Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| 4 | Rejected-Technical | Rejected-Technical Not meeting Annual Turnover eligibility criteria |
Tender Value
₹10.0 L
EMD Value
₹19,960
Closing Date
1 May 2024, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, CEG
Civil Engineering Group, CDO Building, IGCAR, Kalpakkam - 603 102
Cleaning of Storm water drains, roads and water table from new IGCAR gate to Main gate at Kalpakkam for the year 2024-2025.
2024_IGCAR_803986_1
CEG/IGC/1987/2024
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
8 documents required · 8 mandatory
₹0
₹19,960
18 Jun 2024
16 Apr 2024
2 May 2024
16 Apr 2024
1 May 2024
18 Apr 2024
Amount
Clearing the Strom water drain once in 3months and when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris materials upto 200m etc., and stacking for disposal upto 200m lead etc complete as directed by the Engineer-in-charge. Note: 1) Every time cleaning area shall be measured for payment 2) The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour. 3) The contractor shall supply the necessary PPE to the workers.
500mm to 1000mm wide without cover slab
1000mm to 2000mm wide without cover slab
2000mm to 6000mm wide without cover slab
Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads inside IGCAR complex area two times in a Month and when and where ever required including collecting upto 200m and stacking swept material for disposal upto 4km and as directed by the Engineer-in-charge. Note: 1) Every time cleaning area shall be measured for payment 2) The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour. 3) The contractor shall supply the necessary PPE to the workers.
Levelling, bull-dozing the heeped/dumped loosened earth/debris etc. to form approach along the drain line and inner patrolling compound alignment by hiring JCB/Bull-dozer etc., including labour if any required to the specified width as directed by the Engineer-in-Charge.
Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead of upto 4km including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth & debris shall be dumped well inside the Dumping yard and not over approach pathway road.
Clearing blockage in storm water drain, mouth outlets, road side berm rain water pipes, cutting and removing of fallen trees etc., during the monsoon period, cyclone time and rainy days and all other essential miscellaneous works etc., complete as directed by the Engineer-in-charge. Note: 1) Contractor has to engage a minimum of 2 number of male coolies in each shift every day during the monsoon period, rainy days & cyclone period including holidays (Timing of shifts – General shift 9:00 hours – 17:30 hours ; 1st shift 6:00 hours to 14:00 hours ; 2nd shift 14:00 hours to 22:00 hours ; 3rd shift 22:00 hours to 6:00 hours). If any short fall found during the contract period he will be penalised at the rate of 1.0 unit/Male coolie/shift shall be deducted from the RA bills. 2) Providing all PPE like Raincoat, Gumboot, PVC Hand Gloves to the workers including necessary vehicle arrangements. 3) Providing hand torches to the workers during night time.
K.MADHUKAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .