Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -12.50% | ₹12.8 L | L1 | Admitted-Finance |
Tender Value
₹14.7 L
EMD Value
₹10,989
Closing Date
8 Jul 2026, 5:30 pmClosed
Sushil Katare
Gwalior Municipal Corporation
Moulik Nidhi Maintenance Work at Ram Field and Naveen Hall Nirman Ward 06. Zone 02. File No. 115/26X3/3. 2nd Call
2026_UAD_505390_2
MPGMC/115/26x3/3/jan/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Jankarya Department
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹10,989
22 Jul 2026
23 Jun 2026
10 Jul 2026
24 Jun 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation, trenches for
pipes / cables or drains etc. by mechanical means /
manual means (exceeding 30cm in depth.) including
ramming of bottom, dressing of sides, disposal of excavated
earth including of all lift and lead upto 50m. Disposed earth
to be levelled and neatly dressed.All kinds of soil | 1 | CUM | - | - |
| 2 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering All work up to plinth
levelCement concrete grade M-10 (Nominal Mix) with 40 mm maximum
size of stone aggregate | - | CUM | - | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth
with Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | - | - |
| 4 | Providing and laying in position specified grade of reinforced
cement concrete excluding the cost of centering, shuttering,
finishing and reinforcement - All work up to plinth level :
5.1.1 Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size
of stone aggregate | - | CUM | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string courses,
fillets, columns, pillars, piers, abutments, posts and struts etc.above
plinth level and up to floor two level excluding cost of centering,
shuttering and reinforcement etc.
5.2.1 Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size
of stone aggregate. | 1 | CUM | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies, shelves, chajjas, lintels,
bands, plain window sills, staircases and spiral stair cases up to floor
two level excluding the cost of centering, shuttering and reinforcement
with Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum
size of stone aggregate. | - | CUM | - | - |
| 7 | Centering and shuttering including strutting, propping stretching etc.
complete for and removal of form work by sheet plate or ply wood
shuttering for :
19.1.1 Foundations, footings, bases of columns, etc. For mass concrete | - | SQM | - | - |
| 8 | Centering and shuttering including strutting, propping stretching et19.1.3 Suspended floors, roofs, landings, balconies and access platform. | - | sqm | - | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding upto floor level including cost
of binding wire, wastage and over laps upto 12mm horizontal/ inclined
position of reinforcement bars in slab and beams, plinth, chajjas,
lintels, upto 4.5m vertical length of reinforcement in wall columns (over
laps shall be provided as per requirement of IS : 13920; IS 456 & SP :
34) etc. complete.Thermo-Mechanically Treated bars. (Fe 500 D or more)
TAKE 1.2%STEEL OF TOTAL CONCRETE | - | kg | - | - |
| 10 | Brick work with chimeny brick of class designation 40 in superstructure
above plinth level upto floor 2 level including the cost of scaffolding in : Brick work with chimeny brick of class designation 40 in superstructure
above plinth level upto floor 2 level including the cost of scaffolding in : | - | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
TenderDocument.pdf
Tender Documents • 5.90 MB
NIT02.pdf
Other Document • 1.44 MB
Drawing115.pdf
Other Document • 0.59 MB
BOQ_622921.xls
BOQ • 0.28 MB
Estimete115.pdf
Additional Documents • 7.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .