Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical TENDER DOCUMENT COMPLETED |
| 2 | Accepted-Technical | Accepted-Technical TENDER DOCUMENT COMPLETED |
Tender Value
Refer Docs
EMD Value
₹13,300
Closing Date
2 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
up state construction and infrastructure development corporation ltd. Lalitpur near DPRO office
VIDHAYAK NIDHI 2025-26 KE ANTARGAT CONSTRUCTION OF CLASS ROOM IN CHANDRASHEKHAR AJAD PUBLIC SCHOOL IN VILL- SATARWANS BLOCK- BIRDHA , DIST- LALITPUR
2026_SCIDC_1141159_1
12/EE/ET/LTP/2026-27
Open Tender
Civil Works
Percentage
120 days
block birdha village satarwansh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,062
EXECUTIVE ENGINEER UP SCIDCO LTD.
₹13,300
8 May 2026
24 Apr 2026
2 May 2026
24 Apr 2026
2 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | CLASSROOM | - | - | - | - |
| 0.02 | Excavation in foundation in ordinary soil (loam clay, or moorum) including lift upto 1.5 metre (5 fts.) and lead upto 30m (100 fts) & including filling, watering and ramming of excavated earth. into the trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m(100fts) from the foundation trenches. as in item no. (251) above but excavation in soil mixed with moorum/shingle/kankar requiring the use of special T&P such as pickaxes, sabbals etc. | - | cum | - | - |
| 0.03 | Cement concrete with 4 cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4 2: including supply of all materials, labour and T & P etc. required for proper completion of the work.As In een No. 279) above but in the proportion of 8:4: 1 - (L.C. in 1:4:8 ct :c/s: s/B (40mm) | - | cum | 1 | - |
| 0.04 | R.C.R.stone masonery work in foundation in 1:6 cement:sand mortar including Supply of all Material labour T&P | 1 | cum | - | - |
| 0.05 | Rcc work with cement opproved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and itsbinding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but in R.C.C. at foundation and footing with 4 cm. (1.5") gauge approved stone ballast. (R.c.c. in 1:1,1/2:3 ct:c/s:s/g in col. footing) | - | cum | - | - |
| 0.06 | Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. (R.C.C. in 1:1,1/2:3 ct:c/s:s/g in tie beam & plinth Beam) | - | cum | 1 | - |
| 0.07 | Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. (R.C.C. in 1:1,1/2:3 ct:c/s:s/g in tie beam & plinth Beam) | - | cum | - | - |
| 0.08 | Rcc work with cement opproved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but in Rcc T beam and slab roofs and R.c.c. columns. | - | cum | - | - |
| 0.09 | Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but for slab. (R.c.c. in 1:1x1/2:3(ct:c/s:s/g) in Rcc Column | 1 | cum | 1 | ₹1 |
| 0.1 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | sqm | 1 | ₹1 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.44 MB
BOQ_2130890.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .