Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹3.7 L+₹1.8 L (100.5%)Rejected-Finance 3 NEW TRIMURTY CO OP HOUSING SOCIETY INGOLE NAGAR WARDHA ROAD NAGPUR 440005 MAHARASTRA | NAGPUR | NAGPUR | MAHARASHTRA | 440005 | L2 | Rejected-Finance Being higher bidder |
Tender Value
₹3.7 L
EMD Value
₹7,350
Closing Date
14 Nov 2024, 6:00 pmClosed
CWE (AF) Agra
HQ CWE (AF) Agra PIN 282008
CONSULTANCY FOR SOIL INVESTIGATION FOR PROVN OF DSC MESS ALONGWITH LIVING IN ACCOMMODATION AT NEW LOCATION OF AF STN SONEGAON
2024_MES_668412_2
80024-15/E8
Open Tender
Civil Works
Item Rate
90 days
AGE(I) Air Force Sonegon Nagpur
As per tender documents
9 documents required · 9 mandatory
₹300
AGE (I) AF Sonegaon Nagpur
₹7,350
Yes
25 Nov 2024
19 Oct 2024
21 Nov 2024
19 Oct 2024
14 Nov 2024
26 Oct 2024
Amount
Conducting soil investigation test at site as per relevant specification of IS-2131, IS-6403, IS-1498 & IS-2720 and submit the report as per following including shifting of equipment from one place to another place at any distance :- (A) Drilling of 150 mm diameter bore hole in all types of soils as per depth indicated below or refusal strata which ever is earlier as per instruction of the Eng-in-charge. Refusal defined as and when 'N' value is 100 or more for 30 cm or part penetration. (a) Conducting standard penetration test (SPT) in the bore holes at 1.00 m intervals in depth or every change of strata which ever is earlier as per IS:2131-1981or Conducting dynamic cone penetration test (DCPT) in the bore holes at 1.00 m intervals in depth or every change of strate which ever is earlier as per IS:10042-1981 (Applicable for gravel, boulder deposit type of soil) (i) Depth of bore hole = 10m (ii) No of bore hole= 05 Nos (b) Collecting disturbed and undisturbed soil sample from the location of conducting SPT/DCPT at an interval of 1.00 m depth or at change of strata whichever occurs earlier. (c) Conducting following lab test on disturbed soil samples as considered necessary according to relevant specification IS-2720 and detailed result to be given in tabular form:- (i) Sieve analysis & Grain size distribution by Sieve analysis & hydrometer test (ii) Atterberg's limit as per IS:2720 Part-5-1985 (iii) Natural moisture content (iv) Particle size analysis test (v) Bulk density/dry density
(d) Conducting following lab test on Un disturbed soil samples as considered necessary according to relevant specification IS-2720 and detailed result to be given in tabular form:- (i) Natural moisture content (ii) Bulk density (iii) Specific gravity (iv) Free swell index and swelling properties of soil (v) Organic matter in soil if any (vi) Consolidation test (compressed index value) (vii)Triaxial compression test and determination of shear parameters (C&Ø test) as per relevant IS (viii) Harmful salt (complete investigation as already ref) (e) Analysis of liquefaction potential for earthquake as per zone-III of IS:1893-2016 (part-1) (f) Ground Water Table & HFL : (i) Maximum and minimum levels of ground water in the area with source of information. (ii) Ground water table observed during the investigation. (iii) Recording the ground water table if observed upto exploration depth, as per IS:6395-1973 (g) The SBC of the soil is required to be given as per following table, calculation of bearing capacity will be governed generally as per IS:8009 Part-1-1976, IS:2720 Part-2-1980, IS:6403-1980, IS:1904-1986 & IS:1080-1985 and other relevant IS codes and detailed calculations duly showing the various soil parameters/indices shall be given in the soil report referred in SCHEDULE ‘A’ NOTES. (B) Preparation of Soil investigation Report : (i) A detailed site plan showing the approx location of each bore duly numbered as per log of borehole should be enclosed with every site's soil investigation report. Location of foundation of adjacent structure, especially those that might be impacted by the proposed construction should be indicated with details in site plan. (ii) Every page of the Soil Investigation Report should have the Name of the Job for which Soil Investigation is being carried out. In case of multiple sites of a single Job are being investigated name of each site shall be put on each page of report pertaining to the site alongwith the name of the Job.
(iii) All pages of the Soil Investigation Report shall be serially numbered, stamped and signed by the Agency carrying out the soil investigation. Report should be scrutinized by AGE(I) & CWE for correctness & endorsed. (iv) Detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grain size distribution curves, compressive index curves, site plan etc, stress-strain modulus (by stress-strain curves from triaxial tests), foundation analysis & recommendations with supporting calculations regarding foundation system, depth of foundation. (v) Six copies of ink signed test reports should be submitted with details description of field investigation carried out, soil classification and general nature of soil strata, water table, interpretation of test results, grain size distribution curves, compressive index curve, site plan etc listed in preceding paragraphs. (vi) Photographic record of geo-explorations as well as testing shall also form part of the report.
(vii) Plotting of a compiled sub-surface profile along the depth in both plan directions (viii) Estimation of safe side slopes for excavation (ix) Suitability of excavated material as back fill (x) To check for liquefaction potential. (xi) Soil investigation for ordinary rock or hard rock type soil shall be done as specified in IS-12070-1987 Table-I (xii) Any other pertinent information relating to foundation design considered necessary alongwith recommendation regarding type of foundation to be adopted and also recommendation on stability of soil with requirement of soil stabilization if any. (xiii) The GE shall intimate the approximate type of construction, utilization and dimensions of proposed bldgs to the consultant, who based on geotechnical investigation, should recommend type of foundation (viz isolated/combined footing, raft, pile etc) (xiv) In case of underground building basement construction, or if requirement of temporary/permanent deep excavation support measures during construction of building are envisaged necessary excavation support measures to be given by the consultant based on geotechnical investigations. (xv) Soil investigation report should be signed by M. Tech (Geotech). (xvi) Transportation of equipment/mobilization/Dematerialization of equipment, etc forsoil investigation
M/S. BECQUEREL INDUSTRIES PVT. LTD. (BID ID -3154041)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .