Ladheti, Distt. Pathankot.
Est. No. 3142/D.B, dated 06.08.2025, Amount 369600/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 224736 144896 -
2 Wall Painting 0 0 -
Crate Wire Structure
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 172.5 cum 745.77 per cum
2 Cost of G.I crate wire (including GST) 1346 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 103.5 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 612 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 612 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 172.5 cum 338.17
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 0.56 MB
DNIT2.pdf
Tender Documents • 0.55 MB
FB2.xls
Additional Documents • 0.15 MB
Download all tender documents and submit your bid